{"title":"基于CVI的动态调度并行测试系统","authors":"Fan Shuyi, Wang Cheng, Cui Shao Shui","doi":"10.1109/ICCIAUTOM.2011.6183908","DOIUrl":null,"url":null,"abstract":"This paper develops a practical dynamic scheduling parallel test system with multi-threading technology that CVI supports and appropriate hardware resources. In process of tasks scheduling, it can automatically search for available free test resources dynamically and allocate it to the task that is waiting to be tested. The test result shows this method can make full use of test resources and improves the test efficiency greatly as compared with serial test.","PeriodicalId":177039,"journal":{"name":"2011 2nd International Conference on Control, Instrumentation and Automation (ICCIA)","volume":"12 2","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A dynamic scheduling parallel test system with CVI\",\"authors\":\"Fan Shuyi, Wang Cheng, Cui Shao Shui\",\"doi\":\"10.1109/ICCIAUTOM.2011.6183908\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper develops a practical dynamic scheduling parallel test system with multi-threading technology that CVI supports and appropriate hardware resources. In process of tasks scheduling, it can automatically search for available free test resources dynamically and allocate it to the task that is waiting to be tested. The test result shows this method can make full use of test resources and improves the test efficiency greatly as compared with serial test.\",\"PeriodicalId\":177039,\"journal\":{\"name\":\"2011 2nd International Conference on Control, Instrumentation and Automation (ICCIA)\",\"volume\":\"12 2\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 2nd International Conference on Control, Instrumentation and Automation (ICCIA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCIAUTOM.2011.6183908\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 2nd International Conference on Control, Instrumentation and Automation (ICCIA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCIAUTOM.2011.6183908","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A dynamic scheduling parallel test system with CVI
This paper develops a practical dynamic scheduling parallel test system with multi-threading technology that CVI supports and appropriate hardware resources. In process of tasks scheduling, it can automatically search for available free test resources dynamically and allocate it to the task that is waiting to be tested. The test result shows this method can make full use of test resources and improves the test efficiency greatly as compared with serial test.