Importance of representative metallurgical sampling and testwork programmes to reduce project risk – a gold case study

S. Dominy, Louisa O’Connor, Saranchimeg Purevgerel
{"title":"Importance of representative metallurgical sampling and testwork programmes to reduce project risk – a gold case study","authors":"S. Dominy, Louisa O’Connor, Saranchimeg Purevgerel","doi":"10.1080/25726668.2019.1628462","DOIUrl":null,"url":null,"abstract":"ABSTRACT When developing a process flowsheet, the risks in achieving positive financial outcomes are minimised by ensuring representative metallurgical samples and quality testwork. A case study is presented based on an underground gold operation, where poor metallurgical sampling led to grade and recovery underperformance. Sampling-related issues included: poor liaison between geologists and metallurgists; poor domaining; too few metallurgical samples collected and tested; unrepresentative sample composites and sub-samples; poor laboratory practice; and a lack of documentation and QAQC. These issues led to disruption over four years and are estimated to have cost around US$115M in lost revenue and US$7.5M in corrective expenditure. After an initial characterisation programme, a variability mini-bulk sampling and testwork phase was undertaken. This was followed by a pilot programme, progressing to trial mining and production. The paper emphasises the need for fit for purpose metallurgical sampling and testwork, and the early application of variability sampling.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"20 1","pages":"230 - 245"},"PeriodicalIF":1.8000,"publicationDate":"2019-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/25726668.2019.1628462","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 4

Abstract

ABSTRACT When developing a process flowsheet, the risks in achieving positive financial outcomes are minimised by ensuring representative metallurgical samples and quality testwork. A case study is presented based on an underground gold operation, where poor metallurgical sampling led to grade and recovery underperformance. Sampling-related issues included: poor liaison between geologists and metallurgists; poor domaining; too few metallurgical samples collected and tested; unrepresentative sample composites and sub-samples; poor laboratory practice; and a lack of documentation and QAQC. These issues led to disruption over four years and are estimated to have cost around US$115M in lost revenue and US$7.5M in corrective expenditure. After an initial characterisation programme, a variability mini-bulk sampling and testwork phase was undertaken. This was followed by a pilot programme, progressing to trial mining and production. The paper emphasises the need for fit for purpose metallurgical sampling and testwork, and the early application of variability sampling.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
具有代表性的冶金取样和测试工作方案对降低项目风险的重要性——一个黄金案例研究
在制定工艺流程表时,通过确保具有代表性的冶金样品和质量测试工作,将实现积极财务结果的风险降至最低。以某地下金矿开采为例,介绍了冶金取样不良导致品位和回收率不佳的情况。与抽样有关的问题包括:地质学家和冶金学家之间联络不良;可怜的领域;收集和测试的冶金样品太少;非代表性样品复合材料和子样品;实验室操作规范差;缺乏文件和质量保证。这些问题导致了四年的中断,估计造成了约1.15亿美元的收入损失和750万美元的纠正支出。在初始表征程序之后,进行了可变性小批量采样和测试工作阶段。随后是一个试点方案,逐步进行采矿和生产试验。本文强调了适合冶金目的的取样和试验工作的必要性,以及变异性取样的早期应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.20
自引率
9.10%
发文量
5
期刊最新文献
Digital twins in the minerals industry – a comprehensive review Mining Metaverse – a future collaborative tool for best practice mining Reliability evaluation of CAN-bus connectors with tailored testing Sustainable open pit fleet management system: integrating economic and environmental objectives into truck allocation A Genetic algorithm scheme for large scale open-pit mine production scheduling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1