利用旧工业建筑进行创意产业园风险分担研究

Qiang Wu, Jiayu Li, Xiaoyan Ding, Li Wang, Nasen Li
{"title":"利用旧工业建筑进行创意产业园风险分担研究","authors":"Qiang Wu, Jiayu Li, Xiaoyan Ding, Li Wang, Nasen Li","doi":"10.2991/dramclr-19.2019.39","DOIUrl":null,"url":null,"abstract":"Compared with ordinary buildings, Old industrial buildings have short construction period; Lack of policies, regulations and technical standards. In order to ensure the successful implementation of the old industrial building recycling project, all participants must share the project risks reasonably. This paper takes the project of old industrial building recycling as the research object. Firstly, the Delphi method is adopted to identify the project risk. Based on the incomplete contract theory, the risk is clearly divided into the contracting stage and the risk of the performance stage. Secondly, based on participant satisfaction, build index system of risk sharing, using C-OWA operator for risk sharing weighting, avoid the ill effects of the expert subjective preferences, under TOPSIS and UT theory, form a sharing mode that is complete, reasonably define the responsibility attribution of risks and determine the optimal sharing proportion of Shared risks. Finally, the model is applied to a creative industrial park project transformed from a steel mill in Shanxi province to prove the rationality of the model, and provide reference for the formulation of risk sharing scheme of China's old industrial building recycling project. Keywords—old industrial building; recycling; creative industry park;risk sharing 摘要—旧工业建筑再生利用后与普通建筑物相比,具有建设周 期短,缺乏政策法规及技术标准等特点。为保证旧工业建筑再 生利用项目成功实施,各参与方必须合理分担项目风险。本文 以旧工业建筑再生利用为创意产业园的项目为研究对象,首先 采用 Delphi 法识别项目风险,依据不完全契约理论,将风险 明确划分为缔约阶段风险与履约阶段风险;其次构建基于参与 方满意度的风险分担指标体系,利用 C-OWA 算子对风险分担指 标赋权,避免专家主观偏好带来的不良影响,在此前提下将理 想解法(TOPSIS)与效用理论(UT)相结合,形成一套具有两者优 势及完整的风险分担模型,合理界定风险的责任归属和确定共 担风险的最优分担比例;最后将模型应用到由陕西某钢厂改造 而成的创意产业园项目,证明该模型的合理性,为我国旧工业 建筑再生利用项目风险分担方案制定提供参考。 关键词-旧工业建筑, 再生利用, 创意产业园, 风险分担","PeriodicalId":142201,"journal":{"name":"Proceedings of the Fourth Symposium on Disaster Risk Analysis and Management in Chinese Littoral Regions (DRAMCLR 2019)","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Risk Sharing of Creative Industrial Park by Recycling Old Industrial Buildings\",\"authors\":\"Qiang Wu, Jiayu Li, Xiaoyan Ding, Li Wang, Nasen Li\",\"doi\":\"10.2991/dramclr-19.2019.39\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Compared with ordinary buildings, Old industrial buildings have short construction period; Lack of policies, regulations and technical standards. In order to ensure the successful implementation of the old industrial building recycling project, all participants must share the project risks reasonably. This paper takes the project of old industrial building recycling as the research object. Firstly, the Delphi method is adopted to identify the project risk. Based on the incomplete contract theory, the risk is clearly divided into the contracting stage and the risk of the performance stage. Secondly, based on participant satisfaction, build index system of risk sharing, using C-OWA operator for risk sharing weighting, avoid the ill effects of the expert subjective preferences, under TOPSIS and UT theory, form a sharing mode that is complete, reasonably define the responsibility attribution of risks and determine the optimal sharing proportion of Shared risks. Finally, the model is applied to a creative industrial park project transformed from a steel mill in Shanxi province to prove the rationality of the model, and provide reference for the formulation of risk sharing scheme of China's old industrial building recycling project. Keywords—old industrial building; recycling; creative industry park;risk sharing 摘要—旧工业建筑再生利用后与普通建筑物相比,具有建设周 期短,缺乏政策法规及技术标准等特点。为保证旧工业建筑再 生利用项目成功实施,各参与方必须合理分担项目风险。本文 以旧工业建筑再生利用为创意产业园的项目为研究对象,首先 采用 Delphi 法识别项目风险,依据不完全契约理论,将风险 明确划分为缔约阶段风险与履约阶段风险;其次构建基于参与 方满意度的风险分担指标体系,利用 C-OWA 算子对风险分担指 标赋权,避免专家主观偏好带来的不良影响,在此前提下将理 想解法(TOPSIS)与效用理论(UT)相结合,形成一套具有两者优 势及完整的风险分担模型,合理界定风险的责任归属和确定共 担风险的最优分担比例;最后将模型应用到由陕西某钢厂改造 而成的创意产业园项目,证明该模型的合理性,为我国旧工业 建筑再生利用项目风险分担方案制定提供参考。 关键词-旧工业建筑, 再生利用, 创意产业园, 风险分担\",\"PeriodicalId\":142201,\"journal\":{\"name\":\"Proceedings of the Fourth Symposium on Disaster Risk Analysis and Management in Chinese Littoral Regions (DRAMCLR 2019)\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Fourth Symposium on Disaster Risk Analysis and Management in Chinese Littoral Regions (DRAMCLR 2019)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2991/dramclr-19.2019.39\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Fourth Symposium on Disaster Risk Analysis and Management in Chinese Littoral Regions (DRAMCLR 2019)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/dramclr-19.2019.39","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

与普通建筑相比,老工业建筑施工周期短;缺乏政策、法规和技术标准。为了保证旧工业建筑回收项目的顺利实施,各参与方必须合理分担项目风险。本文以老工业建筑回收项目为研究对象。首先,采用德尔菲法对项目风险进行识别。根据不完全合同理论,将风险明确分为合同阶段和履约阶段风险。其次,基于参与者满意度,构建风险分担指标体系,使用C-OWA算子进行风险分担权重,避免专家主观偏好的不良影响,在TOPSIS和UT理论下,形成完整的分担模式,合理界定风险的责任归属,确定共享风险的最优分担比例。最后,将该模型应用于山西某钢厂改造的创意产业园项目,验证了模型的合理性,为中国老工业建筑回收项目风险分担方案的制定提供参考。关键词:老工业建筑;回收;创意产业园区;风险分担摘要——旧工业建筑再生利用后与普通建筑物相比,具有建设周期短,缺乏政策法规及技术标准等特点。为保证旧工业建筑再 生利用项目成功实施,各参与方必须合理分担项目风险。本文以旧工业建筑再生利用为创意产业园的项目为研究对象,首先采用德尔菲法识别项目风险,依据不完全契约理论,将风险明确划分为缔约阶段风险与履约阶段风险;其次构建基于参与方满意度的风险分担指标体系,利用C-OWA算子对风险分担指标赋权,避免专家主观偏好带来的不良影响,在此前提下将理想解法(TOPSIS)与效用理论(UT)相结合,形成一套具有两者优势及完整的风险分担模型,合理界定风险的责任归属和确定共担风险的最优分担比例;最后将模型应用到由陕西某钢厂改造而成的创意产业园项目,证明该模型的合理性,为我国旧工业建筑再生利用项目风险分担方案制定提供参考。关键词-旧工业建筑, 再生利用, 创意产业园, 风险分担
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Research on Risk Sharing of Creative Industrial Park by Recycling Old Industrial Buildings
Compared with ordinary buildings, Old industrial buildings have short construction period; Lack of policies, regulations and technical standards. In order to ensure the successful implementation of the old industrial building recycling project, all participants must share the project risks reasonably. This paper takes the project of old industrial building recycling as the research object. Firstly, the Delphi method is adopted to identify the project risk. Based on the incomplete contract theory, the risk is clearly divided into the contracting stage and the risk of the performance stage. Secondly, based on participant satisfaction, build index system of risk sharing, using C-OWA operator for risk sharing weighting, avoid the ill effects of the expert subjective preferences, under TOPSIS and UT theory, form a sharing mode that is complete, reasonably define the responsibility attribution of risks and determine the optimal sharing proportion of Shared risks. Finally, the model is applied to a creative industrial park project transformed from a steel mill in Shanxi province to prove the rationality of the model, and provide reference for the formulation of risk sharing scheme of China's old industrial building recycling project. Keywords—old industrial building; recycling; creative industry park;risk sharing 摘要—旧工业建筑再生利用后与普通建筑物相比,具有建设周 期短,缺乏政策法规及技术标准等特点。为保证旧工业建筑再 生利用项目成功实施,各参与方必须合理分担项目风险。本文 以旧工业建筑再生利用为创意产业园的项目为研究对象,首先 采用 Delphi 法识别项目风险,依据不完全契约理论,将风险 明确划分为缔约阶段风险与履约阶段风险;其次构建基于参与 方满意度的风险分担指标体系,利用 C-OWA 算子对风险分担指 标赋权,避免专家主观偏好带来的不良影响,在此前提下将理 想解法(TOPSIS)与效用理论(UT)相结合,形成一套具有两者优 势及完整的风险分担模型,合理界定风险的责任归属和确定共 担风险的最优分担比例;最后将模型应用到由陕西某钢厂改造 而成的创意产业园项目,证明该模型的合理性,为我国旧工业 建筑再生利用项目风险分担方案制定提供参考。 关键词-旧工业建筑, 再生利用, 创意产业园, 风险分担
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Characteristics of Climate Change in Latest 60 Years and Extreme Severe Weather in latest 10 Years in Qinhuangdao Improvement measures of questionnaire design for risk communication in Internet of intelligences Using Game Theory Approach for Assessment of Risk and Police Patrols Scheduling Research on Risk Sharing of Creative Industrial Park by Recycling Old Industrial Buildings Research on Financial Early Warning of Big Data Enterprises Based on Logistic Regression and BP Neural Network
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1