海外成功建设项目风险管理计划与程序的构成与应用研究——基于英国PRINCE2方法论

Sin-Gil Kang, Seung-Chul Kim
{"title":"海外成功建设项目风险管理计划与程序的构成与应用研究——基于英国PRINCE2方法论","authors":"Sin-Gil Kang, Seung-Chul Kim","doi":"10.6106/KJCEM.2016.17.1.048","DOIUrl":null,"url":null,"abstract":"Risk management is an important element for successful management of overseas construction projects. This study reports a case study in which we proposed a risk management planning and procedure for plant construction which can be applied throughout the project life cycle. We analyzed the risk management practices of Korean construction companies by applying the concept of the PRINCE2 method developed in the UK, and proposed a risk management planning and procedure with organizational structure and working process. The suggested risk management planning and procedure was applied to an overseas plant construction project, and produced good results. It is believed that the procedure suggested here can also be aplied to other companies to enhance the competency in the global construction market.","PeriodicalId":220018,"journal":{"name":"Korean Journal of Construction Engineering and Management","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-01-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK -\",\"authors\":\"Sin-Gil Kang, Seung-Chul Kim\",\"doi\":\"10.6106/KJCEM.2016.17.1.048\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Risk management is an important element for successful management of overseas construction projects. This study reports a case study in which we proposed a risk management planning and procedure for plant construction which can be applied throughout the project life cycle. We analyzed the risk management practices of Korean construction companies by applying the concept of the PRINCE2 method developed in the UK, and proposed a risk management planning and procedure with organizational structure and working process. The suggested risk management planning and procedure was applied to an overseas plant construction project, and produced good results. It is believed that the procedure suggested here can also be aplied to other companies to enhance the competency in the global construction market.\",\"PeriodicalId\":220018,\"journal\":{\"name\":\"Korean Journal of Construction Engineering and Management\",\"volume\":\"30 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-01-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Korean Journal of Construction Engineering and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.6106/KJCEM.2016.17.1.048\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Korean Journal of Construction Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.6106/KJCEM.2016.17.1.048","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

风险管理是海外建设项目成功管理的重要因素。本研究报告了一个案例研究,在这个案例研究中,我们提出了一个可以在整个项目生命周期中应用的工厂建设风险管理计划和程序。我们运用英国PRINCE2方法的概念,分析了韩国建筑企业的风险管理实践,提出了具有组织结构和工作流程的风险管理计划和程序。建议的风险管理计划和程序应用于一个海外工厂建设项目,并取得了良好的效果。相信本文所建议的程序也可以应用于其他公司,以提高在全球建筑市场上的竞争力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK -
Risk management is an important element for successful management of overseas construction projects. This study reports a case study in which we proposed a risk management planning and procedure for plant construction which can be applied throughout the project life cycle. We analyzed the risk management practices of Korean construction companies by applying the concept of the PRINCE2 method developed in the UK, and proposed a risk management planning and procedure with organizational structure and working process. The suggested risk management planning and procedure was applied to an overseas plant construction project, and produced good results. It is believed that the procedure suggested here can also be aplied to other companies to enhance the competency in the global construction market.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
BIM 기술 융·복합 수준 분석을 위한 특허 정보 활용 방안 Analysis of Leasing Decision Determinants by the Store Size and Lend-Lease Perspectives for Mix-Used Shopping Mall Development Seamless Superimposition Technique of Virtual Objects for AR System of Excavator Based on Image Processing Review of Real Options Analysis for Renewable Energy Projects Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1