基于优先级策略的混合流车间调度问题早/迟情况的DE解

Zhonghua Han, Haibo Shi, Feng Qiao, L. Yue
{"title":"基于优先级策略的混合流车间调度问题早/迟情况的DE解","authors":"Zhonghua Han, Haibo Shi, Feng Qiao, L. Yue","doi":"10.1109/ICMIC.2011.5973667","DOIUrl":null,"url":null,"abstract":"The earliness/tardiness (E/T) case of Hybrid Flow-shop Scheduling problem (HFSP) is an NP hard problem, which is difficult to deal with, however, the local assignment existing in the practical production increases the complexity of this problem. How to solve the combinatorial optimization problem effectively and optimally is still an open issue today. In this paper, differential evolution algorithm (DE) combined with priority strategy is used to solve this E/T scheduling problem. Firstly, DE algorithm is used to make global assignment and obtain each job's process route. Secondly, the operating priority of the jobs in buffer area deduced from the expectation completion sequence is used to direct the local production assignment between stages, then the starting time of each job can be determined. Finally, under the constraints of the due-date, the global optimization with the minimal penalty sum of E/T is obtained. Several scheme comparisons with simulation results show the effectiveness of the proposed method.","PeriodicalId":210380,"journal":{"name":"Proceedings of 2011 International Conference on Modelling, Identification and Control","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2011-06-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"DE solution for the earliness/tardiness case of Hybrid Flow-shop Scheduling problem with priority strategy\",\"authors\":\"Zhonghua Han, Haibo Shi, Feng Qiao, L. Yue\",\"doi\":\"10.1109/ICMIC.2011.5973667\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The earliness/tardiness (E/T) case of Hybrid Flow-shop Scheduling problem (HFSP) is an NP hard problem, which is difficult to deal with, however, the local assignment existing in the practical production increases the complexity of this problem. How to solve the combinatorial optimization problem effectively and optimally is still an open issue today. In this paper, differential evolution algorithm (DE) combined with priority strategy is used to solve this E/T scheduling problem. Firstly, DE algorithm is used to make global assignment and obtain each job's process route. Secondly, the operating priority of the jobs in buffer area deduced from the expectation completion sequence is used to direct the local production assignment between stages, then the starting time of each job can be determined. Finally, under the constraints of the due-date, the global optimization with the minimal penalty sum of E/T is obtained. Several scheme comparisons with simulation results show the effectiveness of the proposed method.\",\"PeriodicalId\":210380,\"journal\":{\"name\":\"Proceedings of 2011 International Conference on Modelling, Identification and Control\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-06-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of 2011 International Conference on Modelling, Identification and Control\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICMIC.2011.5973667\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 2011 International Conference on Modelling, Identification and Control","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMIC.2011.5973667","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

混合流车间调度问题(HFSP)的早/迟(E/T)情况是一个难以处理的NP困难问题,而实际生产中存在的局部分配增加了该问题的复杂性。如何有效、最优地解决组合优化问题,至今仍是一个有待解决的问题。本文将差分进化算法(DE)与优先级策略相结合来解决这一E/T调度问题。首先,采用DE算法进行全局分配,得到各作业的进程路径;其次,根据期望完成顺序推导出缓冲区内作业的作业优先级,指导各阶段间的局部生产分配,从而确定各作业的开工时间;最后,在交货期约束下,得到了E/T惩罚和最小的全局最优解。若干方案与仿真结果的比较表明了所提方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
DE solution for the earliness/tardiness case of Hybrid Flow-shop Scheduling problem with priority strategy
The earliness/tardiness (E/T) case of Hybrid Flow-shop Scheduling problem (HFSP) is an NP hard problem, which is difficult to deal with, however, the local assignment existing in the practical production increases the complexity of this problem. How to solve the combinatorial optimization problem effectively and optimally is still an open issue today. In this paper, differential evolution algorithm (DE) combined with priority strategy is used to solve this E/T scheduling problem. Firstly, DE algorithm is used to make global assignment and obtain each job's process route. Secondly, the operating priority of the jobs in buffer area deduced from the expectation completion sequence is used to direct the local production assignment between stages, then the starting time of each job can be determined. Finally, under the constraints of the due-date, the global optimization with the minimal penalty sum of E/T is obtained. Several scheme comparisons with simulation results show the effectiveness of the proposed method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A novel mutual authentication scheme for Internet of Things Linearization robust control of IPMSM for electric vehicle based on dSPACE DE solution for the earliness/tardiness case of Hybrid Flow-shop Scheduling problem with priority strategy Reduction model of a class of discrete switched linear systems: An LMI approach The synergy of QFD and TRIZ design practice — A case study for medical care bed
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1