{"title":"基于性能的可修件闭环支撑系统","authors":"M. W. Liu, Xu Zhang, W. Meng","doi":"10.1109/ICSSSM.2013.6602557","DOIUrl":null,"url":null,"abstract":"Performance-based contracting (PBL), as a novel approach, is replacing traditional service procurement practices. In this paper, we set up a closed-loop support system for repairable parts with an M/M/m/N queuing service facility and a spare parts warehouse. We derived the steady-state probability of inventory levels in warehouse and the performance measures of the support system. Under the performance-based contracting, we propose optimization policies for the support system.","PeriodicalId":354195,"journal":{"name":"2013 10th International Conference on Service Systems and Service Management","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A closed-loop support system for repairable parts based on performance\",\"authors\":\"M. W. Liu, Xu Zhang, W. Meng\",\"doi\":\"10.1109/ICSSSM.2013.6602557\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Performance-based contracting (PBL), as a novel approach, is replacing traditional service procurement practices. In this paper, we set up a closed-loop support system for repairable parts with an M/M/m/N queuing service facility and a spare parts warehouse. We derived the steady-state probability of inventory levels in warehouse and the performance measures of the support system. Under the performance-based contracting, we propose optimization policies for the support system.\",\"PeriodicalId\":354195,\"journal\":{\"name\":\"2013 10th International Conference on Service Systems and Service Management\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-07-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 10th International Conference on Service Systems and Service Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSSSM.2013.6602557\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 10th International Conference on Service Systems and Service Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSSSM.2013.6602557","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A closed-loop support system for repairable parts based on performance
Performance-based contracting (PBL), as a novel approach, is replacing traditional service procurement practices. In this paper, we set up a closed-loop support system for repairable parts with an M/M/m/N queuing service facility and a spare parts warehouse. We derived the steady-state probability of inventory levels in warehouse and the performance measures of the support system. Under the performance-based contracting, we propose optimization policies for the support system.