{"title":"日本的交通拥堵管理","authors":"M. Shinkai","doi":"10.1109/CIGRE.2005.1532721","DOIUrl":null,"url":null,"abstract":"There are 10 regional Vertical Integrated Utilities in Japan, and these operate the individual regional systems. The tile-lines between adjacent utilities are used supplementary. On the other hand, Japan has stepped into next stage in its liberalization, and since April 2005 the customers who consume about 60% of total sales can choose their suppliers. There are two noteworthy elements in Japanese liberalization: a neutral organization and a wholesale power exchange. The neutral organization is unique, neither a regulator nor a system operator. The players in Japan's liberalization scheme discussed and published rules for tie-line use. There are two principles for tie-line use in Japan, upon which congestion management is based: \"first come, first served,\" and \"use it or lose it.\" The grid users do not need to pay for tie-line capacity allocation, but they need to pay a charge for the certain change of their plans posted to prevent intentional overestimates of capacity needs","PeriodicalId":414346,"journal":{"name":"International Symposium CIGRE/IEEE PES, 2005.","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-11-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Congestion management in Japan\",\"authors\":\"M. Shinkai\",\"doi\":\"10.1109/CIGRE.2005.1532721\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"There are 10 regional Vertical Integrated Utilities in Japan, and these operate the individual regional systems. The tile-lines between adjacent utilities are used supplementary. On the other hand, Japan has stepped into next stage in its liberalization, and since April 2005 the customers who consume about 60% of total sales can choose their suppliers. There are two noteworthy elements in Japanese liberalization: a neutral organization and a wholesale power exchange. The neutral organization is unique, neither a regulator nor a system operator. The players in Japan's liberalization scheme discussed and published rules for tie-line use. There are two principles for tie-line use in Japan, upon which congestion management is based: \\\"first come, first served,\\\" and \\\"use it or lose it.\\\" The grid users do not need to pay for tie-line capacity allocation, but they need to pay a charge for the certain change of their plans posted to prevent intentional overestimates of capacity needs\",\"PeriodicalId\":414346,\"journal\":{\"name\":\"International Symposium CIGRE/IEEE PES, 2005.\",\"volume\":\"50 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-11-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Symposium CIGRE/IEEE PES, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CIGRE.2005.1532721\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Symposium CIGRE/IEEE PES, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIGRE.2005.1532721","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

日本有10个地区垂直综合公用事业公司,它们运营着单独的地区系统。相邻公用设施之间的瓷砖线是补充使用的。另一方面,日本已经进入了自由化的下一个阶段,从2005年4月开始,消费总销售额约60%的客户可以选择他们的供应商。日本的自由化有两个值得注意的因素:中立组织和批发电力交换。中立组织是独特的,既不是监管者也不是系统操作员。日本自由化计划的参与者讨论并公布了领带使用规则。在日本,交通拥堵管理基于两个原则:“先到先得”和“要么用,要么丢”。电网用户不需要为联络线容量分配付费,但他们需要为公布的计划的某些更改付费,以防止故意高估容量需求
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Congestion management in Japan
There are 10 regional Vertical Integrated Utilities in Japan, and these operate the individual regional systems. The tile-lines between adjacent utilities are used supplementary. On the other hand, Japan has stepped into next stage in its liberalization, and since April 2005 the customers who consume about 60% of total sales can choose their suppliers. There are two noteworthy elements in Japanese liberalization: a neutral organization and a wholesale power exchange. The neutral organization is unique, neither a regulator nor a system operator. The players in Japan's liberalization scheme discussed and published rules for tie-line use. There are two principles for tie-line use in Japan, upon which congestion management is based: "first come, first served," and "use it or lose it." The grid users do not need to pay for tie-line capacity allocation, but they need to pay a charge for the certain change of their plans posted to prevent intentional overestimates of capacity needs
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Practicability of SPS coordination in market environment for impending UCTE-IPS/UPS interconnection Coordinated auction project in Central Europe Congestion management: The system operators challenge to balance transmission transfer capacity with an acceptable security level Congestion management in Japan Financial impacts of congestion relief measures under different congestion management schemes
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1