Zachary J. Oliphant, J. W. Curtis, Ben Jessup, C. Schnetzler
{"title":"保持项目如期进行——新安装的振动沉箱紧急焊接修复案例研究","authors":"Zachary J. Oliphant, J. W. Curtis, Ben Jessup, C. Schnetzler","doi":"10.1061/9780784481837.002","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":313370,"journal":{"name":"Electrical Transmission and Substation Structures 2018","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Keeping the Project on Schedule—A Case Study about Emergency Weld Repairs Required on a Newly Installed Vibratory Caisson\",\"authors\":\"Zachary J. Oliphant, J. W. Curtis, Ben Jessup, C. Schnetzler\",\"doi\":\"10.1061/9780784481837.002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":313370,\"journal\":{\"name\":\"Electrical Transmission and Substation Structures 2018\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Electrical Transmission and Substation Structures 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1061/9780784481837.002\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Electrical Transmission and Substation Structures 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/9780784481837.002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}