考虑负荷需求增加的电力系统风险不确定性

M. M. Othman, S. R. Kasim, N. A. Salim, I. Musirin
{"title":"考虑负荷需求增加的电力系统风险不确定性","authors":"M. M. Othman, S. R. Kasim, N. A. Salim, I. Musirin","doi":"10.1109/PEOCO.2012.6230907","DOIUrl":null,"url":null,"abstract":"Disturbance to the electric power system often occurs with different impact. Those power system disturbances cannot be avoided but it can be mitigated by having a premeditated action which refers to the risk assessment. This paper presents the bootstrap technique that used to assess the risk of a power system at every uncertainty level of system states and load variations. In addition, the risk based uncertainty assessment is determined when the load is increased by 20%, 40% and 60% from the base case condition. The effectiveness of bootstrap technique in risk based uncertainty assessment is tested on a case study of 24-bus IEEE Reliability Test System (RTS).","PeriodicalId":138236,"journal":{"name":"2012 IEEE International Power Engineering and Optimization Conference Melaka, Malaysia","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-06-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Risk based uncertainty (RibUt) of power system considering the increased of load demand\",\"authors\":\"M. M. Othman, S. R. Kasim, N. A. Salim, I. Musirin\",\"doi\":\"10.1109/PEOCO.2012.6230907\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Disturbance to the electric power system often occurs with different impact. Those power system disturbances cannot be avoided but it can be mitigated by having a premeditated action which refers to the risk assessment. This paper presents the bootstrap technique that used to assess the risk of a power system at every uncertainty level of system states and load variations. In addition, the risk based uncertainty assessment is determined when the load is increased by 20%, 40% and 60% from the base case condition. The effectiveness of bootstrap technique in risk based uncertainty assessment is tested on a case study of 24-bus IEEE Reliability Test System (RTS).\",\"PeriodicalId\":138236,\"journal\":{\"name\":\"2012 IEEE International Power Engineering and Optimization Conference Melaka, Malaysia\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-06-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 IEEE International Power Engineering and Optimization Conference Melaka, Malaysia\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PEOCO.2012.6230907\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE International Power Engineering and Optimization Conference Melaka, Malaysia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PEOCO.2012.6230907","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

电力系统经常受到干扰,影响程度不一。这些电力系统的干扰是无法避免的,但可以通过有预谋的行动来减轻,这涉及到风险评估。本文介绍了一种用于评估电力系统在系统状态和负荷变化的各个不确定水平上的风险的自举技术。此外,在负荷比基准情况增加20%、40%和60%时,确定了基于风险的不确定性评估。以24总线IEEE可靠性测试系统(RTS)为例,验证了自举技术在基于风险的不确定性评估中的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Risk based uncertainty (RibUt) of power system considering the increased of load demand
Disturbance to the electric power system often occurs with different impact. Those power system disturbances cannot be avoided but it can be mitigated by having a premeditated action which refers to the risk assessment. This paper presents the bootstrap technique that used to assess the risk of a power system at every uncertainty level of system states and load variations. In addition, the risk based uncertainty assessment is determined when the load is increased by 20%, 40% and 60% from the base case condition. The effectiveness of bootstrap technique in risk based uncertainty assessment is tested on a case study of 24-bus IEEE Reliability Test System (RTS).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Impact of a 200 MW concentrated receiver solar power plant on steady-state and transient performances of Oman transmission system Evaluation of the effectiveness of voltage stability indices on different loadings Unit commitment in electrical power system-a literature review Power optimization for a small-sized stall-regulated variable-speed wind turbine Novel reduced parts one-line uninterruptible power supply
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1