{"title":"在Eskom实施作为辅助服务的法规,并使用Eskom内部网站进行这项服务","authors":"G. Chown, M. Coetzee","doi":"10.1109/PICA.1999.779409","DOIUrl":null,"url":null,"abstract":"This paper describes the implementation of regulation as a competitive ancillary service in Eskom. Eskom is presently forming a grid operator business, which is responsible for buying ancillary services and providing a reliable transmission network. The process of defining system performance criteria is described. The total costing of the regulation service to a single coal-fired generator was done using EPRI cost calculations. The performance of an individual generator is calculated along the guidelines of NERC Policy 10, with no allowance for over-control. This performance criterion determines regulation performance and payment to the generator. Over 750 points an downloaded every 4 seconds from the energy management system. System performance and individual unit performance are calculated using standard packages. This information is then made available in near-real time on the Eskom internal web in graphic and tabular form. This allows each generator to continually see its actual performance.","PeriodicalId":113146,"journal":{"name":"Proceedings of the 21st International Conference on Power Industry Computer Applications. Connecting Utilities. PICA 99. To the Millennium and Beyond (Cat. No.99CH36351)","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":"{\"title\":\"Implementation of regulation as an ancillary service in Eskom and the use of Eskom internal web for this service\",\"authors\":\"G. Chown, M. Coetzee\",\"doi\":\"10.1109/PICA.1999.779409\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes the implementation of regulation as a competitive ancillary service in Eskom. Eskom is presently forming a grid operator business, which is responsible for buying ancillary services and providing a reliable transmission network. The process of defining system performance criteria is described. The total costing of the regulation service to a single coal-fired generator was done using EPRI cost calculations. The performance of an individual generator is calculated along the guidelines of NERC Policy 10, with no allowance for over-control. This performance criterion determines regulation performance and payment to the generator. Over 750 points an downloaded every 4 seconds from the energy management system. System performance and individual unit performance are calculated using standard packages. This information is then made available in near-real time on the Eskom internal web in graphic and tabular form. This allows each generator to continually see its actual performance.\",\"PeriodicalId\":113146,\"journal\":{\"name\":\"Proceedings of the 21st International Conference on Power Industry Computer Applications. Connecting Utilities. PICA 99. To the Millennium and Beyond (Cat. No.99CH36351)\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-05-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"14\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 21st International Conference on Power Industry Computer Applications. Connecting Utilities. PICA 99. To the Millennium and Beyond (Cat. No.99CH36351)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PICA.1999.779409\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 21st International Conference on Power Industry Computer Applications. Connecting Utilities. PICA 99. To the Millennium and Beyond (Cat. No.99CH36351)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICA.1999.779409","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14

摘要

本文描述了Eskom作为竞争性辅助服务的监管实施。Eskom目前正在组建一个电网运营商业务,负责购买辅助服务和提供可靠的传输网络。描述了定义系统性能标准的过程。使用EPRI成本计算完成了单个燃煤发电机的监管服务的总成本。单个发电机的性能是根据NERC政策10的指导方针计算的,不允许过度控制。这一性能标准决定了调节性能和对发电机的支付。每4秒从能量管理系统下载超过750分。系统性能和单个单元性能使用标准软件包计算。然后,这些信息以图形和表格的形式在Eskom内部网络上以近乎实时的方式提供。这允许每个生成器不断地查看其实际性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Implementation of regulation as an ancillary service in Eskom and the use of Eskom internal web for this service
This paper describes the implementation of regulation as a competitive ancillary service in Eskom. Eskom is presently forming a grid operator business, which is responsible for buying ancillary services and providing a reliable transmission network. The process of defining system performance criteria is described. The total costing of the regulation service to a single coal-fired generator was done using EPRI cost calculations. The performance of an individual generator is calculated along the guidelines of NERC Policy 10, with no allowance for over-control. This performance criterion determines regulation performance and payment to the generator. Over 750 points an downloaded every 4 seconds from the energy management system. System performance and individual unit performance are calculated using standard packages. This information is then made available in near-real time on the Eskom internal web in graphic and tabular form. This allows each generator to continually see its actual performance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Security Constrained Unit Commitment for open markets Critical evaluation of direct and iterative methods for solving Ax=b systems in power flow calculations and contingency analysis Testing equality constraint hypotheses in weighted least squares state estimators Two novel screening methods to decide network configurations to maintain voltage stability using sensitivity analysis Bidding strategies in electricity markets
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1