{"title":"Blowout Risk Analysis of Gas-Lift Completions","authors":"D. D. Grassick, P. S. Kallos, S. Dean, S. King","doi":"10.2118/20916-PA","DOIUrl":null,"url":null,"abstract":"A dynamic risk analysis was performed on four different gas-lift completions using a computer simulator. In this paper results are presented to allow comparison of the designs in terms of blowout risk and minor leakage during production and to provide insight into the effect of critical components and operations on the overall well safety.","PeriodicalId":22020,"journal":{"name":"Spe Production Engineering","volume":"46 1","pages":"172-180"},"PeriodicalIF":0.0000,"publicationDate":"1992-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/20916-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
A dynamic risk analysis was performed on four different gas-lift completions using a computer simulator. In this paper results are presented to allow comparison of the designs in terms of blowout risk and minor leakage during production and to provide insight into the effect of critical components and operations on the overall well safety.