{"title":"工业废水处理装置的性能研究","authors":"M. Nafees, Asim Nawab, Wisal Shah","doi":"10.25211/JEAS.V34I1.2209","DOIUrl":null,"url":null,"abstract":"The present study was conducted to assess the performance of the treatment plant installed on the main effluent drain of Hayatabad Industrial Estate (HIE) for reducing pollution load. The objective of the study was to know about the pollution removal efficiency and suggest changes in the existent treatment plant, if required. For this purpose, samples were taken from the effluent, before and after it went through the treatment plant. It was found that the treatment was not sufficient to remove various physical and chemical parameters including Suspended solids (SS), Biological Oxygen Demand (BOD), Chemical Oxygen Demand (COD) and Sulfide (S) in order to comply with Pakistan National Environmental Quality Standards (Pak-NEQS).The collected samples were then treated in the laboratory in order to identify and suggest suitable coagulant. For this purpose three different treatments .i.e. Lime, Alum and Alum+Lime were applied. The optimum doses identified were 25, 35 and 26:13 ml respectively. The settling time was 25, 35 and 20 minutes respectively for lime, alum and alum+lime. The results revealed that the combine treatment (Alum + Lime) effectively removed suspended load up to 90%, along with 82% BOD, and 80% COD respectively. Therefore, it was concluded that the installed small scale treatment plant is not enough in its present form and needs to be upgraded by adding a coagulation step.","PeriodicalId":167225,"journal":{"name":"Journal of Engineering and Applied Sciences , University of Engineering and Technology, Peshawar","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"STUDY ON THE PERFORMANCE OF WASTEWATER TREATMENT PLANT DESIGNED FOR INDUSTRIAL EFFLUENTS\",\"authors\":\"M. Nafees, Asim Nawab, Wisal Shah\",\"doi\":\"10.25211/JEAS.V34I1.2209\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The present study was conducted to assess the performance of the treatment plant installed on the main effluent drain of Hayatabad Industrial Estate (HIE) for reducing pollution load. The objective of the study was to know about the pollution removal efficiency and suggest changes in the existent treatment plant, if required. For this purpose, samples were taken from the effluent, before and after it went through the treatment plant. It was found that the treatment was not sufficient to remove various physical and chemical parameters including Suspended solids (SS), Biological Oxygen Demand (BOD), Chemical Oxygen Demand (COD) and Sulfide (S) in order to comply with Pakistan National Environmental Quality Standards (Pak-NEQS).The collected samples were then treated in the laboratory in order to identify and suggest suitable coagulant. For this purpose three different treatments .i.e. Lime, Alum and Alum+Lime were applied. The optimum doses identified were 25, 35 and 26:13 ml respectively. The settling time was 25, 35 and 20 minutes respectively for lime, alum and alum+lime. The results revealed that the combine treatment (Alum + Lime) effectively removed suspended load up to 90%, along with 82% BOD, and 80% COD respectively. Therefore, it was concluded that the installed small scale treatment plant is not enough in its present form and needs to be upgraded by adding a coagulation step.\",\"PeriodicalId\":167225,\"journal\":{\"name\":\"Journal of Engineering and Applied Sciences , University of Engineering and Technology, Peshawar\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering and Applied Sciences , University of Engineering and Technology, Peshawar\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25211/JEAS.V34I1.2209\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering and Applied Sciences , University of Engineering and Technology, Peshawar","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25211/JEAS.V34I1.2209","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本研究旨在评估安装在Hayatabad工业园区(HIE)主要污水排放道上的处理厂在减少污染负荷方面的性能。研究的目的是了解污染去除效率,并建议在现有的处理厂,如果需要的变化。为此目的,在污水通过处理厂之前和之后,从污水中取样。结果发现,该处理不足以去除悬浮物(SS)、生物需氧量(BOD)、化学需氧量(COD)和硫化物(S)等各种物理和化学参数,以符合巴基斯坦国家环境质量标准(Pak-NEQS)。收集的样品然后在实验室处理,以确定和建议合适的凝血剂。为此,有三种不同的处理方法,即:采用石灰、明矾和明矾+石灰。确定的最佳剂量分别为25,35和26:13 ml。石灰、明矾和明矾+石灰的沉降时间分别为25、35和20分钟。结果表明,明矾+石灰联合处理可有效去除悬浮负荷达90%,COD去除率分别为82%和80%。因此,结论是,目前安装的小型污水处理厂是不够的,需要通过增加混凝步骤进行升级。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
STUDY ON THE PERFORMANCE OF WASTEWATER TREATMENT PLANT DESIGNED FOR INDUSTRIAL EFFLUENTS
The present study was conducted to assess the performance of the treatment plant installed on the main effluent drain of Hayatabad Industrial Estate (HIE) for reducing pollution load. The objective of the study was to know about the pollution removal efficiency and suggest changes in the existent treatment plant, if required. For this purpose, samples were taken from the effluent, before and after it went through the treatment plant. It was found that the treatment was not sufficient to remove various physical and chemical parameters including Suspended solids (SS), Biological Oxygen Demand (BOD), Chemical Oxygen Demand (COD) and Sulfide (S) in order to comply with Pakistan National Environmental Quality Standards (Pak-NEQS).The collected samples were then treated in the laboratory in order to identify and suggest suitable coagulant. For this purpose three different treatments .i.e. Lime, Alum and Alum+Lime were applied. The optimum doses identified were 25, 35 and 26:13 ml respectively. The settling time was 25, 35 and 20 minutes respectively for lime, alum and alum+lime. The results revealed that the combine treatment (Alum + Lime) effectively removed suspended load up to 90%, along with 82% BOD, and 80% COD respectively. Therefore, it was concluded that the installed small scale treatment plant is not enough in its present form and needs to be upgraded by adding a coagulation step.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PREDICTING FUTURE TEMPERATURE AND PRECIPITATION OVER PAKISTAN IN THE 21ST CENTURY SEISMIC DESIGN CHARACTERIZATION OF RC SPECIAL MOMENT RESISTING FRAMES IN PAKISTAN-FIELD SURVEY TO LABORATORY EXPERIMENTS IRRIGATION EFFICIENCIES POTENTIAL UNDER SURFACE IRRIGATED FARMS IN PAKISTAN Variation in Citation Based Fractional Counting of Authorship EVALUATION OF FLEXURAL RIGIDITY AND ABRASION RESISTANCE OF POST AND META-FINISHED PIGMENT DYED P/C FABRICS
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1