{"title":"Time Frame","authors":"Thomas Yarrow","doi":"10.7591/cornell/9781501738494.003.0048","DOIUrl":null,"url":null,"abstract":"Contracts specify what must happen but also when. Architects must coordinate things in time as well as in space, making sure buildings are constructed “as planned” and “on time.”32 Each project is made up of a series of phases. The completion of phases is linked to the payment of fees. Intervals are prescribed in advance, limited by a fee proposal through which costs are fixed. Projects anticipate a series of known future outcomes that are worked toward: the definition of a brief; the development of a design; the detailed development of plans for planning permission and then for tendering; and the construction of the building. The time of the project is linear and sequential: each phase follows the next, one after the other. Keeping things “on time” is an important but difficult accomplishment....","PeriodicalId":79772,"journal":{"name":"AIA journal. American Institute of Architects","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"AIA journal. American Institute of Architects","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7591/cornell/9781501738494.003.0048","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Contracts specify what must happen but also when. Architects must coordinate things in time as well as in space, making sure buildings are constructed “as planned” and “on time.”32 Each project is made up of a series of phases. The completion of phases is linked to the payment of fees. Intervals are prescribed in advance, limited by a fee proposal through which costs are fixed. Projects anticipate a series of known future outcomes that are worked toward: the definition of a brief; the development of a design; the detailed development of plans for planning permission and then for tendering; and the construction of the building. The time of the project is linear and sequential: each phase follows the next, one after the other. Keeping things “on time” is an important but difficult accomplishment....
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
时间框架
合同规定了必须做什么,但也规定了时间。建筑师必须在时间和空间上协调事物,确保建筑物“按计划”和“按时”建造。每个项目都由一系列阶段组成。阶段的完成与费用的支付有关。间隔是预先规定的,并受收费建议的限制,通过收费建议,成本是固定的。项目预测一系列已知的未来结果,并努力实现这些结果:概要的定义;设计:设计的发展;详细制定规划,申请规划许可,然后进行招标;还有大楼的建造。项目的时间是线性的和顺序的:每个阶段紧跟着下一个阶段,一个接一个。保持事情“准时”是一项重要但困难的成就....
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Questions of Vocation Magic Moments At the Limits of the Contract Professionalism Part 2. LIVES
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1