{"title":"分层油井同步采油井下数据通信技术研究","authors":"Yongwei Yan, Zhiguang Li, Wen Yong, Yanshan Wang, Xiaofang Wang, Wei Liu","doi":"10.1109/wceea56458.2022.00009","DOIUrl":null,"url":null,"abstract":"The geological structure of Dagang Oilfield is complex. Most of the oil wells in the block have long production intervals, many production intervals, high reservoir variation coefficient and serious interlayer interference, which affect the oil production. Separate production and mixed production is an effective lifting method to solve this problem. However, due to the geological conditions of the complex fault block reservoir in Dagang Oilfield, the influence of each layer of stratified water injection well on each layer of production oil well is still unclear. In order to determine the influence of each layer of water injection well on each layer of production oil well, find out the oil-water movement law between water injection well and each layer of oil well, the timely testing technology of slicing and simultaneous production is studied, The wireless transmission mode of intermittent power supply and downhole storage is adopted to meet the requirements of timely measurement of stratification pressure by the fixed string of 3800m and 120°C, so as to make clear the production performance of oil wells in separate layers, master the oil-water movement law of formation, and effectively guide the layered production and development of oilfield.","PeriodicalId":143024,"journal":{"name":"2022 International Conference on Wireless Communications, Electrical Engineering and Automation (WCEEA)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research of downhole data communication for simultaneous production of separate layer oil wells\",\"authors\":\"Yongwei Yan, Zhiguang Li, Wen Yong, Yanshan Wang, Xiaofang Wang, Wei Liu\",\"doi\":\"10.1109/wceea56458.2022.00009\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The geological structure of Dagang Oilfield is complex. Most of the oil wells in the block have long production intervals, many production intervals, high reservoir variation coefficient and serious interlayer interference, which affect the oil production. Separate production and mixed production is an effective lifting method to solve this problem. However, due to the geological conditions of the complex fault block reservoir in Dagang Oilfield, the influence of each layer of stratified water injection well on each layer of production oil well is still unclear. In order to determine the influence of each layer of water injection well on each layer of production oil well, find out the oil-water movement law between water injection well and each layer of oil well, the timely testing technology of slicing and simultaneous production is studied, The wireless transmission mode of intermittent power supply and downhole storage is adopted to meet the requirements of timely measurement of stratification pressure by the fixed string of 3800m and 120°C, so as to make clear the production performance of oil wells in separate layers, master the oil-water movement law of formation, and effectively guide the layered production and development of oilfield.\",\"PeriodicalId\":143024,\"journal\":{\"name\":\"2022 International Conference on Wireless Communications, Electrical Engineering and Automation (WCEEA)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 International Conference on Wireless Communications, Electrical Engineering and Automation (WCEEA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/wceea56458.2022.00009\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 International Conference on Wireless Communications, Electrical Engineering and Automation (WCEEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/wceea56458.2022.00009","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

大港油田地质构造复杂。该区块大部分油井生产段长、生产段多、储层变异系数高、层间干扰严重,影响了采油。分采混采是解决这一问题的有效举升方法。然而,由于大港油田复杂断块油藏的地质条件,各层注水井对各层生产油井的影响尚不清楚。为了确定各层注水井对各层生产油井的影响,找出注水井与各层油井之间的油水运动规律,研究了分层同时生产的及时测试技术,采用间歇供电和井下储存的无线传输方式,满足3800m、120℃固定管柱及时测量分层压力的要求;从而明确分层油井的生产动态,掌握地层油水运动规律,有效指导油田分层生产开发。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Research of downhole data communication for simultaneous production of separate layer oil wells
The geological structure of Dagang Oilfield is complex. Most of the oil wells in the block have long production intervals, many production intervals, high reservoir variation coefficient and serious interlayer interference, which affect the oil production. Separate production and mixed production is an effective lifting method to solve this problem. However, due to the geological conditions of the complex fault block reservoir in Dagang Oilfield, the influence of each layer of stratified water injection well on each layer of production oil well is still unclear. In order to determine the influence of each layer of water injection well on each layer of production oil well, find out the oil-water movement law between water injection well and each layer of oil well, the timely testing technology of slicing and simultaneous production is studied, The wireless transmission mode of intermittent power supply and downhole storage is adopted to meet the requirements of timely measurement of stratification pressure by the fixed string of 3800m and 120°C, so as to make clear the production performance of oil wells in separate layers, master the oil-water movement law of formation, and effectively guide the layered production and development of oilfield.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of the relationship between contact deformation and contact force of bearing roller based on plastic deformation Simulation of Shunt Active Power Filter Basded on Adaptive Inverse Control Research on Small Wave Power Generation Device and Key Technology Studies on the wall currents distributions of elliptical waveguide Research on the Application of BIM Technology in Construction Cost Management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1