Nizhne-Suyanskiy Waterworks Facility — a long-term pending project

B. Zaytsev, Igor Egorov
{"title":"Nizhne-Suyanskiy Waterworks Facility — a long-term pending project","authors":"B. Zaytsev, Igor Egorov","doi":"10.22227/2305-5502.2019.2.2","DOIUrl":null,"url":null,"abstract":"Introduction. In 1971, “Schedule of multi-purpose use and protection of water resources of the basin of the Belaya River” envisaged construction of a cascade of 10 waterworks facilities, subdivided in 4 sections. Nizhne-Suyanskiy Waterworks Facility was planned for construction in the third section, the most lucrative in terms of energetic utilization. However, of the three HPPs planned in this section: Varyazhskaya, Nizhne-Suyanskaya and Pavlovskaya HPP, for the time being, only Pavlovskaya HPP has been built.\n\nNizhne-Suyanskiy Waterworks Facility had the mission to solve water household, energy and socio-economic problems.\n\nMaterials and methods. Initial material for the study were the results of the “Substantiation of the investment in the construction of Nizhne-Suyanskiy Waterworks Facility in the Ufa River in the Republic of Bashkortostan” prepared by ОJSC Energy Engineering Centre of Volga Region. Based on the retrieved data, the following analyses were made: a theoretical analysis, an estimate substantiation; subsequently, conclusions were put down based on the obtained results.\n\nResults. The optimum solution is a comprehensive waterworks facility, since Nizhne-Suyanskaya HPP will allow for improvement of the electrical power supply of the consumers of the NE part of the Bashkir power supply network. The construction of Nizhne-Suyanskiy Waterworks Facility will enable the control of the water influx to the water storage basin of Pavlovskaya HPP allowing for its increased generation power.\n\nThe construction of the waterworks facility is supposed to carry out in 2 stages. The first stage will be the erection of a concrete overflow weir as a single unit with the HPP building. The second stage will be the construction of a soil dam of local construction materials, that is: dam body of sand and gravel soil, PFU core of loamy soil. Simultaneously with the soil dam, on the right bank a solid blind concrete weir will be erected.\n\nConclusions. Nizhne-Suyanskiy Waterworks Facility unfortunately was not built. Feasibility studies have demonstrated a rate of return of the waterworks facility of 12.8 %, the value being a little higher than the standard one. This justifies investment in Nizhne-Suyanskiy Waterworks Facility. The basic feasibility factors of the construction of the waterworks facility are: Federal support, project engagement of the executive authority of the Republic of Bashkortostan and PJSC RusHydro, as well as availability of free investment funds.","PeriodicalId":22024,"journal":{"name":"Stroitel stvo nauka i obrazovanie [Construction Science and Education]","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Stroitel stvo nauka i obrazovanie [Construction Science and Education]","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22227/2305-5502.2019.2.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Introduction. In 1971, “Schedule of multi-purpose use and protection of water resources of the basin of the Belaya River” envisaged construction of a cascade of 10 waterworks facilities, subdivided in 4 sections. Nizhne-Suyanskiy Waterworks Facility was planned for construction in the third section, the most lucrative in terms of energetic utilization. However, of the three HPPs planned in this section: Varyazhskaya, Nizhne-Suyanskaya and Pavlovskaya HPP, for the time being, only Pavlovskaya HPP has been built. Nizhne-Suyanskiy Waterworks Facility had the mission to solve water household, energy and socio-economic problems. Materials and methods. Initial material for the study were the results of the “Substantiation of the investment in the construction of Nizhne-Suyanskiy Waterworks Facility in the Ufa River in the Republic of Bashkortostan” prepared by ОJSC Energy Engineering Centre of Volga Region. Based on the retrieved data, the following analyses were made: a theoretical analysis, an estimate substantiation; subsequently, conclusions were put down based on the obtained results. Results. The optimum solution is a comprehensive waterworks facility, since Nizhne-Suyanskaya HPP will allow for improvement of the electrical power supply of the consumers of the NE part of the Bashkir power supply network. The construction of Nizhne-Suyanskiy Waterworks Facility will enable the control of the water influx to the water storage basin of Pavlovskaya HPP allowing for its increased generation power. The construction of the waterworks facility is supposed to carry out in 2 stages. The first stage will be the erection of a concrete overflow weir as a single unit with the HPP building. The second stage will be the construction of a soil dam of local construction materials, that is: dam body of sand and gravel soil, PFU core of loamy soil. Simultaneously with the soil dam, on the right bank a solid blind concrete weir will be erected. Conclusions. Nizhne-Suyanskiy Waterworks Facility unfortunately was not built. Feasibility studies have demonstrated a rate of return of the waterworks facility of 12.8 %, the value being a little higher than the standard one. This justifies investment in Nizhne-Suyanskiy Waterworks Facility. The basic feasibility factors of the construction of the waterworks facility are: Federal support, project engagement of the executive authority of the Republic of Bashkortostan and PJSC RusHydro, as well as availability of free investment funds.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
尼兹涅-苏扬斯基自来水厂-一个长期悬而未决的项目
介绍。1971年,“贝拉亚河流域水资源综合利用和保护计划”设想建设一个由10个水利设施组成的梯级供水设施,分为4个部分。尼兹涅-苏扬斯基水厂计划在第三段建设,在能源利用方面最有利可图。然而,在这一地区计划建设的三座热电厂:瓦日斯卡亚、尼兹涅-苏扬斯卡亚和帕夫洛夫斯卡亚热电厂中,目前只有帕夫洛夫斯卡亚热电厂建成。尼兹涅-苏扬斯基自来水厂的使命是解决家庭用水、能源和社会经济问题。材料和方法。研究的最初材料是由ОJSC伏尔加州能源工程中心编制的“巴什科尔托斯坦共和国乌法河尼兹涅-苏扬斯基自来水厂设施建设投资的证实”的结果。根据检索到的数据,进行了以下分析:理论分析,估计证实;然后,根据得到的结果作出结论。最佳解决方案是综合自来水设施,因为尼兹内-苏扬斯卡亚HPP将改善巴什基尔供电网络东北部分用户的电力供应。尼兹涅-苏扬斯基水厂设施的建设将能够控制流入帕夫洛夫斯卡亚水电站蓄水盆地的水,从而增加其发电量。水厂设施建设计划分两个阶段进行。第一阶段将是安装一个混凝土溢流堰,作为HPP建筑的一个单独单元。第二阶段将采用土质土坝就地施工材料,即:坝体为砂砾土,PFU芯为壤土。在土坝的同时,将在右岸修筑混凝土盲堰。不幸的是,尼兹涅-苏扬斯基自来水厂没有建成。可行性研究表明,水厂设施的收益率为12.8%,略高于标准值。这证明了在尼兹涅-苏扬斯基自来水厂投资是合理的。供水设施建设的基本可行性因素是:联邦政府的支持,巴什科尔托斯坦共和国行政当局和俄罗斯水电公司的项目参与,以及获得免费投资资金。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Модель взаимосвязи участников профессиональной деятельности в градостроительстве Концепция реновации микрорайона Опыт формирования научного аппарата и структуры кандидатской диссертации О новой подготовке специалистов-механиков для строительной отрасли Комбинация рекуператора с вытяжным воздухоприемным устройством для использования в механических вентиляционных системах
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1