{"title":"计算基于项目的行业的小时成本率。第2部分成本管理","authors":"J. Emblemsvåg, G. Cokins","doi":"10.19255/JMPM02205","DOIUrl":null,"url":null,"abstract":"Hourly cost rates are crucial project costing due to the substantial proportion of labor cost in projects. Yet, there is little published about calculating hourly cost rates, and it is a contentious topic in corporations. Therefore, an approach is provided in this paper that will improve the calculation of hourly cost rates. It is based on a novel approach to Activity-Based Costing (ABC) and a revised version of the CAM-I Capacity Model which is adopted to project-based industries. Both an example and a case are provided to allow detailed discussions.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-01-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Calculating hourly cost rates in project-based industries – part 2; cost management\",\"authors\":\"J. Emblemsvåg, G. Cokins\",\"doi\":\"10.19255/JMPM02205\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Hourly cost rates are crucial project costing due to the substantial proportion of labor cost in projects. Yet, there is little published about calculating hourly cost rates, and it is a contentious topic in corporations. Therefore, an approach is provided in this paper that will improve the calculation of hourly cost rates. It is based on a novel approach to Activity-Based Costing (ABC) and a revised version of the CAM-I Capacity Model which is adopted to project-based industries. Both an example and a case are provided to allow detailed discussions.\",\"PeriodicalId\":320094,\"journal\":{\"name\":\"The Journal of Modern Project Management\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Journal of Modern Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.19255/JMPM02205\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Modern Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19255/JMPM02205","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Calculating hourly cost rates in project-based industries – part 2; cost management
Hourly cost rates are crucial project costing due to the substantial proportion of labor cost in projects. Yet, there is little published about calculating hourly cost rates, and it is a contentious topic in corporations. Therefore, an approach is provided in this paper that will improve the calculation of hourly cost rates. It is based on a novel approach to Activity-Based Costing (ABC) and a revised version of the CAM-I Capacity Model which is adopted to project-based industries. Both an example and a case are provided to allow detailed discussions.