Advances in Intelligent Expert Systems for Risk Analysis in a Complex Business Environment with Appropriate Solutions

IF 0.9 Q3 ENGINEERING, MULTIDISCIPLINARY International Journal of Reliability Quality and Safety Engineering Pub Date : 2022-06-27 DOI:10.1142/s0218539322400058
Honglei Zhang, Zhenbo Zang, Hongjun Zhu, C. Vignesh
{"title":"Advances in Intelligent Expert Systems for Risk Analysis in a Complex Business Environment with Appropriate Solutions","authors":"Honglei Zhang, Zhenbo Zang, Hongjun Zhu, C. Vignesh","doi":"10.1142/s0218539322400058","DOIUrl":null,"url":null,"abstract":"Today’s commonly used risk management procedures allow the planning team to focus on sensitive areas. It focuses the project team’s attention on activities and resources when a great risk threat exists or when the most time- and effective-engineering solutions can achieve expense reductions. Industrial security issues have worsened dramatically over the last decade. Over time, the risks in the sector rose as limited, single-train or batch operations shifted to massive multi-train operations. Often an accident leads to detrimental effects: shutting down the operation, loss of life, environmental disruption, and loss of business. The reparation of losses from the budget is unwelcome since the government’s reserve will not cope with these needs. This paper has a definitive comparative edge for company sponsors for project risk management (PRM) strategy. The sponsors who knowingly take chances, forecast unfavorable developments, defend themselves against unforeseen incidents and gain experience in price danger take the lead. However, this market benefit is largely dependent on the method to initially identify risks in the architecture of extensive multidisciplinary capital ventures. This paper explores how a sustainable market strategy works in reality. Using the market model, the business issues that need to be considered during the implementation or expansion of urban strategies are discussed. The PRM strategy shows a better-quality assurance ratio of 97.2%, probability ratio of 95.3%, safety rate of 97.5%, reduced risk management rate of 22.6%, an accident rate of 17.4%, cost management of 25.1% and fuel consumption ratio of 23.7% when compared to existing strategies.","PeriodicalId":45573,"journal":{"name":"International Journal of Reliability Quality and Safety Engineering","volume":null,"pages":null},"PeriodicalIF":0.9000,"publicationDate":"2022-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Reliability Quality and Safety Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1142/s0218539322400058","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

Today’s commonly used risk management procedures allow the planning team to focus on sensitive areas. It focuses the project team’s attention on activities and resources when a great risk threat exists or when the most time- and effective-engineering solutions can achieve expense reductions. Industrial security issues have worsened dramatically over the last decade. Over time, the risks in the sector rose as limited, single-train or batch operations shifted to massive multi-train operations. Often an accident leads to detrimental effects: shutting down the operation, loss of life, environmental disruption, and loss of business. The reparation of losses from the budget is unwelcome since the government’s reserve will not cope with these needs. This paper has a definitive comparative edge for company sponsors for project risk management (PRM) strategy. The sponsors who knowingly take chances, forecast unfavorable developments, defend themselves against unforeseen incidents and gain experience in price danger take the lead. However, this market benefit is largely dependent on the method to initially identify risks in the architecture of extensive multidisciplinary capital ventures. This paper explores how a sustainable market strategy works in reality. Using the market model, the business issues that need to be considered during the implementation or expansion of urban strategies are discussed. The PRM strategy shows a better-quality assurance ratio of 97.2%, probability ratio of 95.3%, safety rate of 97.5%, reduced risk management rate of 22.6%, an accident rate of 17.4%, cost management of 25.1% and fuel consumption ratio of 23.7% when compared to existing strategies.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
复杂商业环境中风险分析的智能专家系统及其解决方案研究进展
今天常用的风险管理程序允许计划团队关注敏感区域。它将项目团队的注意力集中在存在巨大风险威胁的活动和资源上,或者当最省时和最有效的工程解决方案可以实现费用削减时。工业安全问题在过去十年中急剧恶化。随着时间的推移,随着有限的单列或批量操作转向大规模的多列操作,该行业的风险也在上升。事故通常会导致不利影响:停产、人员伤亡、环境破坏和业务损失。从预算中弥补损失是不受欢迎的,因为政府的储备不足以应付这些需求。本文对项目风险管理(PRM)策略的公司发起人具有明确的比较优势。那些有意识地抓住机会、预测不利的发展、防范不可预见的事件并在价格危险中积累经验的赞助商占据了领先地位。然而,这种市场效益在很大程度上取决于在广泛的多学科资本投资架构中最初识别风险的方法。本文探讨了可持续市场战略如何在现实中发挥作用。利用市场模型,讨论了城市战略实施或扩展过程中需要考虑的商业问题。与现有策略相比,PRM策略的质量保证率为97.2%,概率率为95.3%,安全率为97.5%,风险管理率为22.6%,事故率为17.4%,成本管理率为25.1%,燃油消耗率为23.7%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.70
自引率
25.00%
发文量
26
期刊介绍: IJRQSE is a refereed journal focusing on both the theoretical and practical aspects of reliability, quality, and safety in engineering. The journal is intended to cover a broad spectrum of issues in manufacturing, computing, software, aerospace, control, nuclear systems, power systems, communication systems, and electronics. Papers are sought in the theoretical domain as well as in such practical fields as industry and laboratory research. The journal is published quarterly, March, June, September and December. It is intended to bridge the gap between the theoretical experts and practitioners in the academic, scientific, government, and business communities.
期刊最新文献
Introducing the detailed semantic interface description to support a modular safety approval of automated vehicles – S 2 I 2 A SaaS Concept Based Shopping Center Fire Risk Assessment Model for the Safety Management Applications OSS Sustainability Assessment Based on the Deep Learning Considering Effort Wiener Process Data A Study on the Prediction of COVID-19 Confirmed Cases Using Deep Learning and AdaBoost-Bi-LSTM model Assessment of emergency risk management and resilience engineering at management levels of a high hazard industry
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1