Wang Junwu, Hu Die, Wu Han, W. Mengyu, Liu Denghui
{"title":"Risk assessment in construction of small-diameter deep drainage tunnel","authors":"Wang Junwu, Hu Die, Wu Han, W. Mengyu, Liu Denghui","doi":"10.16265/J.CNKI.ISSN1003-3033.2020.06.017","DOIUrl":null,"url":null,"abstract":"In order to identify construction risk of small ̄diameter deep drainage tunnel shields and accurately evaluate risk levelꎬ a HAZOP ̄based risk identification method and an evaluation method based on rough sets and cloud models were proposed. Firstlyꎬ construction risks were identified comprehensively by using HAZOP and an evaluation index system was established according to attribute reduction theory of rough sets. Thenꎬ a risk assessment model for small ̄diameter tunnel shield construction was established by combining rough sets and cloud model. Finallyꎬ the model was verified with deep tunnel project of East Lake as an example. The results show that evaluations of the model are basically consistent with actual situationꎬ and major factors causing high ̄ level construction risks include delayed adjustment of tunneling parametersꎬ deficient training and evaluationꎬ clogged grouting pipesꎬ falling down of hoisting equipmentꎬ and unspecific engineering geological and hydrogeological surveysꎬ and they should be checked and avoided.","PeriodicalId":9976,"journal":{"name":"中国安全科学学报","volume":"86 1","pages":"113"},"PeriodicalIF":0.0000,"publicationDate":"2020-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"中国安全科学学报","FirstCategoryId":"1089","ListUrlMain":"https://doi.org/10.16265/J.CNKI.ISSN1003-3033.2020.06.017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
In order to identify construction risk of small ̄diameter deep drainage tunnel shields and accurately evaluate risk levelꎬ a HAZOP ̄based risk identification method and an evaluation method based on rough sets and cloud models were proposed. Firstlyꎬ construction risks were identified comprehensively by using HAZOP and an evaluation index system was established according to attribute reduction theory of rough sets. Thenꎬ a risk assessment model for small ̄diameter tunnel shield construction was established by combining rough sets and cloud model. Finallyꎬ the model was verified with deep tunnel project of East Lake as an example. The results show that evaluations of the model are basically consistent with actual situationꎬ and major factors causing high ̄ level construction risks include delayed adjustment of tunneling parametersꎬ deficient training and evaluationꎬ clogged grouting pipesꎬ falling down of hoisting equipmentꎬ and unspecific engineering geological and hydrogeological surveysꎬ and they should be checked and avoided.
期刊介绍:
China Safety Science Journal is administered by China Association for Science and Technology and sponsored by China Occupational Safety and Health Association (formerly China Society of Science and Technology for Labor Protection). It was first published on January 20, 1991 and was approved for public distribution at home and abroad.
China Safety Science Journal (CN 11-2865/X ISSN 1003-3033 CODEN ZAKXAM) is a monthly magazine, 12 issues a year, large 16 folo, the domestic price of each book is 40.00 yuan, the annual price is 480.00 yuan. Mailing code 82-454.
Honors:
Scopus database includes journals in the field of safety science of high-quality scientific journals classification catalog T1 level
National Chinese core journals China Science and technology core journals CSCD journals
The United States "Chemical Abstracts" search included the United States "Cambridge Scientific Abstracts: Materials Information" search included