{"title":"Perencanaan Sinyal Lalu Lintas Persimpangan Tiga Lengan Pada JL. Imam Bonjol – JL. Abdul Rahman Saleh Kota Pontianak","authors":"H. Azwansyah","doi":"10.26418/ELKHA.V9I2.22731","DOIUrl":null,"url":null,"abstract":"Abstract– This study aim to plan traffic light at intersection three arm of Imam Bonjol Street – Abdul Rahman Saleh Street in Pontianak City. This Study require data of intersection geometric and vehicle traffic obtained of field survey. This study yield planning of traffic light 3 phase with cycle time 160 second. Green time of actual for phase 1 (Street of Jl. Imam Bonjol (a)) equal to 66 second, for phase 2 (Street of Jl. Imam Bonjol (b)) equal to 63 second, and for phase 3 (Street of Abdul Rahman Saleh) equal to 10 second. Keywords- Traffic Light, Cycle Time, Green Time","PeriodicalId":32754,"journal":{"name":"Elkha Jurnal Teknik Elektro","volume":"45 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Elkha Jurnal Teknik Elektro","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26418/ELKHA.V9I2.22731","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Abstract– This study aim to plan traffic light at intersection three arm of Imam Bonjol Street – Abdul Rahman Saleh Street in Pontianak City. This Study require data of intersection geometric and vehicle traffic obtained of field survey. This study yield planning of traffic light 3 phase with cycle time 160 second. Green time of actual for phase 1 (Street of Jl. Imam Bonjol (a)) equal to 66 second, for phase 2 (Street of Jl. Imam Bonjol (b)) equal to 63 second, and for phase 3 (Street of Abdul Rahman Saleh) equal to 10 second. Keywords- Traffic Light, Cycle Time, Green Time