泰国湄莫至塔塔哥500千伏线路单线接地故障二次消弧的模拟研究

K. Ngamsanroaj, S. Premrudeepreechacharn, S. Chimklai
{"title":"泰国湄莫至塔塔哥500千伏线路单线接地故障二次消弧的模拟研究","authors":"K. Ngamsanroaj, S. Premrudeepreechacharn, S. Chimklai","doi":"10.1109/UPEC.2008.4651524","DOIUrl":null,"url":null,"abstract":"Successful operation of a power system depends largely on the ability to provide reliable and uninterrupted service to the loads. Single phase switching has become an increasingly more viable approach to the operation of EHV systems in recent years. Indeed, single phase reclosing, if successful, represents a significant step in improving system performance and is an attractive, economical means of obtaining acceptable transient stability with fewer lines. Single phase reclosing has the additional benefits of reducing switching overvoltages. This paper describes the simulation study of secondary arc extinction due to single line to ground fault and then clearing the faulted line. The work is performed by EMTP on the Thailand 500 kV transmission line from Mae Moh to Tha Ta Ko. Various responses of simulation results are presented.","PeriodicalId":287461,"journal":{"name":"2008 43rd International Universities Power Engineering Conference","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Simulation study of the secondary arc extinction due to single line to ground fault on the Thailand 500 kV Line from Mae Moh to Tha Ta Ko\",\"authors\":\"K. Ngamsanroaj, S. Premrudeepreechacharn, S. Chimklai\",\"doi\":\"10.1109/UPEC.2008.4651524\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Successful operation of a power system depends largely on the ability to provide reliable and uninterrupted service to the loads. Single phase switching has become an increasingly more viable approach to the operation of EHV systems in recent years. Indeed, single phase reclosing, if successful, represents a significant step in improving system performance and is an attractive, economical means of obtaining acceptable transient stability with fewer lines. Single phase reclosing has the additional benefits of reducing switching overvoltages. This paper describes the simulation study of secondary arc extinction due to single line to ground fault and then clearing the faulted line. The work is performed by EMTP on the Thailand 500 kV transmission line from Mae Moh to Tha Ta Ko. Various responses of simulation results are presented.\",\"PeriodicalId\":287461,\"journal\":{\"name\":\"2008 43rd International Universities Power Engineering Conference\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-12-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 43rd International Universities Power Engineering Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/UPEC.2008.4651524\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 43rd International Universities Power Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC.2008.4651524","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

电力系统的成功运行在很大程度上取决于向负载提供可靠和不间断服务的能力。近年来,单相开关已成为一种越来越可行的超高压系统运行方式。事实上,单相重合闸如果成功,将是改善系统性能的重要一步,也是一种有吸引力的、经济的方法,可以用更少的线路获得可接受的暂态稳定性。单相重合闸具有降低开关过电压的额外好处。本文对单线接地故障后再对故障线进行清理的二次消弧模拟研究。这项工作由EMTP在泰国从Mae Moh到Tha Ta Ko的500千伏输电线路上进行。给出了仿真结果的各种响应。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Simulation study of the secondary arc extinction due to single line to ground fault on the Thailand 500 kV Line from Mae Moh to Tha Ta Ko
Successful operation of a power system depends largely on the ability to provide reliable and uninterrupted service to the loads. Single phase switching has become an increasingly more viable approach to the operation of EHV systems in recent years. Indeed, single phase reclosing, if successful, represents a significant step in improving system performance and is an attractive, economical means of obtaining acceptable transient stability with fewer lines. Single phase reclosing has the additional benefits of reducing switching overvoltages. This paper describes the simulation study of secondary arc extinction due to single line to ground fault and then clearing the faulted line. The work is performed by EMTP on the Thailand 500 kV transmission line from Mae Moh to Tha Ta Ko. Various responses of simulation results are presented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Study on model of power grid operation security cost in market environment Hybrid cascaded H- bridge multilevel inverter for fuel cell power conditioning systems Fault ride-through capability improvement of wind farms using doubly fed induction generator Protection, transient stability and fault ride-through issues in distribution networks with dispersed generation An architecture of spatial three dimension visualization information platform for urban power grid
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1