不接地系统中的单相铁磁共振导致系统通电时避雷器失效

I. R. Pordanjani, Xiaodong Liang, Yunfei Wang, Astried Schneider
{"title":"不接地系统中的单相铁磁共振导致系统通电时避雷器失效","authors":"I. R. Pordanjani, Xiaodong Liang, Yunfei Wang, Astried Schneider","doi":"10.1109/ICPS51807.2021.9416609","DOIUrl":null,"url":null,"abstract":"Ferroresonance often occurs in power systems during system switching actions, which can create overvoltages and pose great risks to the equipment safety. In this paper, a single-phase ferroresonance incident during a system energization is presented, which occurred at a single-phase station service transformer in an ungrounded system, causing surge arresters' failure. The incident is investigated through PSCAD simulations and analytical analysis. The relay field record is used to compare with the simulation results in order to validate the PSCAD simulation model. Several case studies are conducted using PSCAD simulations to evaluate various contributing factors to this ferroresonance incident. The root cause of the incident is found to be the lack of ground during energization in the system. Field practices are recommended to be implemented before the system energization to avoid such incidents, which were proved to be effective by successfully energizing the system in the field following these practices.","PeriodicalId":350508,"journal":{"name":"2021 IEEE/IAS 57th Industrial and Commercial Power Systems Technical Conference (I&CPS)","volume":"6 15","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Single-Phase Ferroresonance in an Ungrounded System Causing Surge Arresters Failure during the System Energization\",\"authors\":\"I. R. Pordanjani, Xiaodong Liang, Yunfei Wang, Astried Schneider\",\"doi\":\"10.1109/ICPS51807.2021.9416609\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Ferroresonance often occurs in power systems during system switching actions, which can create overvoltages and pose great risks to the equipment safety. In this paper, a single-phase ferroresonance incident during a system energization is presented, which occurred at a single-phase station service transformer in an ungrounded system, causing surge arresters' failure. The incident is investigated through PSCAD simulations and analytical analysis. The relay field record is used to compare with the simulation results in order to validate the PSCAD simulation model. Several case studies are conducted using PSCAD simulations to evaluate various contributing factors to this ferroresonance incident. The root cause of the incident is found to be the lack of ground during energization in the system. Field practices are recommended to be implemented before the system energization to avoid such incidents, which were proved to be effective by successfully energizing the system in the field following these practices.\",\"PeriodicalId\":350508,\"journal\":{\"name\":\"2021 IEEE/IAS 57th Industrial and Commercial Power Systems Technical Conference (I&CPS)\",\"volume\":\"6 15\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-04-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 IEEE/IAS 57th Industrial and Commercial Power Systems Technical Conference (I&CPS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPS51807.2021.9416609\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE/IAS 57th Industrial and Commercial Power Systems Technical Conference (I&CPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPS51807.2021.9416609","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

电力系统在系统开关动作中经常发生铁磁谐振,会产生过电压,给设备安全带来极大的风险。本文介绍了在不接地系统中,单相站用变压器在系统通电时发生的单相铁磁谐振事件,引起避雷器失效。通过PSCAD模拟和分析分析对该事件进行了调查。为了验证PSCAD仿真模型,使用中继场记录与仿真结果进行比较。使用PSCAD模拟进行了几个案例研究,以评估导致这种铁共振事件的各种因素。事故的根本原因是在系统上电时接地不足。建议在系统通电之前实施现场实践,以避免此类事件的发生,通过遵循这些实践在现场成功通电系统,证明了这些实践是有效的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Single-Phase Ferroresonance in an Ungrounded System Causing Surge Arresters Failure during the System Energization
Ferroresonance often occurs in power systems during system switching actions, which can create overvoltages and pose great risks to the equipment safety. In this paper, a single-phase ferroresonance incident during a system energization is presented, which occurred at a single-phase station service transformer in an ungrounded system, causing surge arresters' failure. The incident is investigated through PSCAD simulations and analytical analysis. The relay field record is used to compare with the simulation results in order to validate the PSCAD simulation model. Several case studies are conducted using PSCAD simulations to evaluate various contributing factors to this ferroresonance incident. The root cause of the incident is found to be the lack of ground during energization in the system. Field practices are recommended to be implemented before the system energization to avoid such incidents, which were proved to be effective by successfully energizing the system in the field following these practices.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Single-Phase Ferroresonance in an Ungrounded System Causing Surge Arresters Failure during the System Energization Residential Electrical Fire in Shenzhen: Data Analysis and Possible Solution Automatic Power System Restoration With Inrush Current Estimation For Industrial Facility Establishment of Low Voltage Ride-Through Curves and Stability Analysis with High Photovoltaic Penetration in Power Systems DER Control and Utility Interconnection Management of a Distributed Microgrid
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1