基于信任的合作情境多元可视化

A. Guerriero, S. Kubicki, G. Halin
{"title":"基于信任的合作情境多元可视化","authors":"A. Guerriero, S. Kubicki, G. Halin","doi":"10.1109/VIZ.2009.48","DOIUrl":null,"url":null,"abstract":"The building construction activity is uncertain by nature because of its specificities (e.g. heterogeneous stakeholders, ephemeral teams, etc.) and particularly, because it corresponds to a particular mode of production \"on site\" and is submitted to variable conditions. So the construction management is essential to guarantee the correct progression of the construction activity. Moreover, trust is a central component in this type of activity to surmount the uncertainty. Therefore, we suggest making a connection between the coordination assistance tool and the notion of trust. This paper suggests representing trust in the correct progression of the activity in order to support the construction management and using this representation to guide user navigation in a multi-visualization environment. It will describe a methodology to identify trust information in a construction activity context, measure trust value and implement a trust-based prototype.","PeriodicalId":315752,"journal":{"name":"2009 Second International Conference in Visualisation","volume":"71 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Trust-Oriented Multi-visualization of Cooperation Context\",\"authors\":\"A. Guerriero, S. Kubicki, G. Halin\",\"doi\":\"10.1109/VIZ.2009.48\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The building construction activity is uncertain by nature because of its specificities (e.g. heterogeneous stakeholders, ephemeral teams, etc.) and particularly, because it corresponds to a particular mode of production \\\"on site\\\" and is submitted to variable conditions. So the construction management is essential to guarantee the correct progression of the construction activity. Moreover, trust is a central component in this type of activity to surmount the uncertainty. Therefore, we suggest making a connection between the coordination assistance tool and the notion of trust. This paper suggests representing trust in the correct progression of the activity in order to support the construction management and using this representation to guide user navigation in a multi-visualization environment. It will describe a methodology to identify trust information in a construction activity context, measure trust value and implement a trust-based prototype.\",\"PeriodicalId\":315752,\"journal\":{\"name\":\"2009 Second International Conference in Visualisation\",\"volume\":\"71 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-07-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Second International Conference in Visualisation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/VIZ.2009.48\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Second International Conference in Visualisation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/VIZ.2009.48","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

建筑施工活动本质上是不确定的,因为它的特殊性(例如,异质的利益相关者,短暂的团队等),特别是,因为它对应于“现场”的特定生产模式,并提交给可变的条件。因此,施工管理对保证施工活动的正确进行至关重要。此外,信任是这类活动中克服不确定性的核心组成部分。因此,我们建议将协调协助工具与信任概念联系起来。本文建议在活动的正确进展中表示信任,以支持施工管理,并使用这种表示来指导用户在多可视化环境中导航。它将描述一种在建筑活动环境中识别信任信息、测量信任价值和实现基于信任的原型的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Trust-Oriented Multi-visualization of Cooperation Context
The building construction activity is uncertain by nature because of its specificities (e.g. heterogeneous stakeholders, ephemeral teams, etc.) and particularly, because it corresponds to a particular mode of production "on site" and is submitted to variable conditions. So the construction management is essential to guarantee the correct progression of the construction activity. Moreover, trust is a central component in this type of activity to surmount the uncertainty. Therefore, we suggest making a connection between the coordination assistance tool and the notion of trust. This paper suggests representing trust in the correct progression of the activity in order to support the construction management and using this representation to guide user navigation in a multi-visualization environment. It will describe a methodology to identify trust information in a construction activity context, measure trust value and implement a trust-based prototype.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Use of Dynamic Interactive 3D Images of Biomedical Devices in Education On-Line Visualization as a Sequence Grid Application for Parametric Studies Segmentation of Printed Urdu Scripts Using Structural Features A Qualitative Evaluation of Implementing Virtual Prototyping in Construction Progressive Geometry-Driven Compression for Triangle Mesh Based on Binary Tree
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1