{"title":"Pelješac bridge, Croatia – Part 1: Concept and Design/Pelješac-Brücke, Kroatien – Teil 1: Konzept und Planung","authors":"Marjan Pipenbaher","doi":"10.37544/0005-6650-2023-05-39","DOIUrl":null,"url":null,"abstract":"The 2 404 m long Pelješac Bridge, Croatia, ranks among the most demanding bridges in the Europe in terms of both the technological complexity of construction and the complexity of the design. The bridge is located in an area of very high seismic activity, exposed to strong and gusty north and south winds. The compact bedrock is located at a depth of up to 100 m below the seabed so very demanding foundation on up to 128 m long driven steel piles was required. The bridge is designed as a multi-span cable-stayed bridge with a semi-integral hybrid structure with five 285 m long central spans. Part 2 deals with execution and assembly.","PeriodicalId":55399,"journal":{"name":"Bauingenieur","volume":null,"pages":null},"PeriodicalIF":0.4000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bauingenieur","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.37544/0005-6650-2023-05-39","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0
Abstract
The 2 404 m long Pelješac Bridge, Croatia, ranks among the most demanding bridges in the Europe in terms of both the technological complexity of construction and the complexity of the design. The bridge is located in an area of very high seismic activity, exposed to strong and gusty north and south winds. The compact bedrock is located at a depth of up to 100 m below the seabed so very demanding foundation on up to 128 m long driven steel piles was required. The bridge is designed as a multi-span cable-stayed bridge with a semi-integral hybrid structure with five 285 m long central spans. Part 2 deals with execution and assembly.
期刊介绍:
Die Zeitschrift Bauingenieur bietet Aufsätze über Theorie und Praxis des konstruktiven Ingenieurbaus, der Mechanik, der Geotechnik und des Baubetriebs und Baumanagements. Darüber hinaus enthält die Zeitschrift Bauingenieur Berichte und Reportagen über interessante Bauausführungen und Bausanierungen im In- und Ausland, Baustofffragen und Bauinformatik.