{"title":"NJI和BMC电机控制中心的改造和翻新","authors":"J.C. Pearson, D. Pandya","doi":"10.1109/EEIC.2005.1566292","DOIUrl":null,"url":null,"abstract":"This paper provides a case study of considering an economical evaluation comparing a traditional approach of completely demolishing old electrical MCCs equipment versus investigating and replacing only the malfunctioning components in the MCC. The example below illustrates how a thorough investigation of existing electrical equipment can entirely alter previous planning decisions and have a drastic impact on cost estimates. A case study detailing the revitalization of 276, thirty three year old Motor Control Center (MCC) buckets, improved safety and security for our employees and facility equipment, extended overall life of the motor control center (MCCs), enhanced skills of our employees, and saved more than one million dollars for the US Postal facility-at Jersey City, NJ","PeriodicalId":267510,"journal":{"name":"Proceedings Electrical Insulation Conference and Electrical Manufacturing Expo, 2005.","volume":"282 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Revitalizing and refurbishment of motor control centers AT NJI & BMC\",\"authors\":\"J.C. Pearson, D. Pandya\",\"doi\":\"10.1109/EEIC.2005.1566292\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper provides a case study of considering an economical evaluation comparing a traditional approach of completely demolishing old electrical MCCs equipment versus investigating and replacing only the malfunctioning components in the MCC. The example below illustrates how a thorough investigation of existing electrical equipment can entirely alter previous planning decisions and have a drastic impact on cost estimates. A case study detailing the revitalization of 276, thirty three year old Motor Control Center (MCC) buckets, improved safety and security for our employees and facility equipment, extended overall life of the motor control center (MCCs), enhanced skills of our employees, and saved more than one million dollars for the US Postal facility-at Jersey City, NJ\",\"PeriodicalId\":267510,\"journal\":{\"name\":\"Proceedings Electrical Insulation Conference and Electrical Manufacturing Expo, 2005.\",\"volume\":\"282 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings Electrical Insulation Conference and Electrical Manufacturing Expo, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEIC.2005.1566292\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings Electrical Insulation Conference and Electrical Manufacturing Expo, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEIC.2005.1566292","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Revitalizing and refurbishment of motor control centers AT NJI & BMC
This paper provides a case study of considering an economical evaluation comparing a traditional approach of completely demolishing old electrical MCCs equipment versus investigating and replacing only the malfunctioning components in the MCC. The example below illustrates how a thorough investigation of existing electrical equipment can entirely alter previous planning decisions and have a drastic impact on cost estimates. A case study detailing the revitalization of 276, thirty three year old Motor Control Center (MCC) buckets, improved safety and security for our employees and facility equipment, extended overall life of the motor control center (MCCs), enhanced skills of our employees, and saved more than one million dollars for the US Postal facility-at Jersey City, NJ