J. Sandberg, David Bishop, Louisa S. Man, D. A. Smith
{"title":"Design Challenges resulting from the construction of the River Dee Bridge, Aberdeen, UK","authors":"J. Sandberg, David Bishop, Louisa S. Man, D. A. Smith","doi":"10.1680/jbren.21.00022","DOIUrl":null,"url":null,"abstract":"This paper sets out the challenges from the perspective of the designer associated with the construction of the River Dee bridge built by the balanced cantilever method. The importance of managing ...","PeriodicalId":44437,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","volume":"99 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2021-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jbren.21.00022","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0
Abstract
This paper sets out the challenges from the perspective of the designer associated with the construction of the River Dee bridge built by the balanced cantilever method. The importance of managing ...