HGOR的创新井设计:利用普通气井液化技术提高天然气产量

J. Goldney, B. Mohando, G. Cometto, M. Ballarini, R. Mazzola
{"title":"HGOR的创新井设计:利用普通气井液化技术提高天然气产量","authors":"J. Goldney, B. Mohando, G. Cometto, M. Ballarini, R. Mazzola","doi":"10.2118/190966-MS","DOIUrl":null,"url":null,"abstract":"\n A novel and flexible completion design for HGOR Wells is presented to cover all the gas well production stages in order to avoid rig interventions during natural flow which would reduce gas production potential due to water influx into the reservoir.\n The objective of this paper is to introduce the proposed completion designs so other engineers can apply and improve them in their HGOR wells, maximizing gas production and reducing costs.\n After studying the conversions from natural flowing wells to Artificial Lifted wells in which gas production was never recovered, the behavior was determined to be from damage (water blockage) in the near wellbore caused by the fluids used in the rig operations.\n A decision was made to anticipate the inherent problems through a flexible completion design that allows for the production of different reservoirs, with tubing and/or annular flow, plunger lift, gas lift, and changing to Sucker Rod Pumping without moving tubing or killing the well, especially in the gas reservoirs.\n The flexible completions also allowed for further studies of the well and proposed interventions to assist the flow.","PeriodicalId":373819,"journal":{"name":"Day 3 Thu, August 30, 2018","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Innovative Well Designs for HGOR: Extending Gas Production with Common Gas Well Deliquification Techniques\",\"authors\":\"J. Goldney, B. Mohando, G. Cometto, M. Ballarini, R. Mazzola\",\"doi\":\"10.2118/190966-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n A novel and flexible completion design for HGOR Wells is presented to cover all the gas well production stages in order to avoid rig interventions during natural flow which would reduce gas production potential due to water influx into the reservoir.\\n The objective of this paper is to introduce the proposed completion designs so other engineers can apply and improve them in their HGOR wells, maximizing gas production and reducing costs.\\n After studying the conversions from natural flowing wells to Artificial Lifted wells in which gas production was never recovered, the behavior was determined to be from damage (water blockage) in the near wellbore caused by the fluids used in the rig operations.\\n A decision was made to anticipate the inherent problems through a flexible completion design that allows for the production of different reservoirs, with tubing and/or annular flow, plunger lift, gas lift, and changing to Sucker Rod Pumping without moving tubing or killing the well, especially in the gas reservoirs.\\n The flexible completions also allowed for further studies of the well and proposed interventions to assist the flow.\",\"PeriodicalId\":373819,\"journal\":{\"name\":\"Day 3 Thu, August 30, 2018\",\"volume\":\"15 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-08-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, August 30, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/190966-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, August 30, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/190966-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

提出了一种新颖灵活的HGOR井完井设计,可以覆盖所有气井的生产阶段,以避免在自然流动过程中由于水流入储层而降低产气潜力的钻机干预。本文的目的是介绍建议的完井设计,以便其他工程师可以在他们的高采收率井中应用和改进它们,最大限度地提高天然气产量并降低成本。在研究了从自然流动井到人工举升井的转化过程(这些井的天然气产量从未恢复)后,确定了这种行为是由钻井作业中使用的流体造成的近井筒损害(水堵塞)造成的。公司决定通过灵活的完井设计来预测固有问题,该设计允许生产不同的储层,包括油管和/或环空流动、柱塞举升、气举,以及在不移动油管或压井的情况下改为有杆泵送,特别是在气藏中。灵活的完井还可以进一步研究井,并提出干预措施,以辅助流动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Innovative Well Designs for HGOR: Extending Gas Production with Common Gas Well Deliquification Techniques
A novel and flexible completion design for HGOR Wells is presented to cover all the gas well production stages in order to avoid rig interventions during natural flow which would reduce gas production potential due to water influx into the reservoir. The objective of this paper is to introduce the proposed completion designs so other engineers can apply and improve them in their HGOR wells, maximizing gas production and reducing costs. After studying the conversions from natural flowing wells to Artificial Lifted wells in which gas production was never recovered, the behavior was determined to be from damage (water blockage) in the near wellbore caused by the fluids used in the rig operations. A decision was made to anticipate the inherent problems through a flexible completion design that allows for the production of different reservoirs, with tubing and/or annular flow, plunger lift, gas lift, and changing to Sucker Rod Pumping without moving tubing or killing the well, especially in the gas reservoirs. The flexible completions also allowed for further studies of the well and proposed interventions to assist the flow.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Use of Run-Life Measures in Estimating Artificial Lift System Reliability Tuning VSDs in ESP Wells to Optimize Oil Production—Case Studies Innovative Well Designs for HGOR: Extending Gas Production with Common Gas Well Deliquification Techniques Innovative Downhole Design for Optimizing ALS Installation at Shale Oil Wells Getting Wells Back to Production Using an Innovative Artificial Lift System for Recovering Inactive Wells
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1