Temporary chemical block brings efficiency and economy to eastern U.S. workover operations

J. Terracina, Mccabe, J. W. Cramer, J. E. Legenza
{"title":"Temporary chemical block brings efficiency and economy to eastern U.S. workover operations","authors":"J. Terracina, Mccabe, J. W. Cramer, J. E. Legenza","doi":"10.2118/19326-PA","DOIUrl":null,"url":null,"abstract":"Operators performing workovers on gas-storage wells in the eastern regions of the U.S. have improved operations and reduced expenses by using GP's to control wells while work is in progress. A large number of the gas-storage wells were drilled in the 1950's and 1960's and have nonstandard equipment that limits the use of other well-control methods during the initial stages of workover. The GP is a highly viscous fluid that can be crosslinked to form a viscous plug. GP's can be tailored to break back to a less viscous fluid for removal, or they can be broken by acid. Using this type plug can eliminate the need for various packers, bridge plugs, and associated surface equipment usually needed to control or kill a well while remedial workovers are performed. This paper describes chemistry, operating ranges (temperature), and application procedures pertinent to GP's. Also presented are field case histories where GP's were successfully used to plug a well for running casing inspection logs, to plug a ell to permit replacement of tubing and wellhead equipment, and to kill a well temporarily to replace an old wellhead and then place a mechanical plug for a cement squeeze job or additional workover operations.","PeriodicalId":22020,"journal":{"name":"Spe Production Engineering","volume":"17 3 1","pages":"70-74"},"PeriodicalIF":0.0000,"publicationDate":"1992-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/19326-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

Operators performing workovers on gas-storage wells in the eastern regions of the U.S. have improved operations and reduced expenses by using GP's to control wells while work is in progress. A large number of the gas-storage wells were drilled in the 1950's and 1960's and have nonstandard equipment that limits the use of other well-control methods during the initial stages of workover. The GP is a highly viscous fluid that can be crosslinked to form a viscous plug. GP's can be tailored to break back to a less viscous fluid for removal, or they can be broken by acid. Using this type plug can eliminate the need for various packers, bridge plugs, and associated surface equipment usually needed to control or kill a well while remedial workovers are performed. This paper describes chemistry, operating ranges (temperature), and application procedures pertinent to GP's. Also presented are field case histories where GP's were successfully used to plug a well for running casing inspection logs, to plug a ell to permit replacement of tubing and wellhead equipment, and to kill a well temporarily to replace an old wellhead and then place a mechanical plug for a cement squeeze job or additional workover operations.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
临时化学块为美国东部修井作业带来了效率和经济效益
运营商在美国东部地区对储气井进行修井作业时,通过使用GP来控制井,提高了作业效率,降低了成本。大量的储气井是在上世纪五六十年代钻井的,在修井的初始阶段,由于设备不标准,限制了其他井控方法的使用。GP是一种高粘性流体,可以交联形成粘性塞。GP可以被定制,以分解回粘性较低的流体中进行移除,或者它们可以被酸破坏。使用这种类型的桥塞可以消除对各种封隔器、桥塞和相关地面设备的需求,这些设备通常需要在进行补救修井时进行控制或压井。本文介绍了与GP相关的化学成分、操作范围(温度)和应用程序。此外,还介绍了一些现场案例,其中GP成功地用于封井以进行套管检查测井,封井以更换油管和井口设备,以及临时压井以更换旧井口,然后放置机械塞进行水泥挤压作业或额外的修井作业。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Phase splitting of wet steam in annular flow through a horizontal impacting tee Corrosion performance of welded CRA-lined pipes for flowlines Breaker concentrations required to improve the permeability of proppant packs damaged by concentrated linear and borate-crosslinked fracturing fluids Incorporation of 2D fluid flow into a pseudo-3D hydraulic fracturing simulator Application of curable resin-coated proppants
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1