IMPLEMENTING 5S PRINCIPLES ON A MANUFACTURING COMPANY, SPS ENGINEERING: CASE STUDY

T. .
{"title":"IMPLEMENTING 5S PRINCIPLES ON A MANUFACTURING COMPANY, SPS ENGINEERING: CASE STUDY","authors":"T. .","doi":"10.15623/ijret.2018.0712008","DOIUrl":null,"url":null,"abstract":"SPS Engineering is a manufacturing company established in 1998, which produces engine and transmission mounts, suspension mounts, etc. This study is mainly focused on 5S implementation to help SPS Engineering reach its expectation. The problems of SPS Engineering were messy tool setting, bad working environment, and inefficient process flow. After implementing 5S principles in SPS Engineering, the average time consuming looking for and retrieving drill bits and end mill bits were reduced by 59.5% and 49.4%, respectively. The time reduction is the direct result of 5S implementation and allows SPS Engineering to manufacture products more efficiently and productively. SPS Engineering is one step ahead in terms of lean manufacturing company.","PeriodicalId":14258,"journal":{"name":"International Journal of Research in Engineering and Technology","volume":"7 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-12-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Research in Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15623/ijret.2018.0712008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

SPS Engineering is a manufacturing company established in 1998, which produces engine and transmission mounts, suspension mounts, etc. This study is mainly focused on 5S implementation to help SPS Engineering reach its expectation. The problems of SPS Engineering were messy tool setting, bad working environment, and inefficient process flow. After implementing 5S principles in SPS Engineering, the average time consuming looking for and retrieving drill bits and end mill bits were reduced by 59.5% and 49.4%, respectively. The time reduction is the direct result of 5S implementation and allows SPS Engineering to manufacture products more efficiently and productively. SPS Engineering is one step ahead in terms of lean manufacturing company.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在制造企业实施5s原则,SPS工程:案例分析
SPS工程是一家成立于1998年的制造公司,主要生产发动机和变速箱支架,悬架支架等。本研究主要集中在5S的实施,以帮助SPS工程达到其预期。SPS工程存在刀具设置混乱、工作环境恶劣、工艺流程效率低下等问题。在SPS工程中实施5S原则后,钻头和立铣刀的平均寻找和回收时间分别减少了59.5%和49.4%。时间的缩短是5S实施的直接结果,并允许SPS工程更有效地生产产品。SPS工程在精益制造公司方面领先一步。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
AES based security scheme to remove man-in-the middle attack in online banking Evaluating the combustion performance of plastic oil in an Otto engine: A comparative analysis with premium fuel Ethical issues in computer as an instrument of technology growth Adaptation and evaluation of charcoal kiln metal for carbonizing Khat waste, sticks and leave An analysis on structure of normal and high volume fly ash concrete
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1