Pegaga Development Drilling Operations with PMCD and CDIV Applications

Annas Omar Mohammad, A. A. Bakar, Khairil Azam Mohd Khaidzir, Donald Robert McKen, L. Yeow, T. McCluskey
{"title":"Pegaga Development Drilling Operations with PMCD and CDIV Applications","authors":"Annas Omar Mohammad, A. A. Bakar, Khairil Azam Mohd Khaidzir, Donald Robert McKen, L. Yeow, T. McCluskey","doi":"10.4043/31436-ms","DOIUrl":null,"url":null,"abstract":"\n This paper describes the implementation of Pressurized Mud Cap Drilling (PMCD) and Casing Downhole Isolation Valve (CDIV) technology for the Pegaga Development Project to mitigate heavy fluid losses, allowing safe and effective drilling operations to reach well TD. The project consists of seven gas producers (deviated wells), drilled using a jack-up rig from a 10-slot wellhead deck.\n This paper also describes the planning and operational challenges met to ensure the smooth application of PMCD, starting with selection of the rig and supply vessels, challenges related to adverse weather conditions, long distances between the supply base and drilling location, sufficient mud tank capacity, continuous supply of Light Annular Mud (LAM) for PMCD operations and pandemic related personnel movement restrictions.\n A continuous learning process was applied for the drilling team where challenges experienced in drilling the first well in PMCD mode and lessons learned were captured and applied to the subsequent wells to improve drilling results. A comprehensive decision tree was established and refined to help the offshore team to make quick decisions when needed to switch to PMCD mode.\n The Pegaga gas field is located in Block SK320 in the Central Luconia Province, off the coast of Sarawak, offshore Malaysia. The main reservoir is a Pinnacle Carbonate reservoir, which is made up of vugular/karstified carbonates that are likely to cause severe or total losses.\n The top-hole sections for all seven wells were batched drilled before the PMCD system was rigged up prior to commencing the 12-1/4\" intermediate and 8-1/2\" reservoir hole sections. The 12-1/4\" sections were drilled to above the target gas reservoir carbonate formations, with the PMCD system on standby in case the carbonate formations and severe losses were encountered shallower than prognosed. A single 9-5/8\" CDIV (NACE standard) was run with the 9-5/8\" × 10-3/4\" casing string and permanently set (cemented) in the 12-1/4\" open hole, which was the first time this had been done in Malaysia. The CDIVs were set in the open hole to reduce the potential volume of gas below the CDIV and reduce the mud volume required for tripping in PMCD conditions, while increasing the safety and efficiency of PMCD operations.\n Seven wells were drilled to TD, five in PMCD mode, two conventionally. The lower and upper completions were run and set on six wells, with four of the lower completions run and set in PMCD mode. The CDIV was used to isolate the open hole for tripping out the BHA and running in the lower completion on two of the PMCD wells, while the other three used the top kill method.","PeriodicalId":11217,"journal":{"name":"Day 4 Fri, March 25, 2022","volume":"11 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Fri, March 25, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31436-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper describes the implementation of Pressurized Mud Cap Drilling (PMCD) and Casing Downhole Isolation Valve (CDIV) technology for the Pegaga Development Project to mitigate heavy fluid losses, allowing safe and effective drilling operations to reach well TD. The project consists of seven gas producers (deviated wells), drilled using a jack-up rig from a 10-slot wellhead deck. This paper also describes the planning and operational challenges met to ensure the smooth application of PMCD, starting with selection of the rig and supply vessels, challenges related to adverse weather conditions, long distances between the supply base and drilling location, sufficient mud tank capacity, continuous supply of Light Annular Mud (LAM) for PMCD operations and pandemic related personnel movement restrictions. A continuous learning process was applied for the drilling team where challenges experienced in drilling the first well in PMCD mode and lessons learned were captured and applied to the subsequent wells to improve drilling results. A comprehensive decision tree was established and refined to help the offshore team to make quick decisions when needed to switch to PMCD mode. The Pegaga gas field is located in Block SK320 in the Central Luconia Province, off the coast of Sarawak, offshore Malaysia. The main reservoir is a Pinnacle Carbonate reservoir, which is made up of vugular/karstified carbonates that are likely to cause severe or total losses. The top-hole sections for all seven wells were batched drilled before the PMCD system was rigged up prior to commencing the 12-1/4" intermediate and 8-1/2" reservoir hole sections. The 12-1/4" sections were drilled to above the target gas reservoir carbonate formations, with the PMCD system on standby in case the carbonate formations and severe losses were encountered shallower than prognosed. A single 9-5/8" CDIV (NACE standard) was run with the 9-5/8" × 10-3/4" casing string and permanently set (cemented) in the 12-1/4" open hole, which was the first time this had been done in Malaysia. The CDIVs were set in the open hole to reduce the potential volume of gas below the CDIV and reduce the mud volume required for tripping in PMCD conditions, while increasing the safety and efficiency of PMCD operations. Seven wells were drilled to TD, five in PMCD mode, two conventionally. The lower and upper completions were run and set on six wells, with four of the lower completions run and set in PMCD mode. The CDIV was used to isolate the open hole for tripping out the BHA and running in the lower completion on two of the PMCD wells, while the other three used the top kill method.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Pegaga开发钻井作业与PMCD和CDIV应用
本文介绍了在Pegaga开发项目中采用的加压泥浆帽钻井(PMCD)和套管井下隔离阀(CDIV)技术,以减轻严重的流体漏失,使钻井作业安全有效地达到井深。该项目包括7口天然气生产井(斜井),使用自升式钻井平台从10槽井口平台钻井。本文还介绍了确保PMCD顺利应用所面临的规划和操作挑战,首先是钻机和供应船的选择,与恶劣天气条件有关的挑战,供应基地和钻井地点之间的距离,足够的泥浆罐容量,为PMCD作业持续供应轻型环空泥浆(LAM),以及与流行病相关的人员流动限制。钻井团队采用了持续的学习过程,在PMCD模式下钻第一口井时遇到的挑战和吸取的经验教训被应用到后续的井中,以提高钻井效果。建立并完善了一个综合决策树,以帮助海上团队在需要切换到PMCD模式时快速做出决策。Pegaga气田位于马来西亚Sarawak海岸附近的Central Luconia省SK320区块。主要储层是Pinnacle碳酸盐岩储层,由空洞/岩溶碳酸盐岩组成,可能造成严重或全部损失。在开始12-1/4”和8-1/2”油藏井段之前,在装配PMCD系统之前,所有7口井的顶孔段都进行了批量钻井。12-1/4”段的井眼位于目标储层碳酸盐岩地层上方,PMCD系统处于待命状态,以防碳酸盐岩地层和严重漏失的深度低于预期。使用9-5/8”× 10-3/4”套管柱下入一个9-5/8”CDIV (NACE标准),并在12-1/4”裸眼中永久坐封(固井),这在马来西亚是首次。CDIV安装在裸眼井中,以减少CDIV下方的潜在气体体积,减少PMCD条件下起下钻所需的泥浆体积,同时提高PMCD作业的安全性和效率。共钻了7口井至TD, 5口为PMCD模式,2口为常规模式。下完井和上完井分别下入和坐封了6口井,其中4口下完井采用PMCD模式下入和坐封。CDIV用于隔离裸眼,以起下钻出BHA,并在其中两口PMCD井的下完井中下入,而其他三口井则使用顶压方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Cost Effective Framework of Integrated Development of Offshore Marginal Oilfields - Case Study of a Heavy Oil Reservoir with Thin Layers An Experimental Investigation into the Potential of a Green Alkali-Surfactant-Polymer Formulation for Enhanced Oil Recovery in Sandstone Reservoir World's First Arsenic in Condensate Removal for Oil & Gas Industry and its Universal Applications for Adsorption Facilities Digital Well Construction with Mud Motor Applications Coreflooding Experiments on PAM/PEI Polymer Gel for Water Control in High-Temperature and High-Pressure Conditions: With and Without Crossflow Effect
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1