Improvement of Preventive Maintenance Process Effectiveness in Insourcing and Outsourcing Scheme with House of Risk (HOR) Method Approach (A Case Study)

Budi Siswanto, A. Sudiarno, P. Karningsih, H. Pariaman
{"title":"Improvement of Preventive Maintenance Process Effectiveness in Insourcing and Outsourcing Scheme with House of Risk (HOR) Method Approach (A Case Study)","authors":"Budi Siswanto, A. Sudiarno, P. Karningsih, H. Pariaman","doi":"10.12962/j20882033.v30i2.5010","DOIUrl":null,"url":null,"abstract":"Outsourcing has become the alternative scheme to gain improvement in several fields within a short time to many enterprises. One power generation in North Java implemented PM as planned maintenance strategy to maintain equipment by conducting insourcing and outsourcing scheme as PM execution. Both conditions must follow the same business process flow in PM execution process and there will occur some obstacles that interrupted PM process. The existing problem will be analyzed with House of Risk (HOR) method approach, supported by Integrated Manufacturing Open Systems Architecture (CIMOSA) process-based function modeling for identification method and Supply Chain Risk Identification System (SCRIS) risk structure identification used for mapping problem, root cause, and its relation. Analysis with HOR results in root causes that occurred within PM implementation process for both of them commonly has the same problem that is process business acknowledgment, but in outsourcing scheme not exist root cause on culture compliance and work task requirement, because they have a descriptive target to obtain service level agreement fulfillment. On both scheme still need an improving method to monitor and evaluate the PM work for better performance.","PeriodicalId":14549,"journal":{"name":"IPTEK: The Journal for Technology and Science","volume":"62 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-07-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IPTEK: The Journal for Technology and Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12962/j20882033.v30i2.5010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Outsourcing has become the alternative scheme to gain improvement in several fields within a short time to many enterprises. One power generation in North Java implemented PM as planned maintenance strategy to maintain equipment by conducting insourcing and outsourcing scheme as PM execution. Both conditions must follow the same business process flow in PM execution process and there will occur some obstacles that interrupted PM process. The existing problem will be analyzed with House of Risk (HOR) method approach, supported by Integrated Manufacturing Open Systems Architecture (CIMOSA) process-based function modeling for identification method and Supply Chain Risk Identification System (SCRIS) risk structure identification used for mapping problem, root cause, and its relation. Analysis with HOR results in root causes that occurred within PM implementation process for both of them commonly has the same problem that is process business acknowledgment, but in outsourcing scheme not exist root cause on culture compliance and work task requirement, because they have a descriptive target to obtain service level agreement fulfillment. On both scheme still need an improving method to monitor and evaluate the PM work for better performance.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
采用“风险屋”方法改善内包及外判计划的预防性维修程序效能(个案研究)
外包已成为许多企业在短时间内实现多个领域提升的替代方案。北爪哇的一家发电厂实施PM作为计划维护策略,通过内包和外包方案作为PM执行来维护设备。在项目管理执行过程中,这两种情况必须遵循相同的业务流程流,并且会出现一些中断项目管理过程的障碍。现有问题将采用风险屋(HOR)方法进行分析,基于集成制造开放系统架构(CIMOSA)过程的功能建模识别方法和供应链风险识别系统(SCRIS)风险结构识别用于映射问题、根本原因及其关系。使用HOR进行分析的结果是,在PM实施过程中发生的根本原因,两者通常都有相同的问题,即过程业务确认,但在外包方案中,不存在文化遵从性和工作任务需求的根本原因,因为它们有一个描述性的目标来获得服务水平协议的实现。在这两种方案上,还需要一种改进的方法来监控和评估项目管理工作,以获得更好的绩效。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
17
审稿时长
9 weeks
期刊最新文献
Deposition Silver Based Thin Film on Stainless Steel 316l as Antimicrobial Agent Using Electrophoretic Deposition Method Probabilistic Scheduling Based On Hybrid Bayesian Network–Program Evaluation Review Technique, Analysis of Level Team Effectiveness in The Implementation of Scrum Using Evidence-Based Management (Case Study: Company A as A Fintech Industry) Project Delay Risk Assessment User-Centered Design-Based Approach in Scheduling Management Application Design and Development
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1