{"title":"Successful Implementation of New Technologies in Sour Oman Fields: Securing High Risk Wells, Savings & Production Increase","authors":"T. Narwal, Yaqoob Riyami, M. Rashdi, Zahir Abri, Aisha Sariri, Ahmed Benchekor, A. Hadhrami, R. Dsouza, A. Brodie, Kyle Strom","doi":"10.2118/192711-MS","DOIUrl":null,"url":null,"abstract":"\n In South Oman, PDO is producing from high Sour Fields (H2S 1-10%) with high reservoir pressures ranging from 50,000 to 100,000kpa for more than 20 yrs. Operating these high sour wells comes with huge challenges and risks, which can easily get escalated to very high levels in case of any integrity issues with the wells. These situations not only provide significant exposure to expensive and risky well interventions but also pose threats to production due to Simultaneous Operations (SIMOPS) issues.\n The authors describe case studies where team was exposed to these challenging situations due to integrity failures in two such wells. New technologies were implemented which resulted in restoring the well integrity in a very cost effective manner (cost savings worth millions) and also reduced the HSE risks on the nearby operations. As a result, production was safeguarded (3-4% of Station Capacity) by allowing drilling of new wells and oil deferment from existing wells in the nearby area was avoided.","PeriodicalId":11208,"journal":{"name":"Day 2 Tue, November 13, 2018","volume":"33 7","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, November 13, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/192711-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In South Oman, PDO is producing from high Sour Fields (H2S 1-10%) with high reservoir pressures ranging from 50,000 to 100,000kpa for more than 20 yrs. Operating these high sour wells comes with huge challenges and risks, which can easily get escalated to very high levels in case of any integrity issues with the wells. These situations not only provide significant exposure to expensive and risky well interventions but also pose threats to production due to Simultaneous Operations (SIMOPS) issues. The authors describe case studies where team was exposed to these challenging situations due to integrity failures in two such wells. New technologies were implemented which resulted in restoring the well integrity in a very cost effective manner (cost savings worth millions) and also reduced the HSE risks on the nearby operations. As a result, production was safeguarded (3-4% of Station Capacity) by allowing drilling of new wells and oil deferment from existing wells in the nearby area was avoided.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
新技术在阿曼油田的成功应用:确保高风险井的安全,节约和提高产量
在南阿曼,PDO在高含硫油田(H2S 1-10%)进行生产,油藏压力在5万至10万kpa之间,持续时间超过20年。操作这些高酸井面临着巨大的挑战和风险,如果井的完整性出现问题,这些挑战和风险很容易升级到非常高的水平。这些情况不仅会带来昂贵且高风险的油井干预措施,而且由于同步作业(SIMOPS)问题,也会对生产造成威胁。作者描述了一些案例研究,在这些案例中,由于两口井的完整性失效,团队面临着这些具有挑战性的情况。新技术的实施,以一种非常经济有效的方式恢复了油井的完整性(节省了数百万美元的成本),并降低了附近作业的HSE风险。因此,通过钻探新井,保证了产量(3-4%的产能),避免了附近地区现有井的延期产油。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Crisis as Source of Innovation Strategy at ADNOC LNG Successful Implementation of Torque and Drag Management Techniques in High Departure Wells is the Key to Safely Reach Wells Planned Total Depth in Offshore Artificial Islands Efficiency, Economics and Compliance: A Practical Planning Tool for Optimizing Cuttings Treatment First Cross-Dipole Shear Wave Imaging Application for Intersecting a Mother Open-Hole from a Near-Parallel Side-Track Wellbore Effect of Drilling Muds Wall Slip on Reliable Frictional Pressure Loss Estimations in Offshore Drilling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1