{"title":"Usage of Two-Sided Motors as a Part of the Simultaneous Separate Operation Technology","authors":"A. Uvarov","doi":"10.2118/207322-ms","DOIUrl":null,"url":null,"abstract":"\n The technology of simultaneous, separate operation is a mandatory condition within the framework of Russian legislation for the production of oil and gas from multilayer reservoirs, which implies a share of a load of several pumps on different reservoirs. To reduce high additional equipment costs and metal consumption of the well, an assembly of two ESPs with one engine was developed. More than forty Russian wells were supplied with double ESP system motors. The project implementation enabled using separate simultaneous operations with more wells and developing reservoirs more accurately. It became possible to develop each reservoir by employing separated data from gauges connected to two reservoirs. The use of two side motors allows using such complicated technologies as separate simultaneous operations for even small and previously not economically achievable reservoirs. According to well inflow calculations, using the most suitable pump, the correct amount of liquid from each reservoir has been produced during these operations.","PeriodicalId":11069,"journal":{"name":"Day 2 Tue, November 16, 2021","volume":"54 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, November 16, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207322-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The technology of simultaneous, separate operation is a mandatory condition within the framework of Russian legislation for the production of oil and gas from multilayer reservoirs, which implies a share of a load of several pumps on different reservoirs. To reduce high additional equipment costs and metal consumption of the well, an assembly of two ESPs with one engine was developed. More than forty Russian wells were supplied with double ESP system motors. The project implementation enabled using separate simultaneous operations with more wells and developing reservoirs more accurately. It became possible to develop each reservoir by employing separated data from gauges connected to two reservoirs. The use of two side motors allows using such complicated technologies as separate simultaneous operations for even small and previously not economically achievable reservoirs. According to well inflow calculations, using the most suitable pump, the correct amount of liquid from each reservoir has been produced during these operations.