Kui Wang, Bu-han Zhang, Xiaoshan Wu, Jiajun Zhai, Wen Shao, Y. Duan
{"title":"风电综合系统多时间尺度协调调度","authors":"Kui Wang, Bu-han Zhang, Xiaoshan Wu, Jiajun Zhai, Wen Shao, Y. Duan","doi":"10.1109/ISGT-ASIA.2012.6303174","DOIUrl":null,"url":null,"abstract":"Coordination method between long-term and short-time generation scheduling of wind power integrated system are proposed. Long-term scheduling mainly solves unit maintenance scheduling and energy allocation among weeks, and short-term scheduling decides unit commitment and hourly power output. In order to cope with the high uncertainty of wind power and load demand, dynamic rolling generation scheduling are implemented weekly based on the updated load and wind power prediction results. A modified IEEE 118-bus system is applied to test the proposed model.","PeriodicalId":330758,"journal":{"name":"IEEE PES Innovative Smart Grid Technologies","volume":"199 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":"{\"title\":\"Multi-time scales coordination scheduling of wind power integrated system\",\"authors\":\"Kui Wang, Bu-han Zhang, Xiaoshan Wu, Jiajun Zhai, Wen Shao, Y. Duan\",\"doi\":\"10.1109/ISGT-ASIA.2012.6303174\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Coordination method between long-term and short-time generation scheduling of wind power integrated system are proposed. Long-term scheduling mainly solves unit maintenance scheduling and energy allocation among weeks, and short-term scheduling decides unit commitment and hourly power output. In order to cope with the high uncertainty of wind power and load demand, dynamic rolling generation scheduling are implemented weekly based on the updated load and wind power prediction results. A modified IEEE 118-bus system is applied to test the proposed model.\",\"PeriodicalId\":330758,\"journal\":{\"name\":\"IEEE PES Innovative Smart Grid Technologies\",\"volume\":\"199 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE PES Innovative Smart Grid Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGT-ASIA.2012.6303174\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE PES Innovative Smart Grid Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGT-ASIA.2012.6303174","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Multi-time scales coordination scheduling of wind power integrated system
Coordination method between long-term and short-time generation scheduling of wind power integrated system are proposed. Long-term scheduling mainly solves unit maintenance scheduling and energy allocation among weeks, and short-term scheduling decides unit commitment and hourly power output. In order to cope with the high uncertainty of wind power and load demand, dynamic rolling generation scheduling are implemented weekly based on the updated load and wind power prediction results. A modified IEEE 118-bus system is applied to test the proposed model.