Extreme Well Electrical Submersible Pump: Altering Perception in Artificial Lift Selection

R. Alfajri, Herbert Sipahutar, Heru Irianto, Harry Kananta, Catur Sunawan Balya, Muhammed Ghiffari, A. Maltsev, Andrei Lobanov
{"title":"Extreme Well Electrical Submersible Pump: Altering Perception in Artificial Lift Selection","authors":"R. Alfajri, Herbert Sipahutar, Heru Irianto, Harry Kananta, Catur Sunawan Balya, Muhammed Ghiffari, A. Maltsev, Andrei Lobanov","doi":"10.2118/205584-ms","DOIUrl":null,"url":null,"abstract":"\n Electrical Submersible Pump (ESP) is an artificial lift that often associated with big production rate, which is at least 300 bbls/day. ESP also has limitation in handling unconsolidated sand reservoir, high GOR wells, and minimum casing ID. As technology flourished, these handicaps for an ESP well are no longer valid. A breakthrough was established for ESP utilization. However people's perception of ESP persists. Extreme well ESP is changing that perception.\n There are three types of extreme well ESP: high solid content, high GOR, and slim-line ESP. High solid content ESP has open impellers. This type of impeller creates no space between impeller and diffuser, hence no solids accumulation. Multiphase pump (MPP) is used to handle high GOR problem. MPP stage design has axial screw type impeller and gas handling diffuser. Gas from reservoir fluid will be compressed and broken into smaller bubbles resulting in homogenous gas-liquid mixture, hence no gas lock during production. For well with small casing ID e.g., 4-1/2\" casing, slim-line ESP with 3.19\" outside diameter is utilized.\n These three types of extreme well ESP were all utilized in Central Sumatera Asset of Pertamina EP. High solid content ESPs were installed in five wells (MJ-134, MJ-132, MJ-128, STT-25, and KTT-23) in four different structures with production range of 30 to 1200 bbls/day. Basic Sediment (BS) number in this asset varies from 0.1% up to 40%, which results in suspending wells and repeating well services. In wells MJ-134, high solid content ESP was able to produce up to 50% BS number at the beginning of production. It showed excellent lifting capability in severe sand problem condition. While in wells STT-25 and KTT-23, utilizing high solid content ESP increases well's lifetime and generates gain in production. High GOR ESPs were installed in wells PPS-01 and SGC-15. Both wells has around 2000 scf/stb GOR. Conventional ESP would have a hard time producing these gassy wells. By using MPP, well PPS-01 produced smoothly and even later optimized to have bigger production. Producing well SGC-15 faced another handicap in form of scale deposition. Scale preventer was also installed for this well. Slim-line ESP was installed in well BJG-01 that has 4-1/2\" casing. Grossing up the wells with slim-line ESP contributes production gain.\n Since October 2019 this project has produced cumulative production of 56,199 bbls oil and counting, and been considered successful in solving extreme well problems. Being proven able to handle high BS number, high GOR, and produce well with small casing size, extreme well ESP is altering old mindset in ESP utilization. All of handicaps mentioned above were redeemed obsolete. This breakthrough starts the dawn of new perception in artificial lift selection.","PeriodicalId":11017,"journal":{"name":"Day 2 Wed, October 13, 2021","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-10-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, October 13, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/205584-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Electrical Submersible Pump (ESP) is an artificial lift that often associated with big production rate, which is at least 300 bbls/day. ESP also has limitation in handling unconsolidated sand reservoir, high GOR wells, and minimum casing ID. As technology flourished, these handicaps for an ESP well are no longer valid. A breakthrough was established for ESP utilization. However people's perception of ESP persists. Extreme well ESP is changing that perception. There are three types of extreme well ESP: high solid content, high GOR, and slim-line ESP. High solid content ESP has open impellers. This type of impeller creates no space between impeller and diffuser, hence no solids accumulation. Multiphase pump (MPP) is used to handle high GOR problem. MPP stage design has axial screw type impeller and gas handling diffuser. Gas from reservoir fluid will be compressed and broken into smaller bubbles resulting in homogenous gas-liquid mixture, hence no gas lock during production. For well with small casing ID e.g., 4-1/2" casing, slim-line ESP with 3.19" outside diameter is utilized. These three types of extreme well ESP were all utilized in Central Sumatera Asset of Pertamina EP. High solid content ESPs were installed in five wells (MJ-134, MJ-132, MJ-128, STT-25, and KTT-23) in four different structures with production range of 30 to 1200 bbls/day. Basic Sediment (BS) number in this asset varies from 0.1% up to 40%, which results in suspending wells and repeating well services. In wells MJ-134, high solid content ESP was able to produce up to 50% BS number at the beginning of production. It showed excellent lifting capability in severe sand problem condition. While in wells STT-25 and KTT-23, utilizing high solid content ESP increases well's lifetime and generates gain in production. High GOR ESPs were installed in wells PPS-01 and SGC-15. Both wells has around 2000 scf/stb GOR. Conventional ESP would have a hard time producing these gassy wells. By using MPP, well PPS-01 produced smoothly and even later optimized to have bigger production. Producing well SGC-15 faced another handicap in form of scale deposition. Scale preventer was also installed for this well. Slim-line ESP was installed in well BJG-01 that has 4-1/2" casing. Grossing up the wells with slim-line ESP contributes production gain. Since October 2019 this project has produced cumulative production of 56,199 bbls oil and counting, and been considered successful in solving extreme well problems. Being proven able to handle high BS number, high GOR, and produce well with small casing size, extreme well ESP is altering old mindset in ESP utilization. All of handicaps mentioned above were redeemed obsolete. This breakthrough starts the dawn of new perception in artificial lift selection.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
极端井电潜泵:改变人工举升选择的感知
电潜泵(ESP)是一种人工举升,通常与大产量相关,至少为300桶/天。ESP在处理松散砂岩油藏、高GOR井和小套管内径方面也有局限性。随着技术的蓬勃发展,这些ESP井的障碍已经不复存在。为ESP的应用开辟了新的突破口。然而,人们对ESP的感知仍然存在。极端井ESP正在改变这种看法。极端井ESP有三种类型:高固含量、高GOR和细管ESP。高固含量ESP采用开放式叶轮。这种类型的叶轮在叶轮和扩散器之间没有空间,因此没有固体堆积。采用多相泵(MPP)来解决高GOR问题。MPP级设计有轴向螺杆式叶轮和气体处理扩散器。储层流体中的气体会被压缩并破碎成更小的气泡,形成均匀的气液混合物,因此在生产过程中不会产生气锁。对于套管内径较小的井,如4-1/2”套管,则使用外径为3.19”的细管ESP。这三种类型的极端井ESP都在Pertamina EP的Central sumata资产中使用。高固含量esp安装在4口不同结构的5口井(MJ-134、MJ-132、MJ-128、STT-25和KTT-23)中,产量范围为30 ~ 1200桶/天。该资产的基本沉积物(BS)含量从0.1%到40%不等,导致井暂停和重复作业。在MJ-134井中,高固含量ESP在生产初期能够产生高达50%的BS值。在严重的砂石问题条件下表现出优异的举升能力。而在STT-25井和KTT-23井中,使用高固含量的ESP可以延长井的使用寿命,提高产量。在PPS-01和SGC-15井安装了高GOR esp。这两口井的产油量都在2000立方英尺/立方米左右。传统的ESP很难开采这些气井。通过使用MPP, PPS-01井的生产非常平稳,甚至后来进行了优化,产量更大。SGC-15生产井面临着另一个障碍,即结垢。该井还安装了防垢器。细绳ESP安装在BJG-01井,该井的套管为4-1/2”。使用细缆ESP对井进行注井作业有助于提高产量。自2019年10月以来,该项目已累计生产56199桶石油,并在不断增加,被认为成功解决了极端井问题。极端井ESP被证明能够处理高BS值、高GOR,并且能够以小套管尺寸生产油井,正在改变人们对ESP使用的旧观念。上面提到的所有障碍都被淘汰了。这一突破开启了人工举升选择新认知的曙光。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Technological Features of Associated Petroleum Gas Miscible Injection MGI in Order to Increase Oil Recovery at a Remote Group of Fields in Western Siberia Interdisciplinary Approach for Wellbore Stability During Slimhole Drilling at Volga-Urals Basin Oilfield A Set of Solutions to Reduce the Water Cut in Well Production Production Optimiser Pilot for the Large Artificially-Lifted and Mature Samotlor Oil Field Artificial Neural Network as a Method for Pore Pressure Prediction throughout the Field
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1