{"title":"Master Installation Design And Transformer Need Analysis in Faculty of Engineering Udayana University Denpasar","authors":"I. Janardana, W. Wijaya","doi":"10.24843/jeei.2020.v04.i01.p05","DOIUrl":null,"url":null,"abstract":"Faculty of Engineering, Udayana University, PB. Sudirman Denpasar has 5 building units (buildings A, B, C, D, AF). Currently the AF building is undergoing renovation and is planned to be on 4 floors. The entire building will be equipped with the installation of 2 elevator units. The construction of the two new buildings and the installation of the 2 elevator units caused new problems of electricity shortages, changes in safety settings, unbalanced loads, and changes in the size of the main cable and the needs of the transformer and its capacity. The AF building and building A are supplied from sources on the transformer which are joined with other faculties, while Buildings B, C, D and E are fed by one transformer No. 124303818 with a capacity of 160 kVA. The plan to build an Alumni Building does not yet have electricity. \nBased on the analysis of the design, the total amount of power needed in all buildings in the Sudirman Denpasar Faculty of Engineering is the result of the AF Building planning = 134,280 watts, the Alumni Building planning results (building area and building functions are considered equal = 134,280 watts), so the total needs power to the two buildings = 271 560 Watt with a load deviation of 65%, then 0.65 x 271 560 W = 176 514 Watt. Then the total power requirement of the entire building is 259,340 watts. The measurement result of Cos ? 0.92, then P (kVA) = 281,891,3043 Ampere = 281,8913 kVA. So that the transformer needs that must be prepared by the Faculty of Engineering to meet the power requirements at the Faculty of Engineering, Udayana University Denpasar with 80% transformer efficiency is a 350 kVA transformer with a placement position around the Faculty of Engineering area","PeriodicalId":52825,"journal":{"name":"Journal of Electrical Electronics and Informatics","volume":"13 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-05-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Electrical Electronics and Informatics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/jeei.2020.v04.i01.p05","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Faculty of Engineering, Udayana University, PB. Sudirman Denpasar has 5 building units (buildings A, B, C, D, AF). Currently the AF building is undergoing renovation and is planned to be on 4 floors. The entire building will be equipped with the installation of 2 elevator units. The construction of the two new buildings and the installation of the 2 elevator units caused new problems of electricity shortages, changes in safety settings, unbalanced loads, and changes in the size of the main cable and the needs of the transformer and its capacity. The AF building and building A are supplied from sources on the transformer which are joined with other faculties, while Buildings B, C, D and E are fed by one transformer No. 124303818 with a capacity of 160 kVA. The plan to build an Alumni Building does not yet have electricity. Based on the analysis of the design, the total amount of power needed in all buildings in the Sudirman Denpasar Faculty of Engineering is the result of the AF Building planning = 134,280 watts, the Alumni Building planning results (building area and building functions are considered equal = 134,280 watts), so the total needs power to the two buildings = 271 560 Watt with a load deviation of 65%, then 0.65 x 271 560 W = 176 514 Watt. Then the total power requirement of the entire building is 259,340 watts. The measurement result of Cos ? 0.92, then P (kVA) = 281,891,3043 Ampere = 281,8913 kVA. So that the transformer needs that must be prepared by the Faculty of Engineering to meet the power requirements at the Faculty of Engineering, Udayana University Denpasar with 80% transformer efficiency is a 350 kVA transformer with a placement position around the Faculty of Engineering area
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
登巴萨乌达亚那大学工程学院硕士安装设计与变压器需求分析
乌达亚那大学工程学院,PB。Sudirman Denpasar有5个建筑单元(A、B、C、D、AF)。目前,AF大楼正在进行翻新,计划为4层。整栋楼将安装2部电梯。两栋新大楼的建设和两台电梯机组的安装带来了电力短缺、安全设置变化、负载不平衡、主电缆尺寸变化以及变压器及其容量需求的新问题。AF楼和A楼由变压器上的电源与其他院系连接供电,B、C、D和E楼由一台容量为160kva的124303818号变压器供电。建造校友大楼的计划还没有通电。根据设计分析,苏迪曼登巴萨工程学院所有建筑的总用电量为AF楼规划结果= 134,280瓦,校友楼规划结果(建筑面积与建筑功能相等)= 134,280瓦,则两栋建筑的总用电量= 271 560瓦,负荷偏差为65%,则0.65 × 271 560瓦= 176 514瓦。那么整个建筑的总功率需求是259,340瓦。Cos ?的测量结果0.92,则P (kVA) = 281,891,3043安培= 281,8913 kVA。因此,必须由工程学院准备的变压器需求,以满足登巴萨乌达亚那大学工程学院的电力要求,变压器效率为80%,是一个350 kVA的变压器,放置位置在工程学院区域周围
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
期刊最新文献
Analysis and Detection of Power System Network Faults with Wavelet Transform Application of Bat Algorithm for Data Anonymization Self-Driving Car for a Smart and Safer Environment – A Review Implementation of OTA in 90nm Technology with Bandgap Reference Application A Comparative Study between Silicon Carbide and Silicon Nitride based Single Cell CMUT
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1