F. Sloothaak, A. Akçay, G. van Houtum, M. van der Heijden
{"title":"After-Sales Services During an Asset’s Lifetime: Collaborative Planning of System Upgrades","authors":"F. Sloothaak, A. Akçay, G. van Houtum, M. van der Heijden","doi":"10.1287/serv.2023.0318","DOIUrl":null,"url":null,"abstract":"We consider a physical asset consisting of complex systems, where the systems may require upgrades during the lifetime of the asset. In practice, the asset owner and system supplier can make the upgrade decisions together, requiring a decision-support model that can be jointly used to optimize the total benefit for both parties. Motivated by a real-life use case including an asset owner and a system supplier, we build a continuous-time model to optimize the upgrade decisions of a system during the fixed lifetime of the asset. In our model, we capture the key critical factors that drive the upgrade decisions: increasing functionality requirements due to evolving technology, age-dependent maintenance costs, a predetermined overhaul plan of the asset, and the lifetime of the asset. A system upgrade is less costly if it is executed jointly with an asset overhaul. We first analyze the case with no additional cost of upgrading outside an overhaul. We analytically characterize the structure of the optimal upgrade policy under various realistic assumptions that lead to different types of cost functions. We then use these results as a building block to characterize the optimal policy for a generalized cost function. When there is a penalty for upgrading outside an overhaul moment, we propose a dynamic programming approach that efficiently determines the optimal upgrade policy by using our analytical results. We also prove that as this penalty increases, the optimal policy can only change to one where the number of upgrades not jointly executed with overhauls is reduced. However, the optimal number of upgrades is a nonincreasing function of this penalty. Also, surprisingly, more overhauls may lead to a smaller number of upgrades under the optimal policy. Funding: This publication is part of the project “Maritime Remote Control Tower for Service Logistics Innovation (MARCONI)” (project 439.18.309) of the research program “Integrator-Logistics as Enabler for Enhancing Society,” which is (partly) financed by the Dutch Research Council (NWO).","PeriodicalId":1,"journal":{"name":"Accounts of Chemical Research","volume":null,"pages":null},"PeriodicalIF":16.4000,"publicationDate":"2022-02-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Accounts of Chemical Research","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1287/serv.2023.0318","RegionNum":1,"RegionCategory":"化学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CHEMISTRY, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0
Abstract
We consider a physical asset consisting of complex systems, where the systems may require upgrades during the lifetime of the asset. In practice, the asset owner and system supplier can make the upgrade decisions together, requiring a decision-support model that can be jointly used to optimize the total benefit for both parties. Motivated by a real-life use case including an asset owner and a system supplier, we build a continuous-time model to optimize the upgrade decisions of a system during the fixed lifetime of the asset. In our model, we capture the key critical factors that drive the upgrade decisions: increasing functionality requirements due to evolving technology, age-dependent maintenance costs, a predetermined overhaul plan of the asset, and the lifetime of the asset. A system upgrade is less costly if it is executed jointly with an asset overhaul. We first analyze the case with no additional cost of upgrading outside an overhaul. We analytically characterize the structure of the optimal upgrade policy under various realistic assumptions that lead to different types of cost functions. We then use these results as a building block to characterize the optimal policy for a generalized cost function. When there is a penalty for upgrading outside an overhaul moment, we propose a dynamic programming approach that efficiently determines the optimal upgrade policy by using our analytical results. We also prove that as this penalty increases, the optimal policy can only change to one where the number of upgrades not jointly executed with overhauls is reduced. However, the optimal number of upgrades is a nonincreasing function of this penalty. Also, surprisingly, more overhauls may lead to a smaller number of upgrades under the optimal policy. Funding: This publication is part of the project “Maritime Remote Control Tower for Service Logistics Innovation (MARCONI)” (project 439.18.309) of the research program “Integrator-Logistics as Enabler for Enhancing Society,” which is (partly) financed by the Dutch Research Council (NWO).
期刊介绍:
Accounts of Chemical Research presents short, concise and critical articles offering easy-to-read overviews of basic research and applications in all areas of chemistry and biochemistry. These short reviews focus on research from the author’s own laboratory and are designed to teach the reader about a research project. In addition, Accounts of Chemical Research publishes commentaries that give an informed opinion on a current research problem. Special Issues online are devoted to a single topic of unusual activity and significance.
Accounts of Chemical Research replaces the traditional article abstract with an article "Conspectus." These entries synopsize the research affording the reader a closer look at the content and significance of an article. Through this provision of a more detailed description of the article contents, the Conspectus enhances the article's discoverability by search engines and the exposure for the research.