连续油管气举:巴基斯坦南部开采死井的创新解决方案

Aizaz Khalid, N. Molero, Ghassan Hassan, Eric Lovie, Rao Shafin Ali Khan
{"title":"连续油管气举:巴基斯坦南部开采死井的创新解决方案","authors":"Aizaz Khalid, N. Molero, Ghassan Hassan, Eric Lovie, Rao Shafin Ali Khan","doi":"10.2523/19930-abstract","DOIUrl":null,"url":null,"abstract":"\n In southern Pakistan, most wells in mature fields do not flow naturally and require delivery of supplemental energy into the wellbore through an artificial lift system. The existing portfolio of techniques, however, faces technical and economic challenges. Operators have tried numerous methods of deliquification such as soap injection, jet pumps, electrical submersible pumps, and conventional gas lift (GL). Those solutions differ in methodology and efficiency, but they unfortunately have failed either technically or economically in Pakistan.\n Because reviving dead wells is key to maximizing production with the most efficient and cost-effective method in Pakistan, a detailed screening of candidate wells was carried out to identify innovative artificial lift solutions. The deployment of GL valves using coiled tubing (CT) soon emerged as the best option, because it offered the highest returns in a cost-benefit analysis. Coiled tubing gas lift (CTGL) is a rigless solution that enables setting GL valves at the required depth, during any stage of a well life. It allows gas to be injected through CT with production through the CT-to-tubing annulus. This technology is also retrievable and replaceable when needed.\n Two pilot wells, that had been shut in since 2015, were selected from four shortlisted candidates through nodal analysis. Each system consisted of one CT string with multiple stations of unloading and orifice valves, spaced out at depths engineered to maximize each well’s productivity. In addition to a GL valve, each station included two CT external connectors and one self-aligning connector, which enabled efficient and safe connection between both CT ends during the deployment of the CTGL station.\n Additionally, specific CT pressure control equipment and wellhead adapters were used to secure and hang the CT string in the production tree and provide connection with the gas injection facilities at the surface. The first installation was conducted in a vertical well originally completed 4 1/2-in. monobore, deploying 1 1/2-in. CT string with four CTGL stations. The second installation was performed with 1 1/4-in. CT and five CTGL stations in a well originally completed with 7-in. liner and 2 7/8-in. production tubing. The wells were commissioned using existing surface infrastructure and were unloaded smoothly until the production stabilized at optimum rates near 420 B/D and 325 B/D respectively.\n This innovative artificial lift technique represents an effective and economical solution to restart production in mature fields where conventional artificial lift methods challenge well economics. This approach greatly rests on a thorough candidate selection process. The design and installation of two new CTGL systems was a first in the Middle East region and helped identify numerous best practices and lessons learned, which will speed up implementation of the methodology in other parts of the world.","PeriodicalId":393755,"journal":{"name":"Day 1 Mon, January 13, 2020","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-01-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Coiled Tubing Gas Lift: An Innovative Solution for Reviving Dead Wells in Southern Pakistan\",\"authors\":\"Aizaz Khalid, N. Molero, Ghassan Hassan, Eric Lovie, Rao Shafin Ali Khan\",\"doi\":\"10.2523/19930-abstract\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n In southern Pakistan, most wells in mature fields do not flow naturally and require delivery of supplemental energy into the wellbore through an artificial lift system. The existing portfolio of techniques, however, faces technical and economic challenges. Operators have tried numerous methods of deliquification such as soap injection, jet pumps, electrical submersible pumps, and conventional gas lift (GL). Those solutions differ in methodology and efficiency, but they unfortunately have failed either technically or economically in Pakistan.\\n Because reviving dead wells is key to maximizing production with the most efficient and cost-effective method in Pakistan, a detailed screening of candidate wells was carried out to identify innovative artificial lift solutions. The deployment of GL valves using coiled tubing (CT) soon emerged as the best option, because it offered the highest returns in a cost-benefit analysis. Coiled tubing gas lift (CTGL) is a rigless solution that enables setting GL valves at the required depth, during any stage of a well life. It allows gas to be injected through CT with production through the CT-to-tubing annulus. This technology is also retrievable and replaceable when needed.\\n Two pilot wells, that had been shut in since 2015, were selected from four shortlisted candidates through nodal analysis. Each system consisted of one CT string with multiple stations of unloading and orifice valves, spaced out at depths engineered to maximize each well’s productivity. In addition to a GL valve, each station included two CT external connectors and one self-aligning connector, which enabled efficient and safe connection between both CT ends during the deployment of the CTGL station.\\n Additionally, specific CT pressure control equipment and wellhead adapters were used to secure and hang the CT string in the production tree and provide connection with the gas injection facilities at the surface. The first installation was conducted in a vertical well originally completed 4 1/2-in. monobore, deploying 1 1/2-in. CT string with four CTGL stations. The second installation was performed with 1 1/4-in. CT and five CTGL stations in a well originally completed with 7-in. liner and 2 7/8-in. production tubing. The wells were commissioned using existing surface infrastructure and were unloaded smoothly until the production stabilized at optimum rates near 420 B/D and 325 B/D respectively.\\n This innovative artificial lift technique represents an effective and economical solution to restart production in mature fields where conventional artificial lift methods challenge well economics. This approach greatly rests on a thorough candidate selection process. The design and installation of two new CTGL systems was a first in the Middle East region and helped identify numerous best practices and lessons learned, which will speed up implementation of the methodology in other parts of the world.\",\"PeriodicalId\":393755,\"journal\":{\"name\":\"Day 1 Mon, January 13, 2020\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Mon, January 13, 2020\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2523/19930-abstract\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, January 13, 2020","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/19930-abstract","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在巴基斯坦南部,成熟油田的大多数井都不是自然流动的,需要通过人工举升系统将补充能量输送到井筒中。然而,现有的技术组合面临着技术和经济方面的挑战。作业者已经尝试了许多液化方法,如皂液注入、喷射泵、电潜泵和常规气举(GL)。这些解决办法在方法和效率上各不相同,但不幸的是,它们在巴基斯坦无论是技术上还是经济上都失败了。在巴基斯坦,利用最高效、最具成本效益的方法恢复死井是实现产量最大化的关键,因此对候选井进行了详细筛选,以确定创新的人工举升解决方案。使用连续油管(CT)部署GL阀很快成为最佳选择,因为从成本效益分析来看,它提供了最高的回报。连续油管气举(CTGL)是一种无需钻机的解决方案,可以在井寿命的任何阶段将GL阀设置在所需的深度。它允许气体通过连续油管注入,并通过CT到油管环空进行生产。该技术在需要时也是可回收和可替换的。通过节点分析,从4口候选井中选出了自2015年以来关闭的2口试验井。每个系统由一个连续油管串组成,有多个卸载站和孔板阀,在设计的深度上间隔,以最大限度地提高每口井的产能。除了GL阀外,每个站还包括两个连续油管外部连接器和一个自对准连接器,在CTGL站部署期间,可以在连续油管两端之间实现高效、安全的连接。此外,使用特定的连续油管压力控制设备和井口适配器将连续油管管柱固定并悬挂在采油树上,并与地面注气设施连接。第一次安装是在一口原本完成的4 1/2-in直井中进行的。Monobore,部署1 1/2英寸。连续油管有四个CTGL站。第二次安装使用了1 1/4-in。在一口最初使用7寸完井的井中,使用了CT和5个CTGL站。尾管和2 7/8-in生产油管。这两口井使用现有的地面基础设施进行调试,并顺利卸载,直到产量分别稳定在420桶/天和325桶/天左右的最佳速率。这种创新的人工举升技术为成熟油田的重新生产提供了一种有效且经济的解决方案,传统的人工举升方法对油井的经济效益提出了挑战。这种方法在很大程度上依赖于一个彻底的候选人选拔过程。两个新的CTGL系统的设计和安装是中东地区的第一个,并有助于确定许多最佳做法和吸取的经验教训,这将加速世界其他地区实施该方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Coiled Tubing Gas Lift: An Innovative Solution for Reviving Dead Wells in Southern Pakistan
In southern Pakistan, most wells in mature fields do not flow naturally and require delivery of supplemental energy into the wellbore through an artificial lift system. The existing portfolio of techniques, however, faces technical and economic challenges. Operators have tried numerous methods of deliquification such as soap injection, jet pumps, electrical submersible pumps, and conventional gas lift (GL). Those solutions differ in methodology and efficiency, but they unfortunately have failed either technically or economically in Pakistan. Because reviving dead wells is key to maximizing production with the most efficient and cost-effective method in Pakistan, a detailed screening of candidate wells was carried out to identify innovative artificial lift solutions. The deployment of GL valves using coiled tubing (CT) soon emerged as the best option, because it offered the highest returns in a cost-benefit analysis. Coiled tubing gas lift (CTGL) is a rigless solution that enables setting GL valves at the required depth, during any stage of a well life. It allows gas to be injected through CT with production through the CT-to-tubing annulus. This technology is also retrievable and replaceable when needed. Two pilot wells, that had been shut in since 2015, were selected from four shortlisted candidates through nodal analysis. Each system consisted of one CT string with multiple stations of unloading and orifice valves, spaced out at depths engineered to maximize each well’s productivity. In addition to a GL valve, each station included two CT external connectors and one self-aligning connector, which enabled efficient and safe connection between both CT ends during the deployment of the CTGL station. Additionally, specific CT pressure control equipment and wellhead adapters were used to secure and hang the CT string in the production tree and provide connection with the gas injection facilities at the surface. The first installation was conducted in a vertical well originally completed 4 1/2-in. monobore, deploying 1 1/2-in. CT string with four CTGL stations. The second installation was performed with 1 1/4-in. CT and five CTGL stations in a well originally completed with 7-in. liner and 2 7/8-in. production tubing. The wells were commissioned using existing surface infrastructure and were unloaded smoothly until the production stabilized at optimum rates near 420 B/D and 325 B/D respectively. This innovative artificial lift technique represents an effective and economical solution to restart production in mature fields where conventional artificial lift methods challenge well economics. This approach greatly rests on a thorough candidate selection process. The design and installation of two new CTGL systems was a first in the Middle East region and helped identify numerous best practices and lessons learned, which will speed up implementation of the methodology in other parts of the world.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Prediction of Liquid Loading in Gas Condensate and Volatile Oil Wells for Unconventional Reservoirs Determining NOx And SOx Emissions by Soft Sensor Coiled Tubing Gas Lift: An Innovative Solution for Reviving Dead Wells in Southern Pakistan A Novel, Cost Effective and Easily Scaled Solution for On-Site Treatment of Oily Wastes Kinetics of Breaking of a Sulfobetaine Viscoelastic Surfactant Gel in the Presence of Model Oils
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1