Contribution evaluation of the maintenance plans based on reliability centered maintenance for measuring instruments in Public Higher Education Institutions
R. Arenhart, Morgana Pizzolato, A. A. Mendes, L. F. Braghirolli
{"title":"Contribution evaluation of the maintenance plans based on reliability centered maintenance for measuring instruments in Public Higher Education Institutions","authors":"R. Arenhart, Morgana Pizzolato, A. A. Mendes, L. F. Braghirolli","doi":"10.14488/bjopm.2020.020","DOIUrl":null,"url":null,"abstract":"Goal: implement maintenance plans based on RCM in a laboratory and identify difficulties in the preparation of a maintenance plan for measuring instruments of a calibration and testing laboratory. Design / Methodology / Approach: Survey of the general maintenance scenario in PHEI laboratories, through individual interviews, and the implementation of maintenance plans elaborated from the implementation of Reliability Centered Maintenance (RCM). Results: Adaptations of the maintenance activities carried out by the analyzed laboratory. A demonstration of the laboratory's great adherence to the ANBT NBR ISO / IEC 17025 standard, besides the possibility of improving the quality of the service. Limitations of the investigation: The limitations are tied to the literature found on the subject and the application of maintenance plans restricted to only one university laboratory. Practical implications: Improve the literature on maintenance plans and facilitate the practical elaboration of these plans by laboratories. Originality / Value: Practical application of the preparation of maintenance plans for measuring instruments, not found in the literature of the subject.","PeriodicalId":54139,"journal":{"name":"Brazilian Journal of Operations & Production Management","volume":"59 1","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Brazilian Journal of Operations & Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14488/bjopm.2020.020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"OPERATIONS RESEARCH & MANAGEMENT SCIENCE","Score":null,"Total":0}
引用次数: 1
Abstract
Goal: implement maintenance plans based on RCM in a laboratory and identify difficulties in the preparation of a maintenance plan for measuring instruments of a calibration and testing laboratory. Design / Methodology / Approach: Survey of the general maintenance scenario in PHEI laboratories, through individual interviews, and the implementation of maintenance plans elaborated from the implementation of Reliability Centered Maintenance (RCM). Results: Adaptations of the maintenance activities carried out by the analyzed laboratory. A demonstration of the laboratory's great adherence to the ANBT NBR ISO / IEC 17025 standard, besides the possibility of improving the quality of the service. Limitations of the investigation: The limitations are tied to the literature found on the subject and the application of maintenance plans restricted to only one university laboratory. Practical implications: Improve the literature on maintenance plans and facilitate the practical elaboration of these plans by laboratories. Originality / Value: Practical application of the preparation of maintenance plans for measuring instruments, not found in the literature of the subject.