预测规划库存的总需求:以泰国社区医院为例

P. Kalaya, P. Termsuksawad, T. Wasusri
{"title":"预测规划库存的总需求:以泰国社区医院为例","authors":"P. Kalaya, P. Termsuksawad, T. Wasusri","doi":"10.1109/IEEM44572.2019.8978541","DOIUrl":null,"url":null,"abstract":"The pattern of lumpy demand affects the healthcare industry such as small community hospitals which encounter sporadic demands of slow-moving medicines. The objective of this work aimed to study performance of forecasting methods for inventory planning. This work compared two forecasting methods: Croston(CR) and the Teunter, Syntetos, and Babai's (TSB) methods. Furthermore, this work proposed a combination of Exponential and Poisson distribution and the use of average inter-demand interval combining with average demand to forecast lumpy demand. It assumed that amount of on-hand inventory would be equal to forecasting values. Mean square error (MSE) and number of shortage period were used as performance indicators of these methods. The simulation used 2 types of vital medicines, obtained from the community hospital in Mae Hong Son province from January 2015 to December 2017. The results from CR and TSB methods provided lower MSEs when the smoothing constants were unchanged until 12 weeks. Meanwhile, adjusting the smoothing constants every 4 weeks provided lower shortages. Meanwhile, the other two proposed methods led to lower shortages comparing with those of CR and TSB methods.","PeriodicalId":255418,"journal":{"name":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Forecasting Lumpy Demand for Planning Inventory: The Case of Community Hospitals in Thailand\",\"authors\":\"P. Kalaya, P. Termsuksawad, T. Wasusri\",\"doi\":\"10.1109/IEEM44572.2019.8978541\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The pattern of lumpy demand affects the healthcare industry such as small community hospitals which encounter sporadic demands of slow-moving medicines. The objective of this work aimed to study performance of forecasting methods for inventory planning. This work compared two forecasting methods: Croston(CR) and the Teunter, Syntetos, and Babai's (TSB) methods. Furthermore, this work proposed a combination of Exponential and Poisson distribution and the use of average inter-demand interval combining with average demand to forecast lumpy demand. It assumed that amount of on-hand inventory would be equal to forecasting values. Mean square error (MSE) and number of shortage period were used as performance indicators of these methods. The simulation used 2 types of vital medicines, obtained from the community hospital in Mae Hong Son province from January 2015 to December 2017. The results from CR and TSB methods provided lower MSEs when the smoothing constants were unchanged until 12 weeks. Meanwhile, adjusting the smoothing constants every 4 weeks provided lower shortages. Meanwhile, the other two proposed methods led to lower shortages comparing with those of CR and TSB methods.\",\"PeriodicalId\":255418,\"journal\":{\"name\":\"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM44572.2019.8978541\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM44572.2019.8978541","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

集中需求的模式影响了医疗保健行业,如小型社区医院,这些医院遇到了对缓慢流动药物的零星需求。本研究的目的是研究库存规划预测方法的性能。本研究比较了两种预测方法:Croston(CR)和Teunter, Syntetos, and Babai (TSB)方法。在此基础上,本文提出将指数分布与泊松分布相结合,利用平均需求间区间与平均需求相结合的方法来预测块状需求。它假设手头库存的数量等于预测值。以均方误差(MSE)和短缺期数作为这些方法的性能指标。模拟使用了2015年1月至2017年12月从湄宏顺省社区医院获得的两种重要药物。CR和TSB方法的结果显示,当平滑常数不变时,mse较低,直至12周。同时,每4周调整平滑常数可以降低短缺。同时,与CR和TSB方法相比,另外两种方法的不足之处也较小。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Forecasting Lumpy Demand for Planning Inventory: The Case of Community Hospitals in Thailand
The pattern of lumpy demand affects the healthcare industry such as small community hospitals which encounter sporadic demands of slow-moving medicines. The objective of this work aimed to study performance of forecasting methods for inventory planning. This work compared two forecasting methods: Croston(CR) and the Teunter, Syntetos, and Babai's (TSB) methods. Furthermore, this work proposed a combination of Exponential and Poisson distribution and the use of average inter-demand interval combining with average demand to forecast lumpy demand. It assumed that amount of on-hand inventory would be equal to forecasting values. Mean square error (MSE) and number of shortage period were used as performance indicators of these methods. The simulation used 2 types of vital medicines, obtained from the community hospital in Mae Hong Son province from January 2015 to December 2017. The results from CR and TSB methods provided lower MSEs when the smoothing constants were unchanged until 12 weeks. Meanwhile, adjusting the smoothing constants every 4 weeks provided lower shortages. Meanwhile, the other two proposed methods led to lower shortages comparing with those of CR and TSB methods.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Locating Humanitarian Relief Effort Facility Using P-Center Method A Method of Fault Identification Considering High Fix Priority in Open Source Project Model-based Systems Engineering Process for Supporting Variant Selection in the Early Product Development Phase A Method of Parameter Estimation in Flexible Jump Diffusion Process Models for Open Source Maintenance Effort Management Kanban-CONWIP Hybrid Model for Improving Productivity of an Electrostatic Coating Process
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1