Youjun An, Chuwei Li, Xiaohui Chen, Yinghe Li, Ziye Zhao, H. Cao
{"title":"An optimal energy-efficient scheduling with processing speed selection and due date constraint in a single-machine environment","authors":"Youjun An, Chuwei Li, Xiaohui Chen, Yinghe Li, Ziye Zhao, H. Cao","doi":"10.1177/09544054231180659","DOIUrl":null,"url":null,"abstract":"To relive the pressure of electricity grid during the peak period, time-of-use (TOU) pricing strategy has been implemented in industries to encourage manufacturers to transfer some processing tasks from peak periods to non-peak periods, and the due date of each job cannot be violated. Under these contexts, this paper addresses a speed-scaling single machine scheduling problem with due date constraint to minimize the total electricity cost (TEC). More precisely, the main innovative works are described as follows: (1) seven critical problem properties (including four theorems and three lemmas) based on different processing time window forms are formally derived; and (2) a property-based genetic algorithm (PGA) with hybrid initialization method is designed according to the characteristics of the studied problem. In the numerical experiments, the Taguchi method of design-of-experiment is employed to seek the optimal combination of four key parameters in PGA. Subsequently, the effectiveness and superiority of the proposed hybrid initialization method and problem properties are separately demonstrated by randomly generated 20 instances. After that, compared with other two traditional scheduling strategies, the proposed energy-efficient strategy can save at least 16% of TEC on average. Next, a relaxation coefficient (CR) is designed to measure the intrinsic link between TEC and the instance parameters (i.e. the due date and normal processing time). Finally, a real case is presented to verify the benefits of the proposed PGA algorithm and variable processing speeds, and the results show that the newly generated scheduling scheme based on the proposed PGA can reduce up to 46.36% of TEC compared with the existing company’s scheduling scheme.","PeriodicalId":20663,"journal":{"name":"Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture","volume":"24 1","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2023-06-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1177/09544054231180659","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MANUFACTURING","Score":null,"Total":0}
引用次数: 0
Abstract
To relive the pressure of electricity grid during the peak period, time-of-use (TOU) pricing strategy has been implemented in industries to encourage manufacturers to transfer some processing tasks from peak periods to non-peak periods, and the due date of each job cannot be violated. Under these contexts, this paper addresses a speed-scaling single machine scheduling problem with due date constraint to minimize the total electricity cost (TEC). More precisely, the main innovative works are described as follows: (1) seven critical problem properties (including four theorems and three lemmas) based on different processing time window forms are formally derived; and (2) a property-based genetic algorithm (PGA) with hybrid initialization method is designed according to the characteristics of the studied problem. In the numerical experiments, the Taguchi method of design-of-experiment is employed to seek the optimal combination of four key parameters in PGA. Subsequently, the effectiveness and superiority of the proposed hybrid initialization method and problem properties are separately demonstrated by randomly generated 20 instances. After that, compared with other two traditional scheduling strategies, the proposed energy-efficient strategy can save at least 16% of TEC on average. Next, a relaxation coefficient (CR) is designed to measure the intrinsic link between TEC and the instance parameters (i.e. the due date and normal processing time). Finally, a real case is presented to verify the benefits of the proposed PGA algorithm and variable processing speeds, and the results show that the newly generated scheduling scheme based on the proposed PGA can reduce up to 46.36% of TEC compared with the existing company’s scheduling scheme.
期刊介绍:
Manufacturing industries throughout the world are changing very rapidly. New concepts and methods are being developed and exploited to enable efficient and effective manufacturing. Existing manufacturing processes are being improved to meet the requirements of lean and agile manufacturing. The aim of the Journal of Engineering Manufacture is to provide a focus for these developments in engineering manufacture by publishing original papers and review papers covering technological and scientific research, developments and management implementation in manufacturing. This journal is also peer reviewed.
Contributions are welcomed in the broad areas of manufacturing processes, manufacturing technology and factory automation, digital manufacturing, design and manufacturing systems including management relevant to engineering manufacture. Of particular interest at the present time would be papers concerned with digital manufacturing, metrology enabled manufacturing, smart factory, additive manufacturing and composites as well as specialist manufacturing fields like nanotechnology, sustainable & clean manufacturing and bio-manufacturing.
Articles may be Research Papers, Reviews, Technical Notes, or Short Communications.