Critical Offshore Field Development Projects –Why Work Outside of Strict Timelines?

J. Arukhe, S. Al-Ghamdi, Musa Mohammed Al-Nafisah
{"title":"Critical Offshore Field Development Projects –Why Work Outside of Strict Timelines?","authors":"J. Arukhe, S. Al-Ghamdi, Musa Mohammed Al-Nafisah","doi":"10.4043/30904-ms","DOIUrl":null,"url":null,"abstract":"\n Overcoming environmental challenges to develop offshore oil fields remains daunting for engineers who must balance economic feasibility with environmental protection, often within limited timelines before first oil commitments. A critical examination of Saudi Arabia's field development cases reveals a 56-year timeline (which seems interminable) between offshore field discovery in 1957 and realization of an environmentally friendly field development in 2013. If teams desire to accomplish Aegian projects with the sustenance of core values in perspective (whatever the core values might be), such as to gain the economic advantages of offshore projects while preserving the environment or honoring some other constraint, it is imperative to work with more robust timelines. Whereas strictly time-bounding projects may help with releasing adrenalin for performance, engineers may require adequate time for innovative concept designs to conduct necessary pilots and qualification.\n Collaboration between cross-functional project teams – construction, drilling, testing, and production – is examined from the economic delivery of several challenging wells under various environmental challenges and constraints. An overarching theme from each team was to apply environmental solutions. Colonization of hard coral species and presence of several fish species were observed on project completion. For example, a 70% increase in growth of Seagrass and artificial coral reefs was observed near the causeway built for the Manifa Field, which could become a hot spot of biodiversity. Water circulation, as measured by an acoustic doppler current profiler (ADCP) improved from 17 days before the project to 11 days on project completion. When engineers persevere, collaborate and have enough time to plan intensively until they find the technology solutions to advance, society benefits from an environmental return.\n As the worldwide study cases reveal, several projects are threatened globally because engineers may be unable to find viable solutions under rigid timelines. Often companies must be willing to wait until they acquire the technologies to responsibly advance complex environmentally sensitive projects. If timelines are flexible and sufficiently realistic, management's unwavering support to avail necessary resources would be critical for success.","PeriodicalId":10925,"journal":{"name":"Day 3 Wed, May 06, 2020","volume":"69 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-05-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, May 06, 2020","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/30904-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Overcoming environmental challenges to develop offshore oil fields remains daunting for engineers who must balance economic feasibility with environmental protection, often within limited timelines before first oil commitments. A critical examination of Saudi Arabia's field development cases reveals a 56-year timeline (which seems interminable) between offshore field discovery in 1957 and realization of an environmentally friendly field development in 2013. If teams desire to accomplish Aegian projects with the sustenance of core values in perspective (whatever the core values might be), such as to gain the economic advantages of offshore projects while preserving the environment or honoring some other constraint, it is imperative to work with more robust timelines. Whereas strictly time-bounding projects may help with releasing adrenalin for performance, engineers may require adequate time for innovative concept designs to conduct necessary pilots and qualification. Collaboration between cross-functional project teams – construction, drilling, testing, and production – is examined from the economic delivery of several challenging wells under various environmental challenges and constraints. An overarching theme from each team was to apply environmental solutions. Colonization of hard coral species and presence of several fish species were observed on project completion. For example, a 70% increase in growth of Seagrass and artificial coral reefs was observed near the causeway built for the Manifa Field, which could become a hot spot of biodiversity. Water circulation, as measured by an acoustic doppler current profiler (ADCP) improved from 17 days before the project to 11 days on project completion. When engineers persevere, collaborate and have enough time to plan intensively until they find the technology solutions to advance, society benefits from an environmental return. As the worldwide study cases reveal, several projects are threatened globally because engineers may be unable to find viable solutions under rigid timelines. Often companies must be willing to wait until they acquire the technologies to responsibly advance complex environmentally sensitive projects. If timelines are flexible and sufficiently realistic, management's unwavering support to avail necessary resources would be critical for success.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
关键海上油田开发项目-为什么要在严格的时间表之外工作?
对于工程师来说,克服开发海上油田的环境挑战仍然是一项艰巨的任务,他们必须在经济可行性和环境保护之间取得平衡,通常是在第一批石油承诺之前的有限时间内。一项对沙特阿拉伯油田开发案例的批判性研究显示,从1957年发现海上油田到2013年实现环保油田开发,时间间隔长达56年(似乎很长)。如果团队希望在核心价值观的支持下完成希腊项目(无论核心价值观是什么),例如在保护环境或遵守其他约束的同时获得海上项目的经济优势,则必须制定更严格的时间表。虽然严格的时间限制项目可能有助于释放肾上腺素,但工程师可能需要足够的时间来进行创新概念设计,进行必要的试点和资格认证。跨职能项目团队(施工、钻井、测试和生产)之间的协作,通过在各种环境挑战和限制下的几口具有挑战性的井的经济交付来进行检查。每个团队的首要主题是应用环境解决方案。在项目完成时,观察到硬珊瑚物种的定植和几种鱼类的存在。例如,在为曼尼法油田建造的堤道附近,观察到海草和人工珊瑚礁的生长增加了70%,这可能成为生物多样性的热点。声学多普勒电流剖面仪(ADCP)测量的水循环从项目前的17天改善到项目完成后的11天。当工程师们坚持不懈,相互合作,并有足够的时间进行密集规划,直到他们找到了先进的技术解决方案,社会就会从环境回报中受益。正如全球范围内的研究案例所揭示的那样,由于工程师可能无法在严格的时间表下找到可行的解决方案,全球范围内的一些项目受到了威胁。通常,公司必须愿意等待,直到他们获得了负责任地推进复杂的环境敏感项目的技术。如果时间表是灵活和足够现实的,管理部门对利用必要资源的坚定支持将是成功的关键。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Alternative “green” lime kiln fuels: Part II—Woody biomass, bio-oils, gasification, and hydrogen Effects of a PFI refiner’s operational parameters on the swellability of recycled fiber Fundamental understanding of removal of liquid thin film trapped between fibers in the paper drying process: A microscopic approach Alternative “green” lime kiln fuels: Part I—Pulping/recovery byproducts Demanda de electricidad residencial: Una perspectiva de regresión cuantílica
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1