{"title":"基于多元线性回归和Lingo多目标规划模型的最优配电方案决策模型","authors":"Xinyu Zhang, Qiushi Wang, Hongru Zhou, Zhenyao Shen","doi":"10.1145/3544109.3544158","DOIUrl":null,"url":null,"abstract":"In order to overcome the difficulties in the formulation and decision-making of power distribution schemes, this paper proposes a novel decision-making model for optimal power distribution schemes based on multiple linear regression and Lingo multi-objective programming models. From the perspective of multiple linear regression and Lingo’s multi-objective programming models, the decision-making model follows the \"safety first\" principle and the principle of minimum cost in the organization, dispatch, and distribution of power grid companies. And according to the load forecast and transaction rules, the optimal power distribution scheme can be designed for the power personnel. The research results show that the difference in load demand leads to different transmission congestion principles and cost settlement methods. Therefore, this paper divides the forecast load demand into three intervals (0,982.9136], (982.9136,1094.500], (1094.500,+ ∞ ], the simulation test was carried out. When the forecasted load demand for the next period is 984.2MV and 1052.8MV, LINGO and MATLAB software are used to solve the deployment mentioned above plan model according to the transmission congestion management principle to obtain the adjusted units. And find the blocking cost is 18232.2 yuan and 22506 yuan.","PeriodicalId":187064,"journal":{"name":"Proceedings of the 3rd Asia-Pacific Conference on Image Processing, Electronics and Computers","volume":"442 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Decision-making Model of Optimal Power Distribution Scheme Based on Multiple Linear Regression and Lingo Multi-objective Programming Model\",\"authors\":\"Xinyu Zhang, Qiushi Wang, Hongru Zhou, Zhenyao Shen\",\"doi\":\"10.1145/3544109.3544158\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to overcome the difficulties in the formulation and decision-making of power distribution schemes, this paper proposes a novel decision-making model for optimal power distribution schemes based on multiple linear regression and Lingo multi-objective programming models. From the perspective of multiple linear regression and Lingo’s multi-objective programming models, the decision-making model follows the \\\"safety first\\\" principle and the principle of minimum cost in the organization, dispatch, and distribution of power grid companies. And according to the load forecast and transaction rules, the optimal power distribution scheme can be designed for the power personnel. The research results show that the difference in load demand leads to different transmission congestion principles and cost settlement methods. Therefore, this paper divides the forecast load demand into three intervals (0,982.9136], (982.9136,1094.500], (1094.500,+ ∞ ], the simulation test was carried out. When the forecasted load demand for the next period is 984.2MV and 1052.8MV, LINGO and MATLAB software are used to solve the deployment mentioned above plan model according to the transmission congestion management principle to obtain the adjusted units. And find the blocking cost is 18232.2 yuan and 22506 yuan.\",\"PeriodicalId\":187064,\"journal\":{\"name\":\"Proceedings of the 3rd Asia-Pacific Conference on Image Processing, Electronics and Computers\",\"volume\":\"442 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 3rd Asia-Pacific Conference on Image Processing, Electronics and Computers\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3544109.3544158\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 3rd Asia-Pacific Conference on Image Processing, Electronics and Computers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3544109.3544158","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

为了克服配电方案制定和决策中的困难,本文提出了一种基于多元线性回归和Lingo多目标规划模型的最优配电方案决策模型。从多元线性回归和Lingo多目标规划模型的角度出发,该决策模型遵循“安全第一”原则和电网公司组织、调度、分配成本最小原则。根据负荷预测和交易规则,为电力人员设计最优配电方案。研究结果表明,不同的负荷需求导致不同的输电拥塞原则和费用结算方法。因此,本文将预测负荷需求划分为[0,982.9136]、[982.9136,1094.500]、[1094.500,+∞]三个区间,进行仿真试验。当下一时段的预测负荷需求分别为984.2MV和1052.8MV时,根据传输拥塞管理原理,利用LINGO和MATLAB软件对上述规划模型进行求解,得到调整后的机组。并发现堵塞费用分别为18232.2元和22506元。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Decision-making Model of Optimal Power Distribution Scheme Based on Multiple Linear Regression and Lingo Multi-objective Programming Model
In order to overcome the difficulties in the formulation and decision-making of power distribution schemes, this paper proposes a novel decision-making model for optimal power distribution schemes based on multiple linear regression and Lingo multi-objective programming models. From the perspective of multiple linear regression and Lingo’s multi-objective programming models, the decision-making model follows the "safety first" principle and the principle of minimum cost in the organization, dispatch, and distribution of power grid companies. And according to the load forecast and transaction rules, the optimal power distribution scheme can be designed for the power personnel. The research results show that the difference in load demand leads to different transmission congestion principles and cost settlement methods. Therefore, this paper divides the forecast load demand into three intervals (0,982.9136], (982.9136,1094.500], (1094.500,+ ∞ ], the simulation test was carried out. When the forecasted load demand for the next period is 984.2MV and 1052.8MV, LINGO and MATLAB software are used to solve the deployment mentioned above plan model according to the transmission congestion management principle to obtain the adjusted units. And find the blocking cost is 18232.2 yuan and 22506 yuan.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Data Mining Model of Internet of Things based on Blockchain Technology Study on the Absorption Capacity of Distribution Network with Distributed Power Supply Based on Improved AFSA Research on Early Warning System of Real Estate Financial Risk Based on Convolutional Neural Network Research on Natural Language Processing Problems Based on LSTM Algorithm Design of a Switchable Frequency Selective Surface Absorber / Reflector
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1