OPTIMIZING THE SELECTION OF CONSTRUCTION MACHINERY FOR TRAFFIC WORKS UTILIZING MATHEMATICAL PROGRAMMING APPROACH

Minh Tan Tang
{"title":"OPTIMIZING THE SELECTION OF CONSTRUCTION MACHINERY FOR TRAFFIC WORKS UTILIZING MATHEMATICAL PROGRAMMING APPROACH","authors":"Minh Tan Tang","doi":"10.35382/18594816.1.26.2017.108","DOIUrl":null,"url":null,"abstract":"The article used the methods planning mathematics to give alternatives machines, construction equipment. This problem, based on the specific constraints such as mass excavation, leveling, compaction, transport ... to meet the full workload as planned. Additionally, this task must also satisfy the given objective function is minimal cost machine shift and ensure the execution time is shortest. This approach aims to bring about economic benefits for the construction company and is used for reference when selecting machines, construction equipment  works with the same workload. On the other hand, problem also propose solutions equippedmachinery and equipment for the construction company.","PeriodicalId":21692,"journal":{"name":"Scientific Journal of Tra Vinh University","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Journal of Tra Vinh University","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35382/18594816.1.26.2017.108","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The article used the methods planning mathematics to give alternatives machines, construction equipment. This problem, based on the specific constraints such as mass excavation, leveling, compaction, transport ... to meet the full workload as planned. Additionally, this task must also satisfy the given objective function is minimal cost machine shift and ensure the execution time is shortest. This approach aims to bring about economic benefits for the construction company and is used for reference when selecting machines, construction equipment  works with the same workload. On the other hand, problem also propose solutions equippedmachinery and equipment for the construction company.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
运用数学规划方法优化交通工程施工机械的选择
本文运用规划数学的方法给出了机器、施工设备的替代方案。这个问题,基于具体的约束条件,如大规模开挖、找平、压实、运输……按照计划完成全部工作量。此外,该任务还必须满足给定的目标函数是代价最小的机器移位,并确保执行时间最短。该方法的目的是为施工企业带来经济效益,可供同类工作量的机械、施工设备工程选择时参考。另一方面,也为施工企业提出了解决问题的机械设备装备方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
STUDY ON THE QUALITY PARAMETERS OF POND APPLE JAM (Annona glabra L.) FACTORS AFFECTING THE QUALITY OF WOOD APPLE LIQUOR (Limonia acidissima L.) STUDENT’S EVALUATION ON FACTORS INFLUENCING DECISIONS OF MAJORING IN HOTEL MANAGEMENT AT KIEN GIANG COLLEGE EFFECTS OF EXTRACTS FROM LEAVES AND ROOTS OF Melaleuca cajuputi Powell ON NEMATODES CAUSING DISEASES ON Piper nigrum L. (BLACK PEPPER) IN VITRO BANH PHCHUMBÂN, SEN ĐÔNTA FESTIVAL OF VIETNAM SOUTHERN KHMER: TRADITIONS AND MODERN CHANGES
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1