User-Centered Design-Based Approach in Scheduling Management Application Design and Development

D. Herumurti, I. M. S. Bimantara, I. W. Supriana
{"title":"User-Centered Design-Based Approach in Scheduling Management Application Design and Development","authors":"D. Herumurti, I. M. S. Bimantara, I. W. Supriana","doi":"10.12962/j20882033.v34i1.15088","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":14549,"journal":{"name":"IPTEK: The Journal for Technology and Science","volume":"2 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IPTEK: The Journal for Technology and Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12962/j20882033.v34i1.15088","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于用户中心设计的调度管理应用程序设计与开发方法
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
相关文献
Reinforcement of bionic trabecular bone scaffolds for bone defect repair using the slime mould algorithm
IF 8.4 2区 材料科学Materials & DesignPub Date : 2023-09-01 DOI: 10.1016/j.matdes.2023.112184
Deyin Kong , Zhongxiong Kang , Chaorui Jiang , Zhihui Zhang , Xiebin Wang , Qing Han , Yanbin Shi
The design and evaluation of bionic porous bone scaffolds in fluid flow characteristics and mechanical properties
IF 6.1 2区 医学Computer methods and programs in biomedicinePub Date : 2022-10-01 DOI: 10.1016/j.cmpb.2022.107059
Xinpei Li , Yanen Wang , Bo Zhang , Haozhe Yang , Ray Tahir Mushtaq , Minyan Liu , Chengwei Bao , Yikai Shi , Zhuojing Luo , Weihong Zhang
来源期刊
自引率
0.00%
发文量
17
审稿时长
9 weeks
期刊最新文献
Deposition Silver Based Thin Film on Stainless Steel 316l as Antimicrobial Agent Using Electrophoretic Deposition Method Probabilistic Scheduling Based On Hybrid Bayesian Network–Program Evaluation Review Technique, Analysis of Level Team Effectiveness in The Implementation of Scrum Using Evidence-Based Management (Case Study: Company A as A Fintech Industry) Project Delay Risk Assessment User-Centered Design-Based Approach in Scheduling Management Application Design and Development
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1