{"title":"指定Kamianske水库的参数","authors":"V. Vyshnevskyi, V. Demianov","doi":"10.31073/mivg202101-271","DOIUrl":null,"url":null,"abstract":"The relevance of research is the lack of actual parameters of the Dnipro Сascade.  \nThe purpose and objectives of the study are to specify the actual parameters of the Kamianske Reservoir, which is the part of the Dnipro Cascade. \nMethods and techniques. The study was based on using the actual Navigation map of the Kamianske Reservoir. The available data were processed when using AutoCAD program. The satellite images were used as well. \nResults and main conclusions. It was identified that the main parameters of the Kamianske Reservoir, which is the part of the Dnipro Cascade, significantly differ from those obtained earlier, in particular, which are given in the operation rules of the Dnipro Сascade. The most important parameters of the Kamianske Reservoir to keep normal retention level (64.0 m) are as follows: water area (water surface) – 537 km2, total volume – 2636 million m3, useful storage capacity – 495 million m3. A small increase in the total volume compared to the project one is supposed to be the result of significant extraction of construction raw materials from the bottom of the reservoir. The reservoir length, depending on the ways of measuring, varies from 119 to 137 km. It was determined that the actual maximum depth of the reservoir (23 m) is significantly larger than it is indicated in reference books. The actual average depth of 5.8 m is significantly larger as well. \nSome parameters of the reservoir, which were previously ignored by researchers, are given as a result of the study. This parameter, in particular, is the area of the islands, which is 48.9 km2. The area of shallow water with depths less than 2 m is 152.4 km2. This area is mainly located in the upper and middle parts of the reservoir – mainly near the left bank. An important parameter is the cross section of the central reach of the reservoir, where the main movement of water is observed. Depending on the length of the reservoir, this cross-section varies in the range of 17,900–20,600 m2. The smallest cross-section is a characteristic feature of the upper part of the reservoir that causes an increase in flow velocity above 1.0 m/sec. It was concluded that the existing operation rules of the Dnipro Сascade does not correspond to the present and require the radical improvement. A mandatory requirement for the new rules is specifying the modern parameters of the reservoirs, built on the Dnipro River. Perspectives. There is need to specify the parameters of all reservoirs of the Dnipro Сascade. It is a basis for the development of new operation rules for the Dnipro Сascade.","PeriodicalId":298682,"journal":{"name":"Міжвідомчий тематичний науковий збірник \"Меліорація і водне господарство\"","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Specifying the parameters of the Kamianske Reservoir\",\"authors\":\"V. Vyshnevskyi, V. Demianov\",\"doi\":\"10.31073/mivg202101-271\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The relevance of research is the lack of actual parameters of the Dnipro Сascade.  \\nThe purpose and objectives of the study are to specify the actual parameters of the Kamianske Reservoir, which is the part of the Dnipro Cascade. \\nMethods and techniques. The study was based on using the actual Navigation map of the Kamianske Reservoir. The available data were processed when using AutoCAD program. The satellite images were used as well. \\nResults and main conclusions. It was identified that the main parameters of the Kamianske Reservoir, which is the part of the Dnipro Cascade, significantly differ from those obtained earlier, in particular, which are given in the operation rules of the Dnipro Сascade. The most important parameters of the Kamianske Reservoir to keep normal retention level (64.0 m) are as follows: water area (water surface) – 537 km2, total volume – 2636 million m3, useful storage capacity – 495 million m3. A small increase in the total volume compared to the project one is supposed to be the result of significant extraction of construction raw materials from the bottom of the reservoir. The reservoir length, depending on the ways of measuring, varies from 119 to 137 km. It was determined that the actual maximum depth of the reservoir (23 m) is significantly larger than it is indicated in reference books. The actual average depth of 5.8 m is significantly larger as well. \\nSome parameters of the reservoir, which were previously ignored by researchers, are given as a result of the study. This parameter, in particular, is the area of the islands, which is 48.9 km2. The area of shallow water with depths less than 2 m is 152.4 km2. This area is mainly located in the upper and middle parts of the reservoir – mainly near the left bank. An important parameter is the cross section of the central reach of the reservoir, where the main movement of water is observed. Depending on the length of the reservoir, this cross-section varies in the range of 17,900–20,600 m2. The smallest cross-section is a characteristic feature of the upper part of the reservoir that causes an increase in flow velocity above 1.0 m/sec. It was concluded that the existing operation rules of the Dnipro Сascade does not correspond to the present and require the radical improvement. A mandatory requirement for the new rules is specifying the modern parameters of the reservoirs, built on the Dnipro River. Perspectives. There is need to specify the parameters of all reservoirs of the Dnipro Сascade. It is a basis for the development of new operation rules for the Dnipro Сascade.\",\"PeriodicalId\":298682,\"journal\":{\"name\":\"Міжвідомчий тематичний науковий збірник \\\"Меліорація і водне господарство\\\"\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-05-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Міжвідомчий тематичний науковий збірник \\\"Меліорація і водне господарство\\\"\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31073/mivg202101-271\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Міжвідомчий тематичний науковий збірник \"Меліорація і водне господарство\"","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31073/mivg202101-271","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

相关的研究是缺乏实际参数的Dnipro Сascade。本研究的目的和目标是确定作为第聂伯罗瀑布一部分的卡米扬斯克水库的实际参数。方法和技术。这项研究是基于使用Kamianske水库的实际导航地图。利用AutoCAD程序对现有数据进行处理。同时也使用了卫星图像。结果及主要结论。结果表明,作为第聂伯罗级联的一部分,Kamianske水库的主要参数与之前得到的参数存在显著差异,特别是在第聂伯罗级联Сascade运行规则中给出的参数。卡米扬斯克水库保持正常蓄水水平(64.0米)的最重要参数如下:水域面积(水面)537平方公里,总积2636万立方米,有效库容4.95亿立方米。与工程一相比,总容积略有增加,这应该是由于从水库底部大量提取建筑原材料的结果。水库的长度,根据不同的测量方法,从119公里到137公里不等。经确定,水库的实际最大深度(23米)明显大于参考书所示。5.8 m的实际平均深度也明显较大。研究结果给出了一些以前被研究者忽略的储层参数。该参数特别表示岛屿的面积,为48.9平方公里。水深小于2 m的浅水面积为152.4 km2。该区域主要位于水库的上、中部,主要位于左岸附近。一个重要的参数是水库中央河段的横截面,在那里观察到水的主要运动。根据水库的长度,这个截面在17,900-20,600平方米的范围内变化。最小截面是储层上部的特征,使流速增加到1.0 m/sec以上。结论是,Dnipro Сascade现有的操作规则不符合目前的情况,需要彻底改进。新规则的强制性要求是指定建造在第聂伯罗河上的水库的现代参数。视角。需要指定Dnipro所有储层的参数Сascade。这是制定Dnipro Сascade新操作规则的基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Specifying the parameters of the Kamianske Reservoir
The relevance of research is the lack of actual parameters of the Dnipro Сascade.  The purpose and objectives of the study are to specify the actual parameters of the Kamianske Reservoir, which is the part of the Dnipro Cascade. Methods and techniques. The study was based on using the actual Navigation map of the Kamianske Reservoir. The available data were processed when using AutoCAD program. The satellite images were used as well. Results and main conclusions. It was identified that the main parameters of the Kamianske Reservoir, which is the part of the Dnipro Cascade, significantly differ from those obtained earlier, in particular, which are given in the operation rules of the Dnipro Сascade. The most important parameters of the Kamianske Reservoir to keep normal retention level (64.0 m) are as follows: water area (water surface) – 537 km2, total volume – 2636 million m3, useful storage capacity – 495 million m3. A small increase in the total volume compared to the project one is supposed to be the result of significant extraction of construction raw materials from the bottom of the reservoir. The reservoir length, depending on the ways of measuring, varies from 119 to 137 km. It was determined that the actual maximum depth of the reservoir (23 m) is significantly larger than it is indicated in reference books. The actual average depth of 5.8 m is significantly larger as well. Some parameters of the reservoir, which were previously ignored by researchers, are given as a result of the study. This parameter, in particular, is the area of the islands, which is 48.9 km2. The area of shallow water with depths less than 2 m is 152.4 km2. This area is mainly located in the upper and middle parts of the reservoir – mainly near the left bank. An important parameter is the cross section of the central reach of the reservoir, where the main movement of water is observed. Depending on the length of the reservoir, this cross-section varies in the range of 17,900–20,600 m2. The smallest cross-section is a characteristic feature of the upper part of the reservoir that causes an increase in flow velocity above 1.0 m/sec. It was concluded that the existing operation rules of the Dnipro Сascade does not correspond to the present and require the radical improvement. A mandatory requirement for the new rules is specifying the modern parameters of the reservoirs, built on the Dnipro River. Perspectives. There is need to specify the parameters of all reservoirs of the Dnipro Сascade. It is a basis for the development of new operation rules for the Dnipro Сascade.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ANALYSIS OF METHODICAL APPROACHES TO THE FORMATION OF WATER TARIFFS FOR IRRIGATION AND COMPENSATION OF COSTS FOR RECLAMATION INFRASTRUCTURE: THE EXPERIENCE OF EU COUNTRIES USING THE WATER STRESS INDEX FOR TOMATO IRRIGATION CONTROL THE NECESSITY, SCIENTIFIC AND PRACTICAL PRINCIPLES OF IMPROVING METHODS OF DRAINAGE SYSTEMS DESIGN AND CALCULATION TILLAGE EFFECTS ON SOIL FUNCTIONAL PROPERTIES: A REVIEW PROSPECTS AND PROBLEMS OF USING LOCAL WATER RESOURCES FOR IRRIGATION IN THE BASINS OF SMALL RIVERS OF THE FOREST-STEPPE OF UKRAINE
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1