{"title":"省煤器油管系统更新决策优化","authors":"Yong Sun, Lin Ma, C. Fidge","doi":"10.1109/INFRA.2008.5439663","DOIUrl":null,"url":null,"abstract":"The economizer is a critical component in coal fired power stations. An optimal renewal strategy is needed for minimizing the lifetime cost of this component. Here we present an effective optimization approach which considers economizer tubing failure probabilities, repair and renewal costs, potential production losses, and fluctuations in electricity market prices.","PeriodicalId":207041,"journal":{"name":"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)","volume":" 16","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Optimization of economizer tubing system renewal decisions\",\"authors\":\"Yong Sun, Lin Ma, C. Fidge\",\"doi\":\"10.1109/INFRA.2008.5439663\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The economizer is a critical component in coal fired power stations. An optimal renewal strategy is needed for minimizing the lifetime cost of this component. Here we present an effective optimization approach which considers economizer tubing failure probabilities, repair and renewal costs, potential production losses, and fluctuations in electricity market prices.\",\"PeriodicalId\":207041,\"journal\":{\"name\":\"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)\",\"volume\":\" 16\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INFRA.2008.5439663\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INFRA.2008.5439663","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Optimization of economizer tubing system renewal decisions
The economizer is a critical component in coal fired power stations. An optimal renewal strategy is needed for minimizing the lifetime cost of this component. Here we present an effective optimization approach which considers economizer tubing failure probabilities, repair and renewal costs, potential production losses, and fluctuations in electricity market prices.