J. Parílková, Zbyněk Zachoval, A. Gruchot, T. Zydroń
{"title":"APPLICATION OF THE ELECTRICAL IMPEDANCE SPECTROMETRY METHOD FOR MONITORING FILTRATION PHENOMENA ON THE EXAMPLE OF KAROLINKA EARTH DAM","authors":"J. Parílková, Zbyněk Zachoval, A. Gruchot, T. Zydroń","doi":"10.15576/asp.fc/2018.17.1.149","DOIUrl":null,"url":null,"abstract":"The paper presents the results of monitoring electrical properties of the soil of the body of the earth-fill dam of the Karolinka water reservoir in the fourth year after its reconstruction ended. Monitoring was carried out using the Z-meter device applying the electric impedance spectrometry method with the focus on seepage through the earth-fill dam of the water reservoir. Information about the changes that occurred in the dam body before and after the implementation of the measure (the construction of a cut-off wall when the dam was reconstructed in 2013) was obtained by monitoring the changes of the electrical resistances of the soil of the dam with time.","PeriodicalId":51904,"journal":{"name":"Acta Scientiarum Polonorum-Formatio Circumiectus","volume":"53 1","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Acta Scientiarum Polonorum-Formatio Circumiectus","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15576/asp.fc/2018.17.1.149","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"AGRONOMY","Score":null,"Total":0}
引用次数: 1
Abstract
The paper presents the results of monitoring electrical properties of the soil of the body of the earth-fill dam of the Karolinka water reservoir in the fourth year after its reconstruction ended. Monitoring was carried out using the Z-meter device applying the electric impedance spectrometry method with the focus on seepage through the earth-fill dam of the water reservoir. Information about the changes that occurred in the dam body before and after the implementation of the measure (the construction of a cut-off wall when the dam was reconstructed in 2013) was obtained by monitoring the changes of the electrical resistances of the soil of the dam with time.