石油泄漏后:JIC的转型

Gerry Yemen, E. H. James
{"title":"石油泄漏后:JIC的转型","authors":"Gerry Yemen, E. H. James","doi":"10.2139/ssrn.2974806","DOIUrl":null,"url":null,"abstract":"What if you were responsible for the day-to-day operations at the Joint Information Center (JIC) at the Unified Incident Command for the BP Gulf of Mexico oil spill? Suitable for MBA, EMBA, GEMBA, and executive education classes, this case offers insights about leadership in complex situations. A media supplement, providing the oil spill background and a visual stakeholder analysis of the situation, may be used alone or in conjunction with this case.United States Coast Guard Reserve Senior Chief Petty Officer Barbara Voulgaris has a lot on her plate. She needs to work on the six-day-on, one-day-off rotation proposal for her new boss, who had only been there a few days. She wondered if she should talk to him about the standard operating procedure (SOP) she had started, documenting the JIC's workflow process for her replacement when she rotated out in mid-July. Would he be responsive to her ideas? What needed to be dealt with immediately and what could she put on hold? What issues were urgent? What issues were important?United States Coast Guard Reserve Senior Chief Petty Officer Barbara Voulgaris has a lot on her plate. She needs to work on the six-day-on, one-day-off rotation proposal for her new boss, who had only been there a few days. She wondered if she should talk to him about the standard operating procedure (SOP) she had started, documenting the JIC's workflow process for her replacement when she rotated out in mid-July. Would he be responsive to her ideas? What needed to be dealt with immediately and what could she put on hold? What issues were urgent? What issues were important? \nExcerpt \nUVA-OB-1011 \nAug. 18, 2010 \n“How many miles of shoreline are impacted?” the reporter asked. \n“We don't really have good figures at this point, because we're dealing with four states,” United States Coast Guard Reserve Senior Chief Petty Officer Barbara Voulgaris replied. “So it is virtually impossible to have an exact number of miles.” \n“How can you not know that, and when do you expect you will be able to answer my question?” \n. . .","PeriodicalId":234456,"journal":{"name":"Politics & Energy eJournal","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-05-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"After the Oil Spills: Transformation at the JIC\",\"authors\":\"Gerry Yemen, E. H. James\",\"doi\":\"10.2139/ssrn.2974806\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"What if you were responsible for the day-to-day operations at the Joint Information Center (JIC) at the Unified Incident Command for the BP Gulf of Mexico oil spill? Suitable for MBA, EMBA, GEMBA, and executive education classes, this case offers insights about leadership in complex situations. A media supplement, providing the oil spill background and a visual stakeholder analysis of the situation, may be used alone or in conjunction with this case.United States Coast Guard Reserve Senior Chief Petty Officer Barbara Voulgaris has a lot on her plate. She needs to work on the six-day-on, one-day-off rotation proposal for her new boss, who had only been there a few days. She wondered if she should talk to him about the standard operating procedure (SOP) she had started, documenting the JIC's workflow process for her replacement when she rotated out in mid-July. Would he be responsive to her ideas? What needed to be dealt with immediately and what could she put on hold? What issues were urgent? What issues were important?United States Coast Guard Reserve Senior Chief Petty Officer Barbara Voulgaris has a lot on her plate. She needs to work on the six-day-on, one-day-off rotation proposal for her new boss, who had only been there a few days. She wondered if she should talk to him about the standard operating procedure (SOP) she had started, documenting the JIC's workflow process for her replacement when she rotated out in mid-July. Would he be responsive to her ideas? What needed to be dealt with immediately and what could she put on hold? What issues were urgent? What issues were important? \\nExcerpt \\nUVA-OB-1011 \\nAug. 18, 2010 \\n“How many miles of shoreline are impacted?” the reporter asked. \\n“We don't really have good figures at this point, because we're dealing with four states,” United States Coast Guard Reserve Senior Chief Petty Officer Barbara Voulgaris replied. “So it is virtually impossible to have an exact number of miles.” \\n“How can you not know that, and when do you expect you will be able to answer my question?” \\n. . .\",\"PeriodicalId\":234456,\"journal\":{\"name\":\"Politics & Energy eJournal\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-05-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Politics & Energy eJournal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.2974806\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Politics & Energy eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.2974806","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

如果你负责英国石油公司墨西哥湾漏油事件联合事故指挥部联合信息中心(JIC)的日常运作呢?本案例适用于MBA、EMBA、GEMBA和高管教育课程,提供了关于复杂情况下领导力的见解。媒体补充,提供石油泄漏的背景和可视化的利益相关者分析的情况,可以单独使用,也可以与本案结合使用。美国海岸警卫队预备役高级士官芭芭拉·沃格里斯有很多事情要做。她需要为刚上任几天的新老板制定6天上班、1天休息的轮休方案。她想知道她是否应该和他谈谈她已经开始的标准操作程序(SOP),该程序记录了JIC的工作流程,以便她在7月中旬轮岗时接替她。他会对她的想法做出回应吗?哪些事情需要立即处理,哪些事情可以暂时搁置?哪些问题是紧急的?哪些问题是重要的?美国海岸警卫队预备役高级士官芭芭拉·沃格里斯有很多事情要做。她需要为刚上任几天的新老板制定6天上班、1天休息的轮休方案。她想知道她是否应该和他谈谈她已经开始的标准操作程序(SOP),该程序记录了JIC的工作流程,以便她在7月中旬轮岗时接替她。他会对她的想法做出回应吗?哪些事情需要立即处理,哪些事情可以暂时搁置?哪些问题是紧急的?哪些问题是重要的?摘录UVA-OB-1011 2010年8月18日“有多少英里的海岸线受到影响?记者问道。美国海岸警卫队预备役高级士官芭芭拉·沃格里斯(Barbara Voulgaris)回答说:“目前我们还没有确切的数据,因为我们要处理的是四个州。”“所以实际上不可能知道确切的里程数。”“你怎么可能不知道呢?你指望什么时候能回答我的问题呢?“……
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
After the Oil Spills: Transformation at the JIC
What if you were responsible for the day-to-day operations at the Joint Information Center (JIC) at the Unified Incident Command for the BP Gulf of Mexico oil spill? Suitable for MBA, EMBA, GEMBA, and executive education classes, this case offers insights about leadership in complex situations. A media supplement, providing the oil spill background and a visual stakeholder analysis of the situation, may be used alone or in conjunction with this case.United States Coast Guard Reserve Senior Chief Petty Officer Barbara Voulgaris has a lot on her plate. She needs to work on the six-day-on, one-day-off rotation proposal for her new boss, who had only been there a few days. She wondered if she should talk to him about the standard operating procedure (SOP) she had started, documenting the JIC's workflow process for her replacement when she rotated out in mid-July. Would he be responsive to her ideas? What needed to be dealt with immediately and what could she put on hold? What issues were urgent? What issues were important?United States Coast Guard Reserve Senior Chief Petty Officer Barbara Voulgaris has a lot on her plate. She needs to work on the six-day-on, one-day-off rotation proposal for her new boss, who had only been there a few days. She wondered if she should talk to him about the standard operating procedure (SOP) she had started, documenting the JIC's workflow process for her replacement when she rotated out in mid-July. Would he be responsive to her ideas? What needed to be dealt with immediately and what could she put on hold? What issues were urgent? What issues were important? Excerpt UVA-OB-1011 Aug. 18, 2010 “How many miles of shoreline are impacted?” the reporter asked. “We don't really have good figures at this point, because we're dealing with four states,” United States Coast Guard Reserve Senior Chief Petty Officer Barbara Voulgaris replied. “So it is virtually impossible to have an exact number of miles.” “How can you not know that, and when do you expect you will be able to answer my question?” . . .
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Attaining Net-Zero through a GHG-Economic Sector The Green Transition in Oil Dependent Economies in the MENA Region 'Turning off the Pumps, Breaking the Oil Addiction, and Greening the Desert' Case Study: A Non-Oil Future for Saudi Arabia and Algeria? Captured: Regulating to 1.5C through Tax, Section 45Q and Escaping from Regressive Pitfalls The Comparison of Regression Models and Artificial Neural Networks in Predicting Power Generation in a Thermal Coal Power Plant Evaluation of Artificial Lift Methods to Increase Oil Production from Depleting Oil Wells in Gulf of Mexico
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1