Gas Lift Robbing Prevention in Dual String Completion using Production Pressure Operating Valve

F. Sajjad, Khairullah Sastradinata, S. D. Rahmawati, A. Mansur, A. Wirawan, Ecep Mujib
{"title":"Gas Lift Robbing Prevention in Dual String Completion using Production Pressure Operating Valve","authors":"F. Sajjad, Khairullah Sastradinata, S. D. Rahmawati, A. Mansur, A. Wirawan, Ecep Mujib","doi":"10.2118/192474-MS","DOIUrl":null,"url":null,"abstract":"\n Common problem for dual string completion gas lift well is a misallocation problem called as a gas lift robbing, where the gas tends to be injected uncontrollably to one of the tubings. Consequently, both oil production of the strings drops since the injected gas does not meet the optimum allocation. To solve this, engineers need to shut in one of the strings using wireline which is time-consuming and uneconomic. Therefore, the objective of this paper is to introduce the modification of dual string gas lift design that can economically prevent gas lift robbing problem in the well during the production time.\n This finding occurred in Indonesia, Offshore North West Java field, where the orifice is preferably used as the operating valve. However, Production Pressure Operating (PPO) valve is then used to replace the orifice function to overcome the problem. The methodology starts with well selection based on the possibility to perform the new design. Then, the static bottom-hole pressure test applied in each zone to obtain an appropriate pressure. Lastly, PPO valve’s Pressure Test Rack Opening (PTRO) will be designed based on the measured bottom-hole pressure to be applied to one of the selected string to prevent the gas lift robbing.\n The force balance is then calculated, and the PPO valve is set to the short string with the Pressure Test Rack Opening (PTRO) 585 psig at 80°F. The oil production in the robbing well observed to increase by 45% and achieved a sustainable production after replacing its orifice with the PPO valve. Also, The PPO valve will prevent the gas robs to the selected string as it will close automatically when its tubing pressure drops bellow PTRO. Hence, the wireline activity is now unnecessary because the PPO valve will be closed automatically when the gas lift robbing occurs again.\n The use of PPO valve is commonly suitable as an unloader in low availability of Casing Head Pressure (CHP) and high reservoir pressure. By this study, PPO valve has been successfully replaced orifice function with high CHP and low reservoir pressure to prevent the gas lift robbing problem effectively in Offshore North West Java field.","PeriodicalId":11089,"journal":{"name":"Day 2 Wed, October 30, 2019","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, October 30, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/192474-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Common problem for dual string completion gas lift well is a misallocation problem called as a gas lift robbing, where the gas tends to be injected uncontrollably to one of the tubings. Consequently, both oil production of the strings drops since the injected gas does not meet the optimum allocation. To solve this, engineers need to shut in one of the strings using wireline which is time-consuming and uneconomic. Therefore, the objective of this paper is to introduce the modification of dual string gas lift design that can economically prevent gas lift robbing problem in the well during the production time. This finding occurred in Indonesia, Offshore North West Java field, where the orifice is preferably used as the operating valve. However, Production Pressure Operating (PPO) valve is then used to replace the orifice function to overcome the problem. The methodology starts with well selection based on the possibility to perform the new design. Then, the static bottom-hole pressure test applied in each zone to obtain an appropriate pressure. Lastly, PPO valve’s Pressure Test Rack Opening (PTRO) will be designed based on the measured bottom-hole pressure to be applied to one of the selected string to prevent the gas lift robbing. The force balance is then calculated, and the PPO valve is set to the short string with the Pressure Test Rack Opening (PTRO) 585 psig at 80°F. The oil production in the robbing well observed to increase by 45% and achieved a sustainable production after replacing its orifice with the PPO valve. Also, The PPO valve will prevent the gas robs to the selected string as it will close automatically when its tubing pressure drops bellow PTRO. Hence, the wireline activity is now unnecessary because the PPO valve will be closed automatically when the gas lift robbing occurs again. The use of PPO valve is commonly suitable as an unloader in low availability of Casing Head Pressure (CHP) and high reservoir pressure. By this study, PPO valve has been successfully replaced orifice function with high CHP and low reservoir pressure to prevent the gas lift robbing problem effectively in Offshore North West Java field.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
利用生产压力操作阀防止双管柱完井气举打劫
双管柱完井气举井的常见问题是分配不当,称为气举抢劫,即气体往往无法控制地注入到其中一根油管中。因此,由于注入的气体没有达到最佳分配,两个管柱的产油量都下降了。为了解决这个问题,工程师需要使用电缆关闭其中一根管柱,这既耗时又不经济。因此,本文的目的是介绍对双管柱气举设计的改进,以经济地防止生产过程中出现气举抢井问题。这一发现发生在印度尼西亚的西北爪哇海上油田,在那里,孔板最好用作操作阀。然而,生产压力操作(PPO)阀随后被用来取代孔口功能来克服这个问题。该方法首先根据执行新设计的可能性进行井选择。然后,在每个层段进行静态井底压力测试,以获得合适的压力。最后,根据测量到的井底压力,设计PPO阀的压力测试架开口(PTRO),以防止气举破坏。然后计算力平衡,并将PPO阀设置为短管柱,压力测试架开度(PTRO)为585 psig,温度为80°F。在用PPO阀替换井孔后,该井的产油量增加了45%,并实现了可持续生产。此外,当油管压力低于PTRO时,PPO阀将自动关闭,从而防止气体进入所选管柱。因此,现在不需要电缆作业,因为当再次发生气举抢劫时,PPO阀将自动关闭。PPO阀通常适用于低套管水头压力(CHP)和高油藏压力的泄油装置。通过本研究,成功地将PPO阀以高热值、低储层压力的方式取代孔板功能,有效地防止了西北爪哇海上油田气举抢井问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Territorial differentiation of the language situation in Sumy region as a factor of formation of regional identity Barrier-free tourism as a means of physical recreation for persons with disabilities on the example of the developed active tour «Conquering diseases» Causes and consequences of external labor migration in Ukraine (on the example of Ivano-Frankivsk region) Visibility analysis of the urbanistic environmet as a constituent of the urbogeosystems approach Possibilities of using tourist and recreational potential in the conditions of decentralization (on the example of UTC of Volyn region)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1