Impact of Energy Crisis on Industries of Pakistan: A Case of Khyber-Pakhtunkhwa Industries

H. Khan, Habib-ur-Rehman, N. Ullah, W. Ullah, I. Khan
{"title":"Impact of Energy Crisis on Industries of Pakistan: A Case of Khyber-Pakhtunkhwa Industries","authors":"H. Khan, Habib-ur-Rehman, N. Ullah, W. Ullah, I. Khan","doi":"10.54692/ajss.2021.05021384","DOIUrl":null,"url":null,"abstract":"Electricity energy  crisis croppoed up in 2009 due to widening gap in demand and supply of power in Pakistan  due to declining production and increasing demand resulting from growing population and economic activities. Resultantly the industrial poduction is worsely affected due to frequent power supply shortage which is still a serious challenge to development economists and power suppliers. Also adversly affected quality of production of industries which operate on delicate material.  No doubt most of the industries have since established their own energy production units yet the cost of production has further added to difficulties. This discourages enterpreneurs and retards industrial growth. This study examines and quantifies the socio-economic impact of electricity outages in the “Hayatabad Industrial Estate” Peshawar, Pakistan. In order to identify multi-dimentional impact experienced by industries i.e. extra cost of energy generation including maintenance cost of additional power generating equipments, inevitable extra shift/ hours engagement, for production and sales, target acheivements etc an intensive study was made  by collecting data through face to face interview. The primary data was collected through questionnaire for the analysis of the study. A cluster that is “Hayatabad Industrial Estate” was selected as it is one of the large and old  industrial estate of KPK. This study encompasses 374 companies of Hayatabad Industrial Estate Peshawar, Pakistan as a sample representing all industries of the Khyber Pakhtunkhwa. Total cost of electricty outages is considered to be the sum of direct and indirect cost. The paper suggests that as an urgent measure the existing installed capacity be enhanced by upgrading the power production equipments. Immediate measures be taken to minimse silt deposition in all the three dames by silt clearing. To save energy from wastage illegal connection and stealing be checked through stern action by the state authorities. In the mean time solar energy system be encouraged by subsidisng the solar systems particularly for industrial installation. This study will quantify the financial impact of load shedding and bring in the knowledge of all stakeholders specifically the government to help them expedite the remedial actions. \n ","PeriodicalId":7068,"journal":{"name":"Academic Journal of Social Sciences (AJSS )","volume":"3 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Academic Journal of Social Sciences (AJSS )","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54692/ajss.2021.05021384","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Electricity energy  crisis croppoed up in 2009 due to widening gap in demand and supply of power in Pakistan  due to declining production and increasing demand resulting from growing population and economic activities. Resultantly the industrial poduction is worsely affected due to frequent power supply shortage which is still a serious challenge to development economists and power suppliers. Also adversly affected quality of production of industries which operate on delicate material.  No doubt most of the industries have since established their own energy production units yet the cost of production has further added to difficulties. This discourages enterpreneurs and retards industrial growth. This study examines and quantifies the socio-economic impact of electricity outages in the “Hayatabad Industrial Estate” Peshawar, Pakistan. In order to identify multi-dimentional impact experienced by industries i.e. extra cost of energy generation including maintenance cost of additional power generating equipments, inevitable extra shift/ hours engagement, for production and sales, target acheivements etc an intensive study was made  by collecting data through face to face interview. The primary data was collected through questionnaire for the analysis of the study. A cluster that is “Hayatabad Industrial Estate” was selected as it is one of the large and old  industrial estate of KPK. This study encompasses 374 companies of Hayatabad Industrial Estate Peshawar, Pakistan as a sample representing all industries of the Khyber Pakhtunkhwa. Total cost of electricty outages is considered to be the sum of direct and indirect cost. The paper suggests that as an urgent measure the existing installed capacity be enhanced by upgrading the power production equipments. Immediate measures be taken to minimse silt deposition in all the three dames by silt clearing. To save energy from wastage illegal connection and stealing be checked through stern action by the state authorities. In the mean time solar energy system be encouraged by subsidisng the solar systems particularly for industrial installation. This study will quantify the financial impact of load shedding and bring in the knowledge of all stakeholders specifically the government to help them expedite the remedial actions.  
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
能源危机对巴基斯坦工业的影响:以开伯尔-普赫图赫瓦省工业为例
电力能源危机出现在2009年,由于巴基斯坦的电力需求和供应差距扩大,由于人口和经济活动的增长导致生产下降和需求增加。频繁的电力短缺严重影响了工业生产,这对发展经济学家和电力供应商来说仍然是一个严峻的挑战。同时也影响了在精细材料上操作的工业的生产质量。毫无疑问,大多数工业已经建立了自己的能源生产单位,但生产成本进一步增加了困难。这挫伤了企业家的积极性,阻碍了工业发展。本研究考察并量化了巴基斯坦白沙瓦“哈亚塔巴德工业区”停电的社会经济影响。为了确定行业所经历的多维影响,即额外的能源生产成本,包括额外发电设备的维护成本,不可避免的额外班次/小时参与,生产和销售,目标实现等,通过面对面访谈收集数据进行了深入研究。通过问卷调查收集主要数据,对研究进行分析。“Hayatabad工业园区”集群被选中,因为它是KPK的大型老工业园区之一。本研究以巴基斯坦白沙瓦哈亚塔巴德工业区的374家公司为样本,代表了开伯尔-普赫图赫瓦省的所有行业。停电总成本被认为是直接和间接成本的总和。建议通过对电力生产设备的升级改造,提高现有装机容量,作为一项紧急措施。应立即采取措施,以清淤的方式,尽量减少三个水坝的淤积。为了节约能源,防止浪费,非法连接和偷窃,国家当局将通过严厉的行动来制止。同时,通过补贴太阳能系统,特别是工业安装,鼓励太阳能系统的发展。这项研究将量化减载的财务影响,并引入所有利益相关者(特别是政府)的知识,以帮助他们加快补救行动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Sino-US Contestation and Its Implications for South Asia Understanding the Impact of Service Convenience on Customer Satisfaction in Home Delivery: Evidence from Karachi Threats to Various Components of Human Security Cause Brain Drain in Pakistan Examining The Mediating Role of Workplace Incivility Between Emotional Intelligence and Organizational Commitment Water Scarcity in Gwadar: Challenges and Way Forward
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1